OFFERED FOR CONSIDERATION

1/27/2025

2025 SESSION

INTRODUCED

25104257D

SENATE BILL NO. 1046

AMENDMENT IN THE NATURE OF A SUBSTITUTE

(Proposed by the Senate Committee on Local Government

on ________________)

(Patron Prior to Substitute—Senator Roem)

Offered January 8, 2025

Prefiled January 7, 2025

A BILL to amend the Code of Virginia by adding in Article 1 of Chapter 22 of Title 15.2 a section numbered 15.2-2209.4, relating to data centers; noise abatement.

—————

Patron—Roem

—————

Referred to Committee on Local Government

—————

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding in Article 1 of Chapter 22 of Title 15.2 a section numbered 15.2-2209.4 as follows:

§ 15.2- 2209.4 . Data centers ; noise abatement .

A. Notwithstanding any other provision of law, general or special, any local government land use application required for the siting of a highdata electricalcenter, demandas campusdefined in § 58.1-3506, shall be approved only in accordance with the notice and noise abatement provisions of this section. For purposes of this section, "high electrical demand campus" means an operation or facility with a dedicated substation connected to a transmission line of at least 69 kilovolts that is reasonably anticipated by the operator or property owner to require more than 100 megawatts of electrical power from an electric utility providing retail service.

B. In addition to any notice required by § 15.2-2204, thet he data center operator or property owner or operator of the high electrical demand campus shall notify residents, if any, within a one - qu arter milehalf-mile radius of the parcel, including any property owners' association operating within the one - quarter milehalf-mile radius, that the property owner intends to build and operate a highdata electrical demand campuscenter on the property. The notice required in this section shall be mailed to all postal addresses and property owners' association addresses contained within a one - quarter milehalf-mile radius extending from the property line where the proposed highdata electrical demand campuscenter will be built.

The highdata electrical demand campuscenter operator or its legal representative shall holdschedule atand leastattend onetwo neighborhood meetingmeetings with residents to describe the project and the proposed sound-mitigation aspects of the project design in accordance with subsection C. Notice of the neighborhood meetings shall be mailed to all residents and property owners' associations within a one - quarter milehalf-mile radius of the parcel. A representative of the developer or owner with technicaldecision-making knowledgeauthority on the design of the data center shall attend the neighborhood meetings. The data center operator or property owner shall also post a sign on the subject property at least 15 days before each neighborhood meeting. The sign shall be located in a high-visibility location as reasonably determined by the zoning administrator. The content of the sign shall be consistent with the locality's generally applicable sign guidelines, if any, for posting signs for notification of neighborhood meetings and shall be reviewed and approved by the zoning administrator before installation.

C. Prior toBefore the first neighborhood meeting referencedis inheld pursuant to subsection B, the property owner proposing to build a highdata electrical demand campuscenter shall arrange forconduct a sound study. This study shall be conductedperformed by a third-party, certified acoustic engineer and sha llto document existing baseline sound levels in the area of the proposed highdata electricalcenter, demand campus. The measurements shall includeincluding noise levels takenmeasured at the property line of the nearest feasiblyproperty accessibleto the data center property that is planned or zoned for residential useland uses, or other noise - sensitive use as reasonably determined by localthe authoritieslocality. The selectedproperty measurement locationowner shall beprovide reasonablya accessiblecopy fromof the proposedresults highof electricalthe demandstudy campusto sitethe locality before the first neighborhood meeting.

D. The highdata electrical demand campuscenter shall be designed and built to incorporate sound mitigation methods sufficient to ensureprevent thatthe sound levels emanating from the highdata electricalcenter, demandas campusdetermined meetby a third-party acoustic engineer, from exceeding the requirementsambient ofnoise levels that were observed in the relevantbaseline adopted noise ordinance, if applicablestudy. Design specifications for such sound mitigation shall be provided to the locality before building permit approval.

E. Upon issuance of a certificate of occupancy, the high electrical demand campus operator shall conduct a noise study performed by a third party, certified acoustical engineer to document noise levels emanating from the high electrical demand campus during peak operation of mechanical equipment measured at the property line of the nearest feasibly accessible property to the high electrical demand campus property that is planned or zoned for residential land uses by the locality.

E. Upon issuance of a certificate of occupancy, the data center operator shall conduct a noise study performed by a third-party acoustical engineer to document noise levels emanating from the data center measured at the property line of the nearest property to the data center property that is planned or zoned for residential land uses, or other noise - sensitive use as reasonably determined by the locality during peak operation of the data center mechanical equipment. The highdata electricalcenter demand campusoperator shall also conduct an additional noise study, as measured at the property line of the nearest feasibly accessible property to the data center property that is planned or zoned for residential land uses, or other noise - sensitive use as reasonably determined by the locality, annually during peak operation of the data center mechanical equipment for threefive years after completion of the initial post-construction noise study to confirm compliance with the applicable noise ordinance. The highdata electrical demand campuscenter operator shall provide the results of the noise study to the locality within 6030 days of the anniversary of the initialdate post-constructionon noisewhich studythe certificate of occupancy was issued by the locality.

F. A high electrical demand campus operator may request an extension for submission of relevant sound studies to localities with provided justification based on externalities or factors outside of the high electrical demand campus operator ' s reasonable control that may affect its ability to conduct a study in accordance with the various submission deadlines.

G. Compliance with the requirement s of this section shall constitute an affirmative defense in any subsequent legal action alleging a violation of the applicable noise ordinance, provided that the high electrical demand campus operator can demonstrate that all noise levels from the facility are in compliance with the applicable noise ordinance and site design and requisite mitigation methods are consistent with previous studies and submissions .

F. If the data center operator intends to use backup power generators on the parcel, the operator shall maintain a public website announcing the times when the generators will be in operation. Any routine operation of the backup generators, including for testing purposes, shall be announced on the website at least 24 hours in advance. The operator shall also notify the locality 24 hours in advance of a test. Unless the generators are supplying backup electrical supply during a power outage, backup generators may operate between the hours of 9:00 a.m. and 5:00 p.m., Monday through Friday, excluding holidays. Upon request by the locality, the data center operator shall provide the address of the website where the notices required by this section are published.

G. Any noise ordinance adopted by a locality shall s et maximum allowable sound levels for data centers , including by (i) using alternative low frequency noise metrics and (ii) setting noise rules and enforcement mechanisms in its zoning ordinance, separate from existing noise ordinances.