University of Texas at Austin
Contracts
Active contracts · All contracts
6939 contracts, largest first.
-
NNR GLOBAL LOGISTICS USA INC$50,000
TIE Tool MTH52 Freight Forwarding - NNR Global Log
-
RANKIN GROUP$50,000
Rankin, Inc. - Campus-Wide RFP (721-24067)
-
RED WING SHOE CO INC$50,000
FY25/26 -Red Wing Shoes - Employee Safety Shoes
-
REGENTS OF THE UNIVERSITY OF CALIFORNIA$50,000
CS+Elementary @ UC San Diego (Preferred Curriculum
-
ROCKWELL PRECISION LLC$50,000
Rockwell / 454374A / Bids
-
RUDE MECHANICALS - A THEATRE COLLECTIVE$50,000
Students gain perspective on devising new plays
-
Sage Therapeutics Inc$50,000
Sage Therapeutics - Amendment 4 (DMS/Psych) Nemero
-
TECHNOVATION WORLDWIDE INC$50,000
Technovation (Preferred Curriculum Provider)
-
TEJAS ELEVATOR CO$50,000
Repair the machine brakes on elevators 2 and 3 at
-
TEXAS PHYSICAL THERAPY SPECIALISTS INC$50,000
physical therapy for outpatient clinic
-
Trejo, Sam Benjamin$50,000
PWI Summer Consultant- Trejo, Sam Benjamin
-
Hatch Mott MacDonald$49,700
16SSP008-Survey Repair Design Marina Docks
-
WISS JANNEY ELSTNER ASSOICIATES INC$49,673
Administration Building Roof Replacement
-
Haddon & Cowan Architects$49,645
ADA Renov Transition Plan-8th & 9th Men's Restrms
-
Engineered Exteriors, PLLC$49,260
Tower Clocks Sealant has Failed Needs Repair
-
BECK ARCHITECTURE$48,900
Renovate LPC Masterplan
-
Larson, Burns & Smith, Inc.$48,750
Perimeter Security Fencing
-
O'CONNELL ROBERTSON, INC.$48,750
LCCF Campus Vendor Services
-
WKMC ARCHITECTS INC$48,485
S59 Plant Garage Replacement
-
BSA LIFESTRUCTURES INC$48,396
HDB: LEVEL 8 MARKETING OFFICES
-
BSA LIFESTRUCTURES, INC.$48,000
Renovate ADA Restroom Add Break Room Sink
-
JQ Engineering, LLP$47,464
Building Envelope Renovation - MSI
-
Lonestar Environmental Services$47,375
North Wing Renovation
-
Acacia Specialty Builders$47,236
Sole Source Construction Contract
-
WISS JANNEY ELSTNER ASSOICIATES INC$46,756
FAML CCOS Roof Replacement
-
PROTECTION DEVELOPMENT INC$46,557
5 yr contract for engineering services
-
JACOBS ENGINEERING GROUP INC$46,116
UT Design and Construction Standards Update
-
HADDON+COWAN ARCHITECTS LLC$46,050
Convert Two Rooms to 3.128 & 3.129
-
EDWARDS+MULHAUSEN INTERIOR DESIGN LLC$45,202
Expand The Collaborative Commons on 5th Floor
-
FD2S INC$45,075
Programming & Fabrication
-
PAMELA M PIAR$45,000
IT Consulting Services for HTB Clinical Enterprise
-
JOHNSON CONTROLS SECURITY SOLUTIONS LLC$44,836
Fire/Life Safety System Modifications
-
PAGE SOUTHERLAND PAGE INC$44,827
Beam Repair
-
Beck Architecture, LLC$44,250
Masterplan for Kinsolving Dining
-
BSA LIFESTRUCTURES, INC.$44,216
Lab Renov for New Faculty Member-Yi Lu 4.402
-
EDWARDS+MULHAUSEN INTERIOR DESIGN LLC$44,007
Renovate Fine Arts Library 5th Floor
-
Fire Protection Engineering$42,880
Sprinkler High Bay and Remainder of the Building
-
RPS INFRASTRUCTURE INC$42,073
Non-Ongoing PSP-Sole Source
-
FREESE AND NICHOLS INC$42,071
OAHU-16 Replacement
-
MCKINNEY YORK ARCHITECTS$41,145
CAM Governor Hogg Statue Move
-
MEP ENGINEERING INC BLDG 1 STE 150$40,661
MSI S13 Chiller Upgrades
-
CUSHMAN & WAKEFIELD U.S., INC.$40,650
UT Real Estate ADA-TAS Support (Block 164)
-
TERRACON CONSULTANTS INC$40,600
Interior Renovation Phases 1 & 2
-
White Construction Company$40,500
Blanton Museum Building and Grounds Improvements
-
Lonestar Environmental Services$40,373
Replace Windows
-
DLR GROUP INC OF TEXAS$40,362
Extend DFF Backstop Net
-
Lord, Aeck & Sargent, Inc.$40,317
Dr. Belardi Renovation
-
Conservation of Sculpture and Objects Studio Inc$40,000
LIMESTONE LAZER WALL CLEAINING
-
Fire Protection Engineering$40,000
Retrofit Entire Fire Sprinkler System
-
MEADOWS MENTAL HEALTH POLICY INSTITUTE$40,000
Assess and evaluate 3 IPUs
Source: the Legislative Budget Board’s Contracts Database, as of November 22, 2026, as reported by each agency. Values are each contract’s total over its full term, which can span several years, not spending in a single year. Active means awarded and not yet past its completion date.