Texas A&M University-Kingsville
Contratos
Contratos activos · Todos los contratos
667 contratos, de mayor a menor.
-
SOUTHEAST SERVICE CORPORATION29,643 dólares
SEWER MAIN FOR BISHOP HALL
-
LNV INC29,500 dólares
Structural Eng. Svcs - Health & Rec. Foundation
-
SSC SERVICE SOLUTIONS29,480 dólares
Boiler Exhaust Gas Duct Replacement @ Central Plnt
-
EVCO PARTNERS LP29,420 dólares
METERING EQUIPMENT
-
SOUTHEAST SERVICE CORPORATION29,186 dólares
SWIMMING POOL PIPING
-
RYCON E&C, LLC29,105 dólares
Dotterweich Engineering Solar/Wind Panel Install
-
SOUTHEAST SERVICE CORPORATION29,102 dólares
PROJECT - SOUTH END SEWER LINE
-
SSC SERVICE SOLUTIONS28,994 dólares
Refrigeration Equipment Emergency Repl Howe Ag Lab
-
SOUTHEAST SERVICE CORPORATION28,962 dólares
CHILL WATER PUMP REPLACEMENT CP CHILLER 2.1
-
SSC SERVICE SOLUTIONS28,885 dólares
Mold Remediation & Build Back at College Hall
-
SSC SERVICE SOLUTIONS28,567 dólares
Roof Repairs around Exhaust/Dorms at Nierman Hall
-
SSC SERVICE SOLUTIONS28,435 dólares
Shower Pan Repairs Phase IV - Lucio Hall
-
CRUZ MAINTENANCE & CONSTRUCTION INC28,304 dólares
REPLACE CARPET ON 3RD FLOOR OF JERNIGAN LIBRARY
-
SOUTHEAST SERVICE CORPORATION28,248 dólares
EMERGENCY HOT WATER LINE REPLACEMENT GROSS IT
-
SSC SOUTHEAST SERVICE CORPORATION28,144 dólares
CHILL WATER PUMP REPLACEMENT CENTRAl PLANT 2
-
DATA PROJECTIONS, INC.27,945 dólares
Resource Innovation Teaching Learning Lab RH 245
-
MALTBY BUILDERS, INC.27,520 dólares
DISWASHER FLOOR INSTALLATION PROJECT
-
MALTBY BUILDERS INC27,432 dólares
WALL DEMO AND ROOM REFRESH AT POTEET HALL
-
SSC SERVICE SOLUTIONS27,411 dólares
Refinish Basketball Gym Floor at SPEC
-
SOUTHEAST SERVICE CORP27,321 dólares
FIRE ALARM PANEL AT BAILEY ART
-
MUSCO SPORTS LIGHTING LLC27,232 dólares
INSTALLATION OF LENSE COVERS FOR BASEBALL FIEL
-
SSC SERVICE SOLUTIONS27,180 dólares
Remove and Replace Bricks from Hill Hall
-
ALPHA ENGINEERING27,000 dólares
AE SERVICES FOR HEALTH & REC WINDOW REPLACEMENT
-
SOUTHEAST SERVICE CORPORATION26,858 dólares
NEW HYDRAULIC PUMP FOR COB ELEVATOR
-
RYCON E&C LLC26,702 dólares
PROJECT 130608 - HEF2014 INTER IOR GAS LINE EV
-
SSC SERVICE SOLUTIONS26,554 dólares
Repair Vandalized Window at Lucio Hall Room 166B
-
SOUTHEAST SERVICE CORPORATION26,285 dólares
PROJECT BLEACHER REPAIRS (BALCONY LEVEL ONLY)
-
RABA-KISTNER CONSULTANTS INC26,185 dólares
PROJECT 140603B - ATHL & INTRAMURAL FIELDS
-
RYCON E&C LLC26,080 dólares
NEW PARKING LOT-I EXPANSION LANDSCAPE
-
HALFF ASSOCIATES INC26,000 dólares
Prelim/Detail Design, Record & Construction
-
SOUTHEAST SERVICE CORPORATION25,935 dólares
PROJECT - MAINTENANCE CHILLER CENTRAL PLANT 2
-
SSC SERVICE SOLUTIONS25,805 dólares
Install New Chill Water Pump at Kleberg Ag
-
DATA PROJECTIONS INC25,507 dólares
Project #190318 2019 AV Refresh ENGC275
-
SOUTHEAST SERVICE CORPORATION25,355 dólares
REMOVE AND INSTALL NEW DOOR UNIT
-
SSC SERVICE SOLUTIONS25,354 dólares
Storm Tree Damage- Remove Dead Limbs
-
DATA PROJECTIONS, INC.25,225 dólares
Project 200616 AV Refresh-Little Theatre
-
JEAN'S RESTAURANT SUPPLY25,213 dólares
EQUIPMENT NEEDED FOR NEW RESTAURANT
-
NETWORK CABLING SERVICES INC25,054 dólares
Provide & Install Custom Time Zone Clock
-
PERKINELMER HEALTH SCIENCES INC25,013 dólares
LAB INSTRUMENT FOR WU & ZHONG
-
CENTRAL WASHINGTON UNIVERSITY25,000 dólares
GAME GUARANTEE FOR CWU (FOOTBALL)
-
HALFF ASSOCIATES INC25,000 dólares
Plumbing Design:Replace Natural Gas Lines & Vlvs
-
SOUTHEAST SERVICE CORPORATION25,000 dólares
EMERGENCY CHILL WATER LINE REPAIR MSUB
-
SOUTHEAST SERVICE CORP24,874 dólares
HOT WATER PIPING DIELECTRIC AT ENGINEERING
-
RYCON E&C, LLC24,800 dólares
Visitor Parking Lot M Modifications
-
RYCON E&C, LLC24,665 dólares
Replace Ceiling Tile at Jones Auditorium
-
KEYWARDEN SYSTEMS PARTNERS LLP24,645 dólares
CABINETS/CARD READER
-
SSC SERVICE SOLUTIONS24,587 dólares
Pool Louver Repairs at SPEC Pool - TD Industries
-
SOUTHEAST SERVICE CORPORATION24,480 dólares
MEN'S 2ND & 3RD FLOOR SHOWER & CEILING REPAIR
-
RYCON E&C, LLC24,450 dólares
Replace Lights at Horse Barns/Rodeo Arena
-
RYCON E&C LLC24,445 dólares
REFRESH ROOMS 108 AND 108A COLLEGE OF BUSINES
Fuente: la base de datos de contratos de la Junta de Presupuesto Legislativo (en inglés), al noviembre 15, 2026, según lo informado por cada agencia. Los valores son el total de cada contrato durante toda su vigencia, que puede abarcar varios años, no el gasto de un solo año. Activo significa adjudicado y aún sin pasar su fecha de terminación.