SB 43590th Legislature (2027)

Relating to the permitting of renewable energy generation facilities; authorizing fees.

Introduced

Underlined text would be added to current law. Struck-through text would be removed.

  90R1028 SCR-F
 
  By: Hall S.B. No. 435
 
 
  A BILL TO BE ENTITLED
  AN ACT
  relating to the permitting of renewable energy generation
  facilities; authorizing fees.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter C, Chapter 15, Utilities Code, is
  amended by adding Section 15.053 to read as follows:
         Sec. 15.053.  COMPLAINT REGARDING RENEWABLE ENERGY
  GENERATION FACILITIES. (a) An affected person may complain to the
  commission in writing setting forth an act or omission by an owner
  or operator of a renewable energy generation facility in violation
  or claimed violation of Subchapter F, Chapter 35.
         (b)  The commission shall keep for a reasonable period an
  information file about each complaint filed with the commission
  relating to an owner or operator of a renewable energy generation
  facility.
         (c)  The commission, at least quarterly and until final
  disposition of the written complaint, shall notify the parties to
  the complaint of the status of the complaint unless the notice would
  jeopardize an undercover investigation.
         SECTION 2.  Chapter 35, Utilities Code, is amended by adding
  Subchapter F to read as follows:
  SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT
         Sec. 35.201.  DEFINITIONS; APPLICABILITY. (a) In this
  subchapter:
               (1)  "Permit holder" means a person who holds a permit
  issued under this subchapter.
               (2)  "Person" includes an electric cooperative and a
  municipally owned utility.
               (3)  "Renewable energy generation facility" means:
                     (A)  a wind power facility as defined by Section
  301.0001;
                     (B)  a solar power facility as defined by Section
  302.0001;
                     (C)  a battery energy storage facility as defined
  by Section 303.0001 or another type of electric energy storage
  facility; or
                     (D)  a renewable power facility.
               (4)  "Renewable power facility" means a facility that:
                     (A)  generates electric energy using a renewable
  energy technology, as defined by Section 39.916, other than a
  technology that relies exclusively on wind or solar energy; and
                     (B)  is not an electric energy storage facility.
         (b)  The permit requirements of this subchapter apply to a
  renewable energy generation facility regardless of whether the
  facility is the subject of a facility agreement entered into under
  Chapter 301, 302, or 303.
         (c)  This subchapter applies only to a renewable energy
  generation facility that is intended to be used to sell energy or
  ancillary services at wholesale.
         Sec. 35.202.  PERMIT REQUIRED. (a)  A person may not
  interconnect a renewable energy generation facility to a
  transmission facility unless the person holds a permit to operate a
  renewable energy generation facility issued by the commission under
  this subchapter.
         (b)  The commission by rule shall require each permitted
  renewable energy generation facility to be installed only in a
  location that:
               (1)  for a solar power facility, is at least:
                     (A)  500 feet from any property line, unless the
  permit holder has obtained a written waiver from each owner of
  property located less than 500 feet from the permitted facility;
  and
                     (B)  500 feet from any habitable structure, unless
  the permit holder has obtained a written waiver from each owner of
  the habitable structure;
               (2)  for a wind power facility, is at least twice the
  height of the wind turbine, including the blades of the turbine,
  from the property line of each property that borders the property on
  which the permitted facility is located, unless the permit holder
  has obtained a written waiver from each owner of property located in
  the applicable area; and
               (3)  for a battery energy storage facility, is at
  least:
                     (A)  500 feet from any property line, unless the
  permit holder has obtained a written waiver from each owner of
  property located less than 500 feet from the permitted facility;
  and
                     (B)  500 feet from:
                           (i)  public ways;
                           (ii)  buildings;
                           (iii)  stored combustible materials;
                           (iv)  hazardous materials;
                           (v)  high-piled stock; and
                           (vi)  other exposure hazards not associated
  with electrical grid infrastructure.
         (c)  The commission by rule shall require:
               (1)  each permitted renewable energy generation
  facility to be installed only in a location that, in the event of an
  emergency at the site of the permitted renewable energy generation
  facility, will not block the only access point to a residential
  area; or
               (2)  an alternate access point to be constructed for
  any residential area in which an emergency at the site of the
  permitted facility could block the only access point to the
  residential area.
         (d)  A person may apply for a permit under this subchapter by
  filing with the commission:
               (1)  a description of the proposed location of the
  renewable energy generation facility;
               (2)  a description of the type of renewable energy
  generation facility;
               (3)  a statement identifying the fire department, as
  defined by Section 419.021, Government Code, volunteer fire
  department, fire marshal, or other first responder entity that may
  reasonably be expected to be the primary first responder to a fire
  at the location of the renewable energy generation facility;
               (4)  a statement that the person has provided written
  notice to the entity identified in Subdivision (3) of the
  applicant's intent to install a renewable energy generation
  facility;
               (5)  evidence of insurance coverage sufficient to
  insure against losses arising from the operation of the renewable
  energy generation facility; and
               (6)  any other information required by commission rule.
         (e)  When an application for a permit, or an amendment to a
  permit issued under this section, is filed, the commission shall
  give notice of the application to the county judge of the county in
  which all or a majority of the renewable energy generation facility
  is proposed to be located.  The county shall publish the notice in
  at least three consecutive issues of a newspaper with general
  circulation in the county. The county shall also publish the notice
  on the county's Internet website.  The county may not remove the
  notice from its Internet website after publication.
         (f)  The commission may hold one or more public meetings on a
  permit application in the county in which the renewable energy
  generation facility is proposed to be located. The commission
  shall hold a public meeting:
               (1)  on the request of a member of the legislature who
  represents the area in which the renewable energy generation
  facility is proposed to be located; or
               (2)  if the commission determines there is substantial
  public interest in the proposed permit.
         (g)  The commission by order or rule may delegate to the
  executive director or another commission employee the authority to
  hold a public meeting under this section. 
         (h)  The commission may approve an application for a permit
  only if the commission finds that:
               (1)  issuance of the permit would not violate state or
  federal law; and
               (2)  the location of the proposed renewable energy
  generation facility complies with rules adopted under Subsections
  (b) and (c).
         (i)  The commission by rule shall adopt a fee to be imposed on
  each permit applicant to cover costs associated with implementing
  this section.
         (j)  For purposes of this subchapter:
               (1)  a provision of Subchapter B or E, Chapter 14, that
  authorizes the commission to regulate a public utility also applies
  to a person required to obtain a permit under this section,
  including an electric cooperative or a municipally owned utility;
  and
               (2)  a reference in Chapter 15 to a person includes a
  person required to obtain a permit under this section, including an
  electric cooperative or a municipally owned utility.
         SECTION 3.  As soon as practicable after the effective date
  of this Act, the Public Utility Commission of Texas shall adopt
  rules to effectuate the changes in law made by this Act.
         SECTION 4.  This Act takes effect immediately if it receives
  a vote of two-thirds of all the members elected to each house, as
  provided by Section 39, Article III, Texas Constitution.  If this
  Act does not receive the vote necessary for immediate effect, this
  Act takes effect September 1, 2027.