Introduced
El texto subrayado se agregaría a la ley vigente. El texto tachado se eliminaría.
| By: Virdell | H.B. No. 4817 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to reliability requirements and associated locational | |
| marginal pricing for certain electric generation facilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 39.1592, Utilities Code, is amended to | |
| read as follows: | |
| Sec. 39.1592. GENERATION RELIABILITY REQUIREMENTS. (a) | |
| This section applies only to an electric generation facility in the | |
| ERCOT power region [ |
|
| operation for at least one year, and that is not a self-generator. | |
| (a-1) In this section: | |
| (1) "Pooling" or "pooled generation" means a | |
| combination of electric generation facilities in the same load zone | |
| that elect to meet the reliability standard established under this | |
| Section by sharing, supplementing, or contracting with on-site or | |
| off-site resources. | |
| (2) "Reliability standard" means the percentage of an | |
| electric generation facility's nameplate capacity that is | |
| available to be dispatched under most operating conditions absent | |
| extreme circumstances. | |
| (b) Not later than January 1, 2027[ |
|
| the commission shall establish a single reliability standard for | |
| all electric generation facilities. The commission may adjust the | |
| reliability standard but may not require less than the ability to | |
| run at an availability of 50 percent of the nameplate capacity of | |
| the equipment operated by the generator. [ |
|
| generation facility must be allowed to meet the reliability | |
| standard established under[ |
|
| this subsection by pooling with other electrical generation | |
| facilities within the same load zone. [ |
|
| (c) The commission shall adopt rules for calculating a | |
| settlement price cap, accounting for all subsidies available, for | |
| electric generation facilities that opt out of the reliability | |
| standard established under Subsection (b). The settlement price | |
| cap for electric generation facilities that opt-out of the | |
| reliability standard: | |
| (1) shall not be greater than $50 per megawatt hour on | |
| January 1, 2027; and | |
| (2) shall not be greater than $30 per megawatt hour on | |
| or before January 1, 2037. [ |
|
| |
|
| |
|
| (d) The real-time settlement price for electric generation | |
| facilities that opt-out of the reliability standard established | |
| under Subsection (b) may not fall below $0 per megawatt hour. | |
| (e) An electric generation facility that opts-out of the | |
| reliability standard under Subsection (b) and sells power when the | |
| real-time settlement price is between $0 per megawatt hour and the | |
| cap calculated under Subsection (c) shall receive the real-time | |
| settlement price. At no time shall an electric generation facility | |
| that opts-out of the reliability standard under Subsection (b) | |
| receive more than the cap calculated under Subsection (c). | |
| (f) Any revenue from power sold in the ERCOT market subject | |
| to the settlement price cap calculated under Subsection (c) shall | |
| be subtracted from the total generation billed to all Retail | |
| Electric Providers for each period the power is sold. | |
| (g) The commission shall establish set dates for each owner | |
| or operator of an electric generation facility or pooled generation | |
| facility to elect to meet the reliability standard established | |
| under Subsection (b), which shall not be more often than four times | |
| per year. | |
| (h) Electric generation facilities that elect to meet the | |
| reliability standard established under Subsection (b) by pooling | |
| must meet the reliability standard based upon the combined | |
| nameplate capacity of the pooled generation sites. Pooled | |
| generation facilities must bid into the market as a single | |
| generation site. | |
| (i) Any owner or operator of an electric generation facility | |
| or pooled generation facility that made the election under | |
| Subsection (g), but failed to meet the reliability standard | |
| established under Subsection (b) shall pay the difference between | |
| the replacement power to cover the load lost and the offered price | |
| of the undelivered load on the real-time market. Should the offered | |
| price of the generation facility or pooled generation facility be | |
| greater than 80 percent of the high system-wide offer cap, any | |
| failure to meet the reliability standard shall be calculated at 80 | |
| percent of the high system-wide offer cap instead of the offered | |
| price. | |
| (j) A penalty assessed against an owner or operator of an | |
| electric generation facility or pooled generation facility under | |
| Subsection (i) shall be subtracted from the total generation billed | |
| to all Retail Electric Providers for each period such penalty is | |
| assessed. | |
| (l)[ |
|
| Section 39.151 for the ERCOT power region may not impose penalties | |
| under Subsection (h)[ |
|
| (1) for resource unavailability due to planned | |
| maintenance outages or transmission outages; or | |
| (2) on resources that are already subject to | |
| performance obligations during the highest reliability risk hours | |
| under the day-ahead market rules or other ancillary or reliability | |
| services established by the commission or the independent | |
| organization.[ |
|
| |
|
| SECTION 2. This Act takes effect September 1, 2025. |
Texto oficial de la Legislatura de Texas. El formato se adaptó para leerlo en Ratifi.