House Committee Report
El texto subrayado se agregaría a la ley vigente. El texto tachado se eliminaría.
| 89R26827 SCR-F | ||
| By: Guillen | H.B. No. 3712 | |
| Substitute the following for H.B. No. 3712: | ||
| By: Button | C.S.H.B. No. 3712 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to funds reserved or retained for certain construction | |
| materials. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 2252.032, Government Code, is amended by | |
| amending Subsection (e) and adding Subsection (e-1) to read as | |
| follows: | |
| (e) A governmental entity may not withhold retainage: | |
| (1) after completion of the work required to be | |
| performed under the contract by the prime contractor, including | |
| during the warranty period; [ |
|
| (2) for the purpose of requiring the prime contractor, | |
| after completion of the work required to be performed under the | |
| contract, to perform work on manufactured goods or systems that | |
| were: | |
| (A) specified by the designer of record; and | |
| (B) properly installed by the contractor; or | |
| (3) for specially fabricated material that: | |
| (A) has been delivered by a subcontractor and | |
| accepted by the governmental entity and the prime contractor at the | |
| site or off-site; and | |
| (B) is covered by a manufacturer's warranty: | |
| (i) under a contract with the governmental | |
| entity; or | |
| (ii) assigned to the governmental entity by | |
| the prime contractor. | |
| (e-1) Subsection (e)(3) does not apply to funds for the | |
| value of the installation of the specially fabricated material by a | |
| subcontractor. | |
| SECTION 2. Section 53.101, Property Code, is amended by | |
| amending Subsection (a) and adding Subsections (a-1) and (a-2) to | |
| read as follows: | |
| (a) Except as provided by Subsection (a-1), during [ |
|
| the progress of work under an original contract for which a | |
| mechanic's lien may be claimed and for 30 days after the work under | |
| the contract is completed, the owner shall reserve: | |
| (1) 10 percent of the contract price of the work to the | |
| owner; or | |
| (2) 10 percent of the value of the work, measured by | |
| the proportion that the work done bears to the work to be done, | |
| using the contract price or, if there is no contract price, using | |
| the reasonable value of the completed work. | |
| (a-1) An owner is not required to reserve under this section | |
| and may not retain under a contract funds for specially fabricated | |
| material that: | |
| (1) has been delivered by a subcontractor and accepted | |
| by the owner or a contractor or subcontractor at the site or | |
| off-site; and | |
| (2) is covered by a manufacturer's warranty under a | |
| contract with the owner or a contractor or subcontractor. | |
| (a-2) Subsection (a-1) does not apply to funds for the value | |
| of the installation of specially fabricated material by a | |
| subcontractor. | |
| SECTION 3. The changes in law made by this Act apply only to | |
| an original contract that is entered into on or after the effective | |
| date of this Act. An original contract entered into before the | |
| effective date of this Act is governed by the law as it existed | |
| immediately before the effective date of this Act, and the former | |
| law is continued in effect for that purpose. | |
| SECTION 4. This Act takes effect September 1, 2025. |