HB 2266Sesión 2025

Qué cambió entre versiones

17 párrafos cambiaron+76 palabras agregadas−135 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

2025 SESSION

HOUSE SUBSTITUTE

INTRODUCED

25105824D25101827D

HOUSE BILL NO. 2266

AMENDMENT IN THE NATURE OF A SUBSTITUTE

(Proposed by the House Committee on Labor and Commerce

onOffered January 2813, 2025)

(Patron Prior to Substitute—Delegate Tran)

Prefiled January 7, 2025

A BILL to direct the State Corporation Commission to establish a distribution cost sharing program for required distribution system upgrades.

—————

Patrons—Tran and Watts

—————

Referred to Committee on Labor and Commerce

—————

Be it enacted by the General Assembly of Virginia:

1. § 1. A. No later than July 1, 2026, t he State Corporation Commission (the Commission) shall establish by regulation a distribution cost sharing program ( the program) for Phase I and Phase II Utilities, as those terms are defined in subdivision A 1 of § 56-585.1 of the Code of Virginia , to construct distributionrequired system upgrades required to interconnect small generating facilities that are participating projects . Under the program, w hen aan Phaseincumbent Ielectric or Phase II Utilityutility determines that a qualifying upgrade is required to interconnect a triggering project, itthe utility shall determine the costs of the qualifying upgrade charge and the net increase in hosting capacity that would result from the construction of the qualifying upgrade. The costs of the qualifying upgrade shall be subject to approval by the Commission that the costs are reasonable and prudent. The program shall require each Phaseincumbent Ielectric and Phase II Utilityutility to spread the costsvalue of all qualifying upgradesupgrade charges among all participating projects based on the kilowatt-hour output of each participating project. The program shall also require that the costs attributed to jurisdictional participating projects are recovered from juri s dictional customers and costs attributed to nonjurisdictional participating projects are recovered from nonjurisdictional customers. The Commission shall require each utility to file any tariffs, agreements, or forms necessary for the implementation of the program by December 1, 2026.

B. As used in this act:

" H osting capacity" means the amount of aggregate generation that can be accommodated on the electric distribution system without any infrastructure upgrades .

" P articipating project" means any solarsmall generating facility with an AC nameplate rating greater than 50 kilowatts and less than two megawatts within the Phase I or Phase II Utility'sutility's service territory .

" Q ualifying upgrade" means a system upgrade that increases the hosting capacity of the utility's distribution system .

" Q ualifying upgrade charge" means the amount to be paid for a qualifying upgrade .

" S ystem upgrade" means a distribution system upgrade and includes only costs that the Commission determines to be reasonable and prudent .

" T riggering project" means a project application in the interconnection queue at a given substation or feeder that requires a qualifying upgrade to successfully interconnect the project to the electric distribution system .

Volver al texto completo