Introduced
El texto subrayado se agregaría a la ley vigente. El texto tachado se eliminaría.
| 90R1028 SCR-F | ||
| By: Hall | S.B. No. 435 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the permitting of renewable energy generation | |
| facilities; authorizing fees. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter C, Chapter 15, Utilities Code, is | |
| amended by adding Section 15.053 to read as follows: | |
| Sec. 15.053. COMPLAINT REGARDING RENEWABLE ENERGY | |
| GENERATION FACILITIES. (a) An affected person may complain to the | |
| commission in writing setting forth an act or omission by an owner | |
| or operator of a renewable energy generation facility in violation | |
| or claimed violation of Subchapter F, Chapter 35. | |
| (b) The commission shall keep for a reasonable period an | |
| information file about each complaint filed with the commission | |
| relating to an owner or operator of a renewable energy generation | |
| facility. | |
| (c) The commission, at least quarterly and until final | |
| disposition of the written complaint, shall notify the parties to | |
| the complaint of the status of the complaint unless the notice would | |
| jeopardize an undercover investigation. | |
| SECTION 2. Chapter 35, Utilities Code, is amended by adding | |
| Subchapter F to read as follows: | |
| SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT | |
| Sec. 35.201. DEFINITIONS; APPLICABILITY. (a) In this | |
| subchapter: | |
| (1) "Permit holder" means a person who holds a permit | |
| issued under this subchapter. | |
| (2) "Person" includes an electric cooperative and a | |
| municipally owned utility. | |
| (3) "Renewable energy generation facility" means: | |
| (A) a wind power facility as defined by Section | |
| 301.0001; | |
| (B) a solar power facility as defined by Section | |
| 302.0001; | |
| (C) a battery energy storage facility as defined | |
| by Section 303.0001 or another type of electric energy storage | |
| facility; or | |
| (D) a renewable power facility. | |
| (4) "Renewable power facility" means a facility that: | |
| (A) generates electric energy using a renewable | |
| energy technology, as defined by Section 39.916, other than a | |
| technology that relies exclusively on wind or solar energy; and | |
| (B) is not an electric energy storage facility. | |
| (b) The permit requirements of this subchapter apply to a | |
| renewable energy generation facility regardless of whether the | |
| facility is the subject of a facility agreement entered into under | |
| Chapter 301, 302, or 303. | |
| (c) This subchapter applies only to a renewable energy | |
| generation facility that is intended to be used to sell energy or | |
| ancillary services at wholesale. | |
| Sec. 35.202. PERMIT REQUIRED. (a) A person may not | |
| interconnect a renewable energy generation facility to a | |
| transmission facility unless the person holds a permit to operate a | |
| renewable energy generation facility issued by the commission under | |
| this subchapter. | |
| (b) The commission by rule shall require each permitted | |
| renewable energy generation facility to be installed only in a | |
| location that: | |
| (1) for a solar power facility, is at least: | |
| (A) 500 feet from any property line, unless the | |
| permit holder has obtained a written waiver from each owner of | |
| property located less than 500 feet from the permitted facility; | |
| and | |
| (B) 500 feet from any habitable structure, unless | |
| the permit holder has obtained a written waiver from each owner of | |
| the habitable structure; | |
| (2) for a wind power facility, is at least twice the | |
| height of the wind turbine, including the blades of the turbine, | |
| from the property line of each property that borders the property on | |
| which the permitted facility is located, unless the permit holder | |
| has obtained a written waiver from each owner of property located in | |
| the applicable area; and | |
| (3) for a battery energy storage facility, is at | |
| least: | |
| (A) 500 feet from any property line, unless the | |
| permit holder has obtained a written waiver from each owner of | |
| property located less than 500 feet from the permitted facility; | |
| and | |
| (B) 500 feet from: | |
| (i) public ways; | |
| (ii) buildings; | |
| (iii) stored combustible materials; | |
| (iv) hazardous materials; | |
| (v) high-piled stock; and | |
| (vi) other exposure hazards not associated | |
| with electrical grid infrastructure. | |
| (c) The commission by rule shall require: | |
| (1) each permitted renewable energy generation | |
| facility to be installed only in a location that, in the event of an | |
| emergency at the site of the permitted renewable energy generation | |
| facility, will not block the only access point to a residential | |
| area; or | |
| (2) an alternate access point to be constructed for | |
| any residential area in which an emergency at the site of the | |
| permitted facility could block the only access point to the | |
| residential area. | |
| (d) A person may apply for a permit under this subchapter by | |
| filing with the commission: | |
| (1) a description of the proposed location of the | |
| renewable energy generation facility; | |
| (2) a description of the type of renewable energy | |
| generation facility; | |
| (3) a statement identifying the fire department, as | |
| defined by Section 419.021, Government Code, volunteer fire | |
| department, fire marshal, or other first responder entity that may | |
| reasonably be expected to be the primary first responder to a fire | |
| at the location of the renewable energy generation facility; | |
| (4) a statement that the person has provided written | |
| notice to the entity identified in Subdivision (3) of the | |
| applicant's intent to install a renewable energy generation | |
| facility; | |
| (5) evidence of insurance coverage sufficient to | |
| insure against losses arising from the operation of the renewable | |
| energy generation facility; and | |
| (6) any other information required by commission rule. | |
| (e) When an application for a permit, or an amendment to a | |
| permit issued under this section, is filed, the commission shall | |
| give notice of the application to the county judge of the county in | |
| which all or a majority of the renewable energy generation facility | |
| is proposed to be located. The county shall publish the notice in | |
| at least three consecutive issues of a newspaper with general | |
| circulation in the county. The county shall also publish the notice | |
| on the county's Internet website. The county may not remove the | |
| notice from its Internet website after publication. | |
| (f) The commission may hold one or more public meetings on a | |
| permit application in the county in which the renewable energy | |
| generation facility is proposed to be located. The commission | |
| shall hold a public meeting: | |
| (1) on the request of a member of the legislature who | |
| represents the area in which the renewable energy generation | |
| facility is proposed to be located; or | |
| (2) if the commission determines there is substantial | |
| public interest in the proposed permit. | |
| (g) The commission by order or rule may delegate to the | |
| executive director or another commission employee the authority to | |
| hold a public meeting under this section. | |
| (h) The commission may approve an application for a permit | |
| only if the commission finds that: | |
| (1) issuance of the permit would not violate state or | |
| federal law; and | |
| (2) the location of the proposed renewable energy | |
| generation facility complies with rules adopted under Subsections | |
| (b) and (c). | |
| (i) The commission by rule shall adopt a fee to be imposed on | |
| each permit applicant to cover costs associated with implementing | |
| this section. | |
| (j) For purposes of this subchapter: | |
| (1) a provision of Subchapter B or E, Chapter 14, that | |
| authorizes the commission to regulate a public utility also applies | |
| to a person required to obtain a permit under this section, | |
| including an electric cooperative or a municipally owned utility; | |
| and | |
| (2) a reference in Chapter 15 to a person includes a | |
| person required to obtain a permit under this section, including an | |
| electric cooperative or a municipally owned utility. | |
| SECTION 3. As soon as practicable after the effective date | |
| of this Act, the Public Utility Commission of Texas shall adopt | |
| rules to effectuate the changes in law made by this Act. | |
| SECTION 4. This Act takes effect immediately if it receives | |
| a vote of two-thirds of all the members elected to each house, as | |
| provided by Section 39, Article III, Texas Constitution. If this | |
| Act does not receive the vote necessary for immediate effect, this | |
| Act takes effect September 1, 2027. |