General Land Office
Contratos
Contratos activos · Todos los contratos
3536 contratos, de mayor a menor.
-
Commercial Vehicle Leasing, L.L.C.322,676 dólares
Lease: 12 Vehicles with a 2yr lease term
-
TEXAS A&M UNIVERSITY CORPUS CHRISTI321,570 dólares
Beach Maintenance Plan : Annual Monitoring Surveys
-
CITY OF NORMANGEE321,113 dólares
CDBG-DR 2015 Flood - Normangee - Drainage
-
CITY OF CONROE321,091 dólares
Conduct Sewer Infrastructure Improvements
-
HDR Engineering320,553 dólares
Design & Permits - Breakwaters Galv Island TX Park
-
CITY OF CLARKSVILLE CITY319,250 dólares
CDBG Round 2 Grantee
-
University of North Texas317,811 dólares
R&D Development: Oil Spill Response & Assessment
-
FIRETROL Protection Systems, Inc.316,880 dólares
McAllen TSVH - Fire Alarm Replc
-
Texas A&M Engineering Experiment Station316,868 dólares
Framework Modeling Tx Coast Waves
-
Ford, Powell & Carson Architects & Planners, Inc.316,380 dólares
Alamo MP Comprehensive Needs Assessment
-
InfoStrat315,388 dólares
Laptops
-
BARFIELD HOME INSPECTIONS313,958 dólares
CDBG Professional Engineering Services
-
Keepthinking Ltd312,240 dólares
Map Store System
-
CITY OF WIMBERLEY311,217 dólares
2015 Floods Infrastructure Most Impacted
-
The Park Board of Trustees of the City of Galveston311,000 dólares
Special disbursement - Beach Patrol Services
-
The Park Board of Trustees of the City of Galveston311,000 dólares
Special disbursement - Beach Patrol Services
-
The Park Board of Trustees of the City of Galveston311,000 dólares
Special Disbursement - General Appropriations
-
City of Columbus310,663 dólares
Conduct drainage Infrastructure Improvements
-
WILLACY COUNTY310,525 dólares
2015 Floods - Infrastructure
-
UNIVERSITY OF TEXAS AT DALLAS310,277 dólares
Research and Development - Open Coastal Ocean Conn
-
CITY OF SOMERVILLE310,200 dólares
Drainage infrastructure improvements
-
CITY OF BRENHAM310,182 dólares
Drainage Improvement Activities
-
Harris County309,007 dólares
2015 Floods - Housing Most Impacted
-
Atkins North America, Inc.308,641 dólares
Engineering Oliver Point Shoreline Phase 1
-
WW HOUSE, INC.307,766 dólares
RVs
-
JASPER COUNTY307,701 dólares
CDBG-DR 2015 Flood - Jasper County - Street Imp.
-
Texas A&M University306,944 dólares
Improve TABS infrastructure
-
TEXAS A AND M UNIVERSITY CORPUS CHRISTI306,724 dólares
Beach Monitoring & Maint Plan : 2019 Annual Survey
-
WALKER CAD305,716 dólares
Round 2.2 Grantee Award for the CDBG DR Program
-
THG ENERGY SOLUTIONS LLC305,575 dólares
Provide Utility and Energy Data
-
HDR Engineering304,553 dólares
North Cameron County Beach Nourishment Phase 1
-
City of Ingleside304,320 dólares
Acquisition program
-
University of North Texas304,104 dólares
Photo-enhanced toxicity of chemical countermeasure
-
Mott MacDonald, LLC303,714 dólares
Swan Point Shoreline Restoration PH II
-
Texas A&M University – Corpus Christi302,803 dólares
Canine oil detection
-
CITY OF KOUNTZE302,500 dólares
Community Development Block Grant Disaster Recover
-
HDR Engineering300,710 dólares
Engineering - CEPRA 1661 Port Aransas Harvey
-
ALEXANDER DUBOSE & JEFFERSON LLP300,000 dólares
Outside Legal Counsel Services
-
CITY OF ALVARADO300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF ALVORD300,000 dólares
Develop and Adopt Comprehensive Plan
-
City of Archer City300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF ATHENS300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF BEAUMONT300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF BLANCO300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF BONHAM300,000 dólares
Develop and Adopt Comprehensive Plan
-
City of Bowie300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF CISCO300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF CLIFTON300,000 dólares
Develop and Adopt Comprehensive Plan
-
City of Coldspring300,000 dólares
Develop and Adopt Comprehensive Plan
-
CITY OF COLUMBUS300,000 dólares
Develop and Adopt Comprehensive Plan
Fuente: la base de datos de contratos de la Junta de Presupuesto Legislativo (en inglés), al noviembre 15, 2026, según lo informado por cada agencia. Los valores son el total de cada contrato durante toda su vigencia, que puede abarcar varios años, no el gasto de un solo año. Activo significa adjudicado y aún sin pasar su fecha de terminación.