Texas State Technical College System
Contratos
Contratos activos · Todos los contratos
2150 contratos, de mayor a menor.
-
US BANK NATIONAL ASSOCIATION50,000 dólares
Retail Fuel Card Services
-
Vistar Corporation50,000 dólares
Consumables-Food Service
-
SLONE CONSTRUCTION CO49,885 dólares
Construct a monument sign for Marshall campus
-
KD REMODELING49,800 dólares
Kitchen remodeling Red River "G
-
JRJ ENTERPRISES LLC49,650 dólares
EEC Room 152 Renovations Waco
-
KD REMODELING49,447 dólares
Renovate Kitchen Cabinets-Red River Apts.
-
JRJ ENTERPRISE LLC48,988 dólares
Renovations of the PBE building at Ft Bend
-
JRJ ENTERPRISE LLC48,210 dólares
Exterior painting of ACT I Hanger
-
MARSHALL ECONOMIC DEVELOPMENT CORPORATION48,134 dólares
Office & Classroom Space Lease Agreement Marshall
-
MEDCO48,134 dólares
Lease for office and classroom space in Marshall
-
AAR INCORPORATED46,900 dólares
4OSC Old Student Center Demolition Sweetwater
-
ELSEVIER46,763 dólares
Books - aux
-
THOMAS MILLER46,450 dólares
Evaluation Services
-
NEMMER ELECTRIC INC44,788 dólares
Fiber Relocate Labor Waco
-
Unique Signs, Inc.42,759 dólares
Campus Signs & Installation Brownwood
-
KD REMODELING42,000 dólares
Waco JBC 3rd Floor Renovations
-
LOCHRIDGE-PRIEST INC41,043 dólares
HVAC Framework & Ductwork for Labs Harlingen
-
WALKER PARTNERS LLC40,500 dólares
Griffith Hall Storm Drainage Improvements
-
SOUTH TEXAS INTERPRETERS FOR THE DEAF LLC40,000 dólares
Sign language interpreter service in Harlingen
-
LOCHRIDGE-PRIEST INC39,911 dólares
Walk In Cooler-Freezer Renovation (Waco)
-
KD REMODELING39,477 dólares
Building Renovations
-
KD REMODELING39,400 dólares
Kitchen Renovation Red River Apts (Waco)
-
RED RIVER TECHNOLOGY LLC39,395 dólares
Professional Service for Communication Assessment
-
LOCHRIDGE-PRIEST INC39,251 dólares
HVAC Framework & Ductwork for Labs Ft Bend
-
HUCKABEE AND ASSOCIATES INC37,900 dólares
JBC Multi-Functional Event Center Renovation Waco
-
Raydon, Inc.37,060 dólares
Abilene Campus Parking Lot Repair
-
KING CONSULTANTS INC36,165 dólares
Abatement Admin & Compliance Monitoring 4OSC
-
PBK Architects, Inc.35,500 dólares
Architectural Services for Ft. Bend Capacity
-
STEVEN BURTON35,416 dólares
4ABC Abilene Regional Interior Painting
-
CSP UTILITIES, LLC35,411 dólares
Sidewalk Removal & Replacement Waco
-
DANIEL WALLING35,380 dólares
New Grind Lab at ITC (Waco)
-
ENPROTEC/HIBBS & TODD INC35,000 dólares
Prof. Design Svc for Loop Road Paving Project.
-
HONEYS ROOFING LLC34,862 dólares
Roof Repairs Parachute and Dinghy (Waco)
-
STEVEN BURTON34,505 dólares
Student Center Roof Painting Sweetwater
-
DANIEL WALLING34,350 dólares
Diesel Bldg Renovations
-
LOCHRIDGE-PRIEST INC33,752 dólares
HVAC Framework & Ductwork for Labs North TX
-
LOCHRIDGE-PRIEST INC33,752 dólares
HVAC Framework & Ductwork for Labs Hutto
-
HONEYS ROOFING LLC31,990 dólares
Roof Repairs Fentress Building (Waco)
-
TERRACON CONSULTANTS INC31,362 dólares
Materials Testing - Chiller Plant HRL
-
TERRACON CONSULTANTS INC31,291 dólares
Engineering for ITC Grinding Booths Building
-
LOCHRIDGE-PRIEST INC29,897 dólares
Lineman Mitsubishi Condenser Replacement Waco
-
JRJ ENTERPRISE LLC29,510 dólares
Physical Plant Renovation Marshall
-
SWEETWATER INDUSTRIAL FOUNDATION29,400 dólares
Annual Hanger Lease
-
LOCHRIDGE-PRIEST INC28,048 dólares
Installation of three 5-ton HVAC units
-
HONEYS ROOFING LLC27,489 dólares
Roof Repairs Auto Collision (Waco)
-
A & V ROOFING CO LLC27,250 dólares
Building B Dorms Harlingen
-
HONEYS ROOFING LLC27,000 dólares
Installation of Metal Panels Parachute and Dinghy
-
T-Bar Interprises LLC dba Home Remedy26,293 dólares
Countertop Project Sweetwater
-
LANGERMAN ENGINEERING COMPANY25,734 dólares
Water/wastewater line repair at TSTC Waco.
-
WALKER PARTNERS LLC25,300 dólares
Engineer for Lucky Branch Tributary Stormwater
Fuente: la base de datos de contratos de la Junta de Presupuesto Legislativo (en inglés), al noviembre 15, 2026, según lo informado por cada agencia. Los valores son el total de cada contrato durante toda su vigencia, que puede abarcar varios años, no el gasto de un solo año. Activo significa adjudicado y aún sin pasar su fecha de terminación.