Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

S. 3736119.º Congreso

Qué cambió entre versiones

41 párrafos cambiaron+800 palabras agregadas−120 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [S. 3736 IntroducedReported in Senate (ISRS)]

<DOC>

Calendar No. 651 119th CONGRESS 2d Session S. 3736

To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota, and for other purposes.

3 párrafos sin cambios

_______________________________________________________________________

IN THE SENATE OF THE UNITED STATES

January 29, 2026

Mr. Rounds (for himself and Mr. Thune) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

September 17, 2026

Reported by Mr. Lee, with an amendment [Strike out all after the enacting clause and insert the part printed in italic]

_______________________________________________________________________

A BILL

To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

<DELETED>SECTION 1. SHORT TITLE.</DELETED>

<DELETED> This Act may be cited as the “Dakota Mainstem Water Supply Project Feasibility Study Act”.</DELETED>

<DELETED>SEC. 2. DEFINITIONS.</DELETED>

<DELETED> In this Act:</DELETED> <DELETED> (1) Dakota mainstem regional water system.—The term “Dakota Mainstem Regional Water System” means the Dakota Mainstem Regional Water System, Inc., a nonprofit corporation established and operated substantially in accordance with the reclamation feasibility standards to serve as a non-Federal project entity for purposes of the cooperative agreement entered into under section 3(a)(1).</DELETED> <DELETED> (2) Reclamation feasibility standards.—The term “reclamation feasibility standards” means the eligibility criteria and feasibility study requirements described in part 404 of title 43, Code of Federal Regulations (or successor regulations).</DELETED> <DELETED> (3) Secretary.—The term “Secretary” means the Secretary of the Interior.</DELETED>

<DELETED>SEC. 3. DAKOTA MAINSTEM WATER SUPPLY PROJECT FEASIBILITY STUDY.</DELETED>

<DELETED> (a) Study.—</DELETED> <DELETED> (1) In general.—The Secretary, in consultation with the Dakota Mainstem Regional Water System, through a cooperative agreement, may undertake a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota.</DELETED> <DELETED> (2) Requirement.—The study under paragraph (1) shall comply with the reclamation feasibility standards.</DELETED> <DELETED> (b) Federal Share.—The Federal share of the total costs of carrying out the feasibility study under this section shall not exceed 50 percent.</DELETED> <DELETED> (c) Authorization of Appropriations.—There is authorized to be appropriated to the Secretary to carry out this section $10,000,000.</DELETED> <DELETED> (d) Termination of Authority.—The authority provided by this section expires on the date that is 10 years after the date of enactment of this Act.</DELETED>

SECTION 1. SHORT TITLE.

This Act may be cited as the “Dakota Mainstem Water Supply Project Feasibility Study Act”.

SEC. 2. DEFINITIONS.

In this Act:

(1) Dakota mainstem water supply project.—The term “Dakota Mainstem Water Supply Project” means the proposed project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota.

(12) DakotaNon-federal mainstemproject regional water systementity.—The term “Dakotanon-Federal Mainstemproject Regional Water Systementity” means the Dakota Mainstem Regional Water System, Inc., a nonprofit corporation established and operated substantially in accordance with the reclamation feasibility standards to serve as a non-Federal project entity for purposes of the cooperative agreement entered into under section 3(a)(1).

(2) Reclamation feasibility standards.—The term “reclamation feasibility standards” means the eligibility criteria and feasibility study requirements described in part 404 of title 43, Code of Federal Regulations (or successor regulations).

(3) Secretary.—The term “Secretary” means the Secretary of the Interior (acting through the Commissioner of Reclamation).

SEC. 3. DAKOTA MAINSTEM WATER SUPPLY PROJECT FEASIBILITY STUDY.

(a) Study.--

(1) In general.—The Secretary, in consultationcoordination with the Dakotanon-Federal Mainstemproject Regional Water Systementity, throughshall acarry cooperative agreement, may undertakeout a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water SystemSupply service areaProject in accordance with the Statesreclamation of South Dakota, Iowa, Nebraska,laws and Minnesotareclamation feasibility standards.

(2) Feasibility report.—After completion of the feasibility study for the Dakota Mainstem Water Supply Project under paragraph (1), the Secretary shall--

(A) develop a feasibility report that includes a recommendation of the Secretary on--

(i) whether the Dakota Mainstem Water Supply Project is found to be technically and financially feasible in accordance with the reclamation laws;

(ii) whether the Dakota Mainstem Water Supply Project should be authorized for construction; and

(iii) the appropriate non-Federal share of construction costs for the Dakota Mainstem Water Supply Project, which shall be at least 25 percent of the total construction costs;

(B) submit the report under subparagraph (A) to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives; and

(2C) Requirement.—Themake the report under subparagraph (A) publicly available, along with associated feasibility study under paragraph (1) shall comply with the reclamation feasibility standardsdocuments.

(3) Consultation and cooperation.—In addition to the non- Federal project entity, the Secretary shall consult and cooperate with appropriate Federal, State, Tribal, regional, and local authorities during the conduct of the feasibility study and development of the feasibility report under this section.

(b) Cost-sharing Agreement for Feasibility Study Costs.—The Secretary shall enter into a cost-sharing agreement (or an appropriate financial assistance agreement, as determined by the Secretary) with the non-Federal project entity to conduct a study under subsection (a) that complies with the reclamation feasibility standards.

(c) Federal Share of Feasibility Study Costs; Funding.--

(b1) Federal Shareshare; funding.—The Federal share of the total costs of carrying out the feasibility study under this section shall not exceed 50 percent.--

(c) Authorization of Appropriations.—There is authorized to be appropriated to the Secretary to carry out this section $10,000,000.

(A) shall not exceed 50 percent; and

(B) shall be paid for by the Secretary using appropriated funds.

(2) Identification of funds.—Not later than 90 days after the date of enactment of this Act, the Secretary shall identify sources of available funds to pay the Federal share under paragraph (1)(B).

(d) Limitation on Expenditures.—Not more than $10,000,000 of Federal funds may be expended to carry out the feasibility study under this section.

(de) Termination of Authority.—The authority provided by this section expires on the date that is 105 years after the date of enactment of this Act. Calendar No. 651

119th CONGRESS

2d Session

S. 3736

_______________________________________________________________________

A BILL

To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota, and for other purposes.

_______________________________________________________________________

September 17, 2026

Reported with an amendment

Volver al texto completo