Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

SB 548Sesión 2026

Qué cambió entre versiones

773 párrafos cambiaron+2110 palabras agregadas−1412 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

Florida Senate

-

2026

CS for SB 548

By

Senator McClain

the Committee on Community Affairs; and Senator McClain

9-00714-26 2026548__578-02033-26 2026548c1

1 A bill to be entitled

2 An act relating to growth management; amending s.

3 163.3164, F.S.; defining the term “plan-based

4 methodology”; amending s. 163.31803177, F.S.; deleting anproviding

5 requirements for coordination mechanisms that are

6 required for certain agreements required as part of

7 the intergovernmental coordination element of a

8 comprehensive plan; amending s. 163.3180, F.S.;

9 requiring that certain interlocal agreements use a

10 plan-based methodology for a certain purpose;

11 prohibiting certain interlocal agreements from

512 exceptionextending tobeyond a specified date; deleting an applicability provision relating to

13 exception to an applicability provision relating to

614 concurrency; amending s. 163.31801, F.S.; defining the

715 term “extraordinary circumstances”; requiring that a

816 demonstrated-need study use a plan-based methodology for

917 for a certain purpose; requiring that certain conditionscapacity

18 standards be specified in a certain impact fee study;

1019 requiring that a demonstrated-need study be shown to exist in order to demonstrate

11 extraordinary circumstances; revising the voting

20 accompanied by a certain declaration; requiring local

21 governments, school districts, and special districts

1222 thresholdto requireduse localized data for approvala ofcertain an ordinancepurpose;

23 prohibiting local governments, school districts, and

24 special districts from using certain data for a

25 specified purpose; prohibiting local governments,

26 school districts, and special districts from including

27 certain deductions in certain impact fee increases and

1328 from increasing an impact fee rates beyond certain phase-inphase

29 in limitations by more than a specified percentage

30 within a certain timeframe; providing that a

31 prevailing petitioner is entitled to an impact fee

32 overpayment refund, with interest, under certain

1433 limitationscircumstances; prohibitingrequiring local governments, from usingschool

34 districts, and special districts to issue such refunds

1535 certain data forwithin a specified purposetimeframe; prohibitingproviding that certain

16 local governments from including certain deductions in

17 certain impact fee increases; prohibiting local

36 prevailing petitioners are entitled to reasonable

1837 governmentsattorney fees and schoolcosts; districtsamending froms. increasing212.055, F.S.;

19 impact fee rates beyond certain phase-in limitations

20 by more than a specified percentage within a certain

2138 timeframeconforming a cross-reference; providing thatan certain prevailing partieseffective

22 in actions challenging certain impact fees are

23 entitled to reasonable attorney fees and costs;

24 amending s. 212.055, F.S.; conforming a cross

25 reference; providing an effective date.

39 date.

40

41 Be It Enacted by the Legislature of the State of Florida:

2642

27 Be It Enacted by the Legislature of the State of Florida:

28

2943 Section 1. Present subsections (39) through (54) of section

3044 163.3164, Florida Statutes, are redesignated as subsections (40)

3145 through (55), respectively, and a new subsection (39) is added

3246 to that section, to read:

3347 163.3164 Community Planning Act; definitions.—As used in

3448 this act:

35

49

(39) “Plan-based methodology

3 párrafos sin cambios

”

means a

study

methodology

36

50

that uses

the most recent and localized data to project growth

37

51

within a jurisdiction over a

5

10

-year period,

anticipate

capacity

38

52

impacts on

5 párrafos sin cambios

relevant

system

s

which will be

created by th

e

3953

projected growth, and

establish

a list of capital projects to be

4054

constructed

or purchased

constructed in a defined time period to mitigate th

55

th

e anticipated

41

capacity impact

s

as part of a new or updated impact fee study.

42

The

56

impact fee study. The

capital projects

identified in the study

57

and any necessary interlocal agreement

must

comport with the

43

58

the requirements of

s.

163.3177(6)(h)

.

4459 Section 2. Paragraph (jh) of subsection (56) of section

4560 163.31803177, Florida Statutes, is amended to read:

4661 163.31803177 Concurrency.—Required and optional elements of comprehensive

47 (5)

48 (j)1. If a county and municipality charge the developer of

49 a new development or redevelopment a fee for transportation

50 capacity impacts, the county and municipality must create and

62 plan; studies and surveys.—

63 (6) In addition to the requirements of subsections (1)-(5),

64 the comprehensive plan shall include the following elements:

51 execute65 (h)1. An anintergovernmental interlocalcoordination agreementelement to coordinate the mitigation ofshowing

52 their respective transportation capacity impacts.

53 2. The interlocal agreement must, at a minimum:

54 a. Ensure that any new development or redevelopment is not

55 charged twice for the same transportation capacity impacts.

56 b. Establish a plan-based methodology for determining the

57 legally permissible fee to be charged to a new development or

58 redevelopment.

66 relationships and stating principles and guidelines to be used

67 in coordinating the adopted comprehensive plan with the plans of

68 school boards, regional water supply authorities, and other

69 units of local government providing services but not having

70 regulatory authority over the use of land, with the

59 c. Require71 comprehensive plans of adjacent municipalities, the county or municipality issuing the building,

60 permit to collect the fee, unless agreed to otherwise.

61 d. Provide a method for the proportionate distribution of

62 the revenue collected by the county or municipality to address

72 adjacent counties, or the region, with the state comprehensive

73 plan and with the applicable regional water supply plan approved

74 pursuant to s. 373.709, as the case may require and as such

6375 theadopted transportationplans capacityor impactsplans in preparation may exist. This element of a new development or

64 redevelopment, or provide a method of assigning responsibility

76 the local comprehensive plan must demonstrate consideration of

77 the particular effects of the local plan, when adopted, upon the

78 development of adjacent municipalities, the county, adjacent

6579 forcounties, or the mitigationregion, ofor upon the transportationstate capacitycomprehensive impactsplan,

80 as the case may require.

81 a. The intergovernmental coordination element must provide

82 procedures for identifying and implementing joint planning

6683 belongingareas, toespecially for the countypurpose andof theannexation, municipality.municipal

84 incorporation, and joint infrastructure service areas.

85 b. The intergovernmental coordination element shall provide

86 for a dispute resolution process, as established pursuant to s.

87 186.509, for bringing intergovernmental disputes to closure in a

88 timely manner.

89 c. The intergovernmental coordination element shall provide

67 3. By October 1, 2025, if an90 for interlocal agreementagreements isas notestablished pursuant to s.

68 executed pursuant to this paragraph:

69 a. The fee charged to a new development or redevelopment

70 shall be based on the transportation capacity impacts

71 apportioned to the county and municipality as identified in the

72 developer’s traffic impact study or the mobility plan adopted by

73 the county or municipality.

74 b. The developer shall receive a 10 percent reduction in

75 the total fee calculated pursuant to sub-subparagraph a.

76 c. The county or municipality issuing the building permit

77 must collect the fee charged pursuant to sub-subparagraphs a.

91 333.03(1)(b).

92 2. The intergovernmental coordination element shall also

93 state principles and guidelines to be used in coordinating the

7894 andadopted b.comprehensive andplan distributewith the proceedsplans of suchschool fee to the countyboards and

79 municipality within 60 days after the developer’s payment.

80 4. This paragraph does not apply to:

81 a. A county as defined in s. 125.011(1).

82 b. A county or municipality that has entered into, or

83 otherwise updated, an existing interlocal agreement, as of

84 October 1, 2024, to coordinate the mitigation of transportation

85 impacts. However, if such existing interlocal agreement is

86 terminated, the affected county and municipality that have

87 entered into the agreement

95 other units of local government providing facilities and

96 services but not having regulatory authority over the use of

97 land. In addition, the intergovernmental coordination element

98 must describe joint processes for collaborative planning and

99 decisionmaking on population projections and public school

100 siting, the location and extension of public facilities subject

101 to concurrency, and siting facilities with countywide

102 significance, including locally unwanted land uses whose nature

103 and identity are established in an agreement.

104 3. Within 1 year after adopting their intergovernmental

105 coordination elements, each county, all the municipalities

106 within that county, the district school board, and any unit of

107 local government service providers in that county shall

108 establish by interlocal or other formal agreement executed by

109 all affected entities, the joint processes described in this

110 subparagraph consistent with their adopted intergovernmental

111 coordination elements. The agreement must:

112 a. Ensure that the local government addresses through

113 coordination mechanisms the impacts of development proposed in

114 the local comprehensive plan upon development in adjacent

115 municipalities, the county, adjacent counties, the region, and

116 the state. The area of concern for municipalities shall include

117 adjacent municipalities, the county, and counties adjacent to

118 the municipality. The area of concern for counties shall include

119 all municipalities within the county, adjacent counties, and

120 adjacent municipalities.

Such coordination mechanisms must

121

include plans to provide mitigation funding to address any

122

extrajurisdictional impacts of development, consistent with the

123

requirements of s. 163.3180(5)(j).

124 b. Ensure coordination in establishing level of service

125 standards for public facilities with any state, regional, or

126 local entity having operational and maintenance responsibility

127 for such facilities.

128 Section 3. Paragraph (j) of subsection (5) of section

129 163.3180, Florida Statutes, is amended to read:

130 163.3180 Concurrency.—

131 (5)

132 (j)1. If a county and municipality charge the developer of

133 a new development or redevelopment a fee for transportation

134 capacity impacts, the county and municipality must create and

135 execute an interlocal agreement to coordinate the mitigation of

136 their respective transportation capacity impacts.

137 2. The interlocal agreement must, at a minimum:

138 a. Ensure that any new development or redevelopment is not

139 charged twice for the same transportation capacity impacts.

140 b. Establish a plan-based methodology for determining the

141 legally permissible fee to be charged to a new development or

142 redevelopment.

143 c. Require the county or municipality issuing the building

144 permit to collect the fee, unless agreed to otherwise.

145 d. Provide a method for the proportionate distribution of

146 the revenue collected by the county or municipality to address

147 the transportation capacity impacts of a new development or

148 redevelopment, or provide a method of assigning responsibility

149 for the mitigation of the transportation capacity impacts

150 belonging to the county and the municipality.

151

e. Use a plan-based methodology in complying with the

152

requirements of s. 163.3177(6)(h).

153 3. By October 1, 2025, if an interlocal agreement is not

154 executed pursuant to this paragraph:

155 a. The fee charged to a new development or redevelopment

156 shall be based on the transportation capacity impacts

157 apportioned to the county and municipality as identified in the

158 developer’s traffic impact study or the mobility plan adopted by

159 the county or municipality.

160 b. The developer shall receive a 10 percent reduction in

161 the total fee calculated pursuant to sub-subparagraph a.

162 c. The county or municipality issuing the building permit

163 must collect the fee charged pursuant to sub-subparagraphs a.

164 and b. and distribute the proceeds of such fee to the county and

165 municipality within 60 days after the developer’s payment.

166 4. This paragraph does not apply to:

167 a. A county as defined in s. 125.011(1).

168 b. A county or municipality that has entered into, or

169 otherwise updated, an existing interlocal agreement, as of

170 October 1, 2024, to coordinate the mitigation of transportation

171 impacts. However, if such existing interlocal agreement is

172 terminated, the affected county and municipality that have

173 entered into the agreement

are

shall be

subject to the

88174 requirements of this paragraph

unless the county and

89

municipality mutually agree to extend the existing interlocal

90

agreement before the expiration of the agreement

.

91 Section 3. Present paragraphs (a) and (b) of subsection (3)

92 of section 163.31801, Florida Statutes, are redesignated as

93 paragraphs (b) and (c), respectively, a new paragraph (a) is

94 added to that subsection, and paragraph (g) of subsection (6)

95 and subsection (9) of that section are amended, to read:

96 163.31801 Impact fees; short title; intent; minimum

97 requirements; audits; challenges.—

98 (3) For purposes of this section, the term:

99

An interlocal agreement entered

175

into before October 1, 2024, may not extend beyond October 1,

176

2031

unless the county and municipality mutually agree to extend

177

the existing interlocal agreement before the expiration of the

178

agreement

.

179 Section 4. Present paragraphs (a) and (b) of subsection (3)

180 of section 163.31801, Florida Statutes, are redesignated as

181 paragraphs (b) and (c), respectively, a new paragraph (a) is

182 added to that subsection, and paragraph (g) of subsection (6)

183 and subsection (9) of that section are amended, to read:

184 163.31801 Impact fees; short title; intent; minimum

185 requirements; audits; challenges.—

186 (3) For purposes of this section, the term:

187

(a)

“Extraordinary circumstances” means m

easurable effects

100

188

of development

which

will require mitigation by the affected

101

189

local government

, school district, or special district

and which

190

exceed the total of the current adopted impact fee amount

102

adopted impact fee amount

and

191

any increase as provided in paragraphs (6)(c), (d),

103

paragraphs (6)(c), (d),

and

(e) in

192

(e) in less than

4

years.

104193 (6) A local government, school district, or special

105194 district may increase an impact fee only as provided in this

106195 subsection.

107196 (g)1. A local government, school district, or special

108197 district may increase an impact fee rate beyond the phase-in

109198 limitations established under paragraph (b), paragraph (c),

110199 paragraph (d), or paragraph (e) by establishing the need for

111200 such increase in full compliance with the requirements of

112201 subsection (4), provided the following criteria are met:

113202 a. A demonstrated-need study

using a plan-based methodology

114

203

which justifies

justifying

any increase in excess of those

115204 authorized in paragraph (b), paragraph (c), paragraph (d), or

116205 paragraph (e) has been completed within the 12 months before the

117206 adoption of the impact fee increase and expressly demonstrates

118207 the extraordinary circumstances necessitating the need to exceed

119208 the phase-in limitations.

The capacity standards used to support

209

the existence of such extraordinary circumstances must be

210

specified in the impact fee study adopted under paragraph

211

(4)(a). The

Todemonstrated-need demonstrate such extraordinarystudy

must be accompanied by a

120212

circumstances, at least four of the following conditions must be

declaration stating how and the timeframe during which the

121213

shown to exist, using

localized data

that reflects

differences

122

in area costs and modalit

proposed impact fee

iesincrease

of projects between

any

urban,

123

emerging urban

will be used to construct or

214

purchase the

improvements necessary to increase capacity

.

The

215

local government, school district, or special district

must

use

216

localized data reflecting differences in costs and modality of

217

projects between urban, emerging urban

,

or

and rural area

s

,

as

218

applicable

within the study area

,

to project the

anticipated

219

growth or capacity

impacts

which underlie the extraordinary

220

circumstances necessitating the impact fee increase

.

221 b. The local government jurisdiction has held at least two

222 publicly noticed workshops dedicated to the extraordinary

223 circumstances necessitating the need to exceed the phase-in

224 limitations set forth in paragraph (b), paragraph (c), paragraph

225 (d), or paragraph (e).

226 c. The impact fee increase ordinance is approved by a

227 unanimous vote of the governing body.

228 2. An impact fee increase approved under this paragraph

229 must be implemented in at least two but not more than four equal

230 annual increments beginning with the date on which the impact

231 fee increase ordinance is adopted.

232 3. A local government

, school district, or special district

233 may not

:

124234

(I)

Population growth

with

in the

local government

’s

, school

125

district

’s

, or special district

’s

jurisdiction

in

the

previous

126

5

-

year

period

exceeds the high

population

projections

provided

127

by the

University of Florida’s Bureau of Economic and Business

128

Research

.

129

(II)

The average

number of

building permits issued by the

130

local government

in

the

previous 3-year period

is

less than 10

131

percent of the average number of building permits issued in the

132

previous 10-year period.

133

(III) There is a documented failure to meet transportation

134

level

-

of

-

service

standards or

quality

-

of

-

service

standards

135

within the jurisdiction

which were necessary

to meet

demand in

136

the previous

5

-year

period.

137

(IV)

The local capital construction cost exceeds the

138

previous 5-year average construction cost specified in the

139

National Highway Construction Cost

I

ndex

provided by the United

140

States Department of Transportation’s Federal Highway

141

Administration.

142

(V)

The employment base within the jurisdiction has

143

exceeded the average

labor market employment gains

reported

by

144

the

Department of Commerce

in

the pre

vious

5

-year period

.

145

(VI)

The

average daily

vehicle miles traveled

in the

146

jurisdiction

in the past

5

years has exceeded the Florida

147

Vehicle Miles Traveled index average

.

148

(VII)

The

cost per mile

estimates for construction

projects

149

are at least 10 percent greater than the average cost per mile

150

provided by the Department of Transportation as a model for

151

similar construction projects in the previous 5-year period.

152 b. The local government jurisdiction has held at least two

153 publicly noticed workshops dedicated to the extraordinary

154 circumstances necessitating the need to exceed the phase-in

155 limitations set forth in paragraph (b), paragraph (c), paragraph

156 (d), or paragraph (e).

157 c. The impact fee increase ordinance is approved by a

two

158

thirds

unanimous

vote of the governing body.

159 2. An impact fee increase approved under this paragraph

160 must be implemented in at least two but not more than four equal

161 annual increments beginning with the date on which the impact

162 fee increase ordinance is adopted.

163 3. A local government may not

:

164

a.

Increase an impact fee rate beyond the phase-in

165235 limitations under this paragraph if the local government has not

, school

236

district, or special district

has not increased the impact fee

166237 increased the impact fee within the past 5 years. Any year in which the local government

167 which the local government is prohibited from increasing an

,

238

school district, or special district

is prohibited from

168239 increasing an impact fee because the jurisdiction is in a hurricane disaster

169240 hurricane disaster area is not included in the 5-year period.

170

241

b.

3 párrafos sin cambios

Use data

that is

older than 4 years to

demonstrate

171

242

extraordinary circumstances except as specifically provided in.

172

sub-subparagraph 1.a.

173

243

c. Include in the impact fee increase any deduction

174

244

authorized by a previous or existing impact fee.

175

245

4d. AI

local government or school district

may not i

ncrease

176

ncrease an impact fee rate beyond the phase-in limitations under this

177

246

limitations under this paragraph by more than 100 percent in a 4-year period.

247

divided equally over

a 4-year period.

178248 (9) In any action challenging an impact fee or the

249 government’s failure to provide required dollar-for-dollar

250 credits for the payment of impact fees as provided in s.

251 163.3180(6)(h)2.b.

:

179

,

252

(a)

AnThe impactgovernment fee orhas the government’sburden failureof toproving provideby a

180 required dollar-for-dollar credits for the payment of impact

181 fees as provided in s. 163.3180(6)(h)2.b., the government has

182253 the burden of proving by a preponderance of the evidence that the imposition or amount of

183254 the imposition or amount of the fee or credit meets the requirements of state legal

184255 requirements of state legal precedent and this section. The court may not use a deferential

185256 court may not use a deferential standard for the benefit of the government.

186 government.

187

If the court

257

determines that the petitioner made an overpayment due to an

258

improperly assessed impact fee, the petitioner is entitled to a

259

refund in the amount of the overpayment with interest, with such

260

interest amount determined by the court.

The local government,

261

school district, or special district

that assessed the impact

262

fee

must issue the refund within 90 days after the judgment

263

becomes final.

264

(b)

A prevailing petitioner who is a resident of or an

265

owner of a business located within the jurisdiction of the local

266

Agovernment, localschool governmentdistrict, or special district impact fee

188

that imposed

267

imposedthe impact fee in violation of this section, a prevailing petitioner

189

who is a resident of or an owner of a business located within

190

the jurisdiction of the local government or special district, as

191

is entitled to

268

reasonable attorney fees and costs

. Such petitioner is further

269

applicable, is entitled to reasonable attorney fees and costs. in any subsequent

270

action necessary to collect a refund ordered by the court for

271

any impact fee overpayment.

192272 Section 45. Paragraph (d) of subsection (2) of section

193273 212.055, Florida Statutes, is amended to read:

194274 212.055 Discretionary sales surtaxes; legislative intent;

195275 authorization and use of proceeds.—It is the legislative intent

196276 that any authorization for imposition of a discretionary sales

197277 surtax shall be published in the Florida Statutes as a

198278 subsection of this section, irrespective of the duration of the

199279 levy. Each enactment shall specify the types of counties

200280 authorized to levy; the rate or rates which may be imposed; the

201281 maximum length of time the surtax may be imposed, if any; the

202282 procedure which must be followed to secure voter approval, if

203283 required; the purpose for which the proceeds may be expended;

204284 and such other requirements as the Legislature may provide.

205285 Taxable transactions and administrative procedures shall be as

206286 provided in s. 212.054.

207287 (2) LOCAL GOVERNMENT INFRASTRUCTURE SURTAX.—

208288 (d) The proceeds of the surtax authorized by this

209289 subsection and any accrued interest shall be expended by the

210290 school district, within the county and municipalities within the

211291 county, or, in the case of a negotiated joint county agreement,

212292 within another county, to finance, plan, and construct

213293 infrastructure; to acquire any interest in land for public

214294 recreation, conservation, or protection of natural resources or

215295 to prevent or satisfy private property rights claims resulting

216296 from limitations imposed by the designation of an area of

217297 critical state concern; to provide loans, grants, or rebates to

218298 residential or commercial property owners who make energy

219299 efficiency improvements to their residential or commercial

220300 property, if a local government ordinance authorizing such use

221301 is approved by referendum; or to finance the closure of county

222302 owned or municipally owned solid waste landfills that have been

223303 closed or are required to be closed by order of the Department

224304 of Environmental Protection. Any use of the proceeds or interest

225305 for purposes of landfill closure before July 1, 1993, is

226306 ratified. The proceeds and any interest may not be used for the

227307 operational expenses of infrastructure, except that a county

228308 that has a population of fewer than 75,000 and that is required

229309 to close a landfill may use the proceeds or interest for long

230310 term maintenance costs associated with landfill closure.

231311 Counties, as defined in s. 125.011, and charter counties may, in

232312 addition, use the proceeds or interest to retire or service

233313 indebtedness incurred for bonds issued before July 1, 1987, for

234314 infrastructure purposes, and for bonds subsequently issued to

235315 refund such bonds. Any use of the proceeds or interest for

236316 purposes of retiring or servicing indebtedness incurred for

237317 refunding bonds before July 1, 1999, is ratified.

238318 1. For the purposes of this paragraph, the term

239319 “infrastructure” means:

240320 a. Any fixed capital expenditure or fixed capital outlay

241321 associated with the construction, reconstruction, or improvement

242322 of public facilities that have a life expectancy of 5 or more

243323 years, any related land acquisition, land improvement, design,

244324 and engineering costs, and all other professional and related

245325 costs required to bring the public facilities into service. For

246326 purposes of this sub-subparagraph, the term “public facilities”

247327 means facilities as defined in

s. 163.3164(42)

s. 163.3164(41)

,

248328 s. 163.3221(13), or s. 189.012(5), and includes facilities that

249329 are necessary to carry out governmental purposes, including, but

250330 not limited to, fire stations, general governmental office

251331 buildings, and animal shelters, regardless of whether the

252332 facilities are owned by the local taxing authority or another

253333 governmental entity.

254334 b. A fire department vehicle, an emergency medical service

255335 vehicle, a sheriff’s office vehicle, a police department

256336 vehicle, or any other vehicle, and the equipment necessary to

257337 outfit the vehicle for its official use or equipment that has a

258338 life expectancy of at least 5 years.

259339 c. Any expenditure for the construction, lease, or

260340 maintenance of, or provision of utilities or security for,

261341 facilities, as defined in s. 29.008.

262342 d. Any fixed capital expenditure or fixed capital outlay

263343 associated with the improvement of private facilities that have

264344 a life expectancy of 5 or more years and that the owner agrees

265345 to make available for use on a temporary basis as needed by a

266346 local government as a public emergency shelter or a staging area

267347 for emergency response equipment during an emergency officially

268348 declared by the state or by the local government under s.

269349 252.38. Such improvements are limited to those necessary to

270350 comply with current standards for public emergency evacuation

271351 shelters. The owner must enter into a written contract with the

272352 local government providing the improvement funding to make the

273353 private facility available to the public for purposes of

274354 emergency shelter at no cost to the local government for a

275355 minimum of 10 years after completion of the improvement, with

276356 the provision that the obligation will transfer to any

277357 subsequent owner until the end of the minimum period.

278358 e. Any land acquisition expenditure for a residential

279359 housing project in which at least 30 percent of the units are

280360 affordable to individuals or families whose total annual

281361 household income does not exceed 120 percent of the area median

282362 income adjusted for household size, if the land is owned by a

283363 local government or by a special district that enters into a

284364 written agreement with the local government to provide such

285365 housing. The local government or special district may enter into

286366 a ground lease with a public or private person or entity for

287367 nominal or other consideration for the construction of the

288368 residential housing project on land acquired pursuant to this

289369 sub-subparagraph.

290370 f. Instructional technology used solely in a school

291371 district’s classrooms. As used in this sub-subparagraph, the

292372 term “instructional technology” means an interactive device that

293373 assists a teacher in instructing a class or a group of students

294374 and includes the necessary hardware and software to operate the

295375 interactive device. The term also includes support systems in

296376 which an interactive device may mount and is not required to be

297377 affixed to the facilities.

298378 2. For the purposes of this paragraph, the term “energy

299379 efficiency improvement” means any energy conservation and

300380 efficiency improvement that reduces consumption through

301381 conservation or a more efficient use of electricity, natural

302382 gas, propane, or other forms of energy on the property,

303383 including, but not limited to, air sealing; installation of

304384 insulation; installation of energy-efficient heating, cooling,

305385 or ventilation systems; installation of solar panels; building

306386 modifications to increase the use of daylight or shade;

307387 replacement of windows; installation of energy controls or

308388 energy recovery systems; installation of electric vehicle

309389 charging equipment; installation of systems for natural gas fuel

310390 as defined in s. 206.9951; and installation of efficient

311391 lighting equipment.

312392 3. Notwithstanding any other provision of this subsection,

313393 a local government infrastructure surtax imposed or extended

314394 after July 1, 1998, may allocate up to 15 percent of the surtax

315395 proceeds for deposit into a trust fund within the county’s

316396 accounts created for the purpose of funding economic development

317397 projects having a general public purpose of improving local

318398 economies, including the funding of operational costs and

319399 incentives related to economic development. The ballot statement

320400 must indicate the intention to make an allocation under the

321401 authority of this subparagraph.

322402 4. Surtax revenues that are shared with eligible charter

323403 schools pursuant to paragraph (c) shall be allocated among such

324404 schools based on each school’s proportionate share of total

325405 school district capital outlay full-time equivalent enrollment

326406 as adopted by the education estimating conference established in

327407 s. 216.136. Surtax revenues must be expended by the charter

328408 school in a manner consistent with the allowable uses provided

329409 in s. 1013.62(4). All revenues and expenditures shall be

330410 accounted for in a charter school’s monthly or quarterly

331411 financial statement pursuant to s. 1002.33(9). If a school’s

332412 charter is not renewed or is terminated and the school is

333413 dissolved under the provisions of law under which the school was

334414 organized, any unencumbered funds received under this paragraph

335415 shall revert to the sponsor.

336416 Section 56. This act shall take effect July 1, 2026.

Volver al texto completo