Texas Department of Transportation
Contratos
Contratos activos · Todos los contratos
29404 contratos, de mayor a menor.
-
MARTIN MARIETTA MATERIALS INC74,948 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX
-
PRESTIGE ELEVATOR SERVICES LLC74,928 dólares
ELEVATOR MAINTENANCE AND REPAIR SERVICES
-
BULLCHASE INC74,925 dólares
CONES, TRAFFIC
-
T F R ENTERPRISES INC74,920 dólares
Roadway Routine Maintenance
-
LAKE COUNTRY CHEVROLET74,908 dólares
Series 2520 Class 2B - Full Size Pickup, Crew Cab
-
YELLOWSTONE LANDSCAPE - CENTRAL INC74,898 dólares
Roadway Routine Maintenance
-
SAM PACK'S FIVE STAR FORD LTD74,872 dólares
Class 2A - Full Size Pickup, Extended Cab
-
ERGON ASPHALT & EMULSIONS INC74,851 dólares
ASPHALT EMULSIFIED IN ACCORDANCE WITH ITEM
-
WORKQUEST74,850 dólares
POSTS, DELINEATOR, FLEXIBLE, DRIVEABLEASSEMBLY, PO
-
WALLER COUNTY ASPHALT INC74,832 dólares
PATCHING MATERIAL ASPHALTIC CONCRETE STOCKPILE
-
WENZEL WENZEL & ASSOCIATES INC74,832 dólares
CONES, TRAFFIC, PLASTIC CONE,
-
CENTURY ASPHALT LTD74,820 dólares
ASPHALTIC CONCRETE PAVEMENT, HOT MIX, IN ACCO
-
MILLENIUM PRODUCTS INC74,813 dólares
Portable Traffic Signal-Solar
-
J-MEN CONCRETE CONSTRUCTION74,802 dólares
Roadway Routine Maintenance
-
VULCAN CONSTRUCTION MATERIALS LP74,798 dólares
ASPHALTIC CONCRETE PAVEMENT, HOT MIX, IN ACCOR
-
WALLER COUNTY ASPHALT INC74,784 dólares
PATCHING MATERIAL ASPHALTIC CONCRETE STOCKPILE
-
WALLER COUNTY ASPHALT INC74,784 dólares
PATCHING MATERIAL ASPHALTIC CONCRETE STOCKPILE
-
TEXAS A & M UNIVERSITY KINGSVILLE74,767 dólares
Research and Technology Implementation
-
PLANT FUEL LLC74,757 dólares
Roadway Routine Maintenance
-
VULCAN CONSTRUCTION MATERIALS LP74,740 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX, IN ACC
-
EAST TEXAS ASPHALT CO., LTD.74,724 dólares
ASPHALTIC CONCRETE PAVEMENT HOT MIX IN ACCORDANCE
-
VULCAN CONSTRUCTION MATERIALS LP74,720 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX
-
SWCA INC74,690 dólares
Aviation Grant Funded - Agent for Local Sponsor
-
VULCAN CONSTRUCTION MATERIALS LP74,685 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX IN
-
SWENSON SPREADER LLC74,670 dólares
SPREADERS, MATERIAL, UNDER TAILGATE
-
VULCAN CONSTRUCTION MATERIALS LP74,669 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX, IN ACC
-
VULCAN CONSTRUCTION MATERIALS LP74,666 dólares
ASPHALTIC CONCRETE PAVEMENT, HOT MIX, IN ACCO
-
CAPITOL AGGREGATES INC74,648 dólares
AGGREGATE SURFACE IN ACCORDANCE WITH ITEM 302
-
EAST TEXAS ASPHALT CO., LTD.74,640 dólares
ASPHALTIC CONCRETE HOT MIX IN.TYPE D
-
WALLER COUNTY ASPHALT INC74,640 dólares
PATCHING MATERIAL ASPHALTIC CONCRETE STOCKPILE
-
WALLER COUNTY ASPHALT INC74,640 dólares
PATCHING MATERIAL ASPHALTIC CONCRETE STOCKPILE
-
DREWERY CONSTRUCTION CO INC74,618 dólares
Hauling Services Aggregate
-
PFVT MOTORS, LLC74,616 dólares
TRUCK, CAB AND CHASSIS
-
TEXAS A&M TRANSPORTATION INSTITUTE - TTI74,601 dólares
Traffic Safety Grant
-
CITY OF BROWNSVILLE74,587 dólares
Traffic Safety Grant
-
KSA ENGINEERS74,587 dólares
Aviation Grant Funded - Agent for Local Sponsor
-
COFFMAN ASSOCIATES INC74,555 dólares
Aviation Grant Funded - Agent for Local Sponsor
-
COLORADO MATERIALS LTD74,521 dólares
ASPHALTIC CONCRETE PAVEMENT HOT MIX IN
-
ITERIS INC74,520 dólares
Controllers, Traffic Signal NEMA TS2,
-
WALLER COUNTY ASPHALT INC74,520 dólares
PATCHING MATERIAL, ASPHALTIC CONCRETE, STOCKPILE
-
ERGON ASPHALT & EMULSIONS INC74,516 dólares
ASPHALT, EMULSIFIED, POLYMER, (HOMOGENEOUS), IN
-
MARTIN MARIETTA MATERIALS74,510 dólares
LIMESTONE ROCK ASPHALT PAVEMENT COLD MIX IN ACCORD
-
SAM PACK'S FIVE STAR FORD74,485 dólares
TRUCK CAB AND CHASSIS
-
SAM PACK'S FIVE STAR FORD74,485 dólares
TRUCK CAB AND C
-
SAM PACK'S FIVE STAR FORD74,485 dólares
TRUCK CAB AND CHASSIS
-
SAM PACK'S FIVE STAR FORD74,485 dólares
TRUCK CAB AND CHASSIS
-
WORKQUEST (formerly TIBH)74,485 dólares
Roadway Routine Maintenance
-
SB MANUFACTURING INC74,434 dólares
Sweeper, Road
-
SB MANUFACTURING INC74,434 dólares
Sweeper, Road
-
SB MANUFACTURING INC74,434 dólares
Sweeper, Road,
Fuente: la base de datos de contratos de la Junta de Presupuesto Legislativo (en inglés), al noviembre 22, 2026, según lo informado por cada agencia. Los valores son el total de cada contrato durante toda su vigencia, que puede abarcar varios años, no el gasto de un solo año. Activo significa adjudicado y aún sin pasar su fecha de terminación.