Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

HB 1523Sesión 89R

Qué cambió entre versiones

61 párrafos cambiaron+183 palabras agregadas−275 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

By: Gerdes

By: Gerdes (Senate Sponsor - Schwertner)

H.B. No. 1523

(In the Senate - Received from the House May 14, 2025;

May 15, 2025, read first time and referred to Committee on Water,

Agriculture and Rural Affairs; May 23, 2025, reported adversely,

with favorable Committee Substitute by the following vote: Yeas 8,

Nays 0; May 23, 2025, sent to printer.)

Click here to see the committee vote

COMMITTEE SUBSTITUTE FOR H.B. No. 1523

By: Hancock

A BILL TO BE ENTITLED

AN ACT

relating to a restrictiontemporary prohibition on the authorization by the Texas

Texas Commission on Environmental Quality of the use of a Class V

injection well for certain aquifer storage and recovery projects.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter G, Chapter 27, Water Code, is amended

by adding Section 27.1535 to read as follows:

Sec. 27.1535. RESTRICTIONTEMPORARY PROHIBITION ON AUTHORIZATIONS OF USE OF

USE OF CERTAIN CLASS V INJECTION WELLS. (a) This section applies only to

only to a Class V injection well that is: located in any portion of

the territory of a groundwater conservation district that has

adopted a resolution finding that Class V injection wells pose

(1)environmental risks to aquifers located in any portion of the territory of athe

district.

(b) The commission may not authorize the use of a Class V

injection well for an aquifer storage and recovery project operated

by a municipally owned utility that primarily provides water to a

municipality that:

(1) has a population of 750,000 or more; and

(2) is located in a county adjacent to a county in

which a groundwater conservation district thatdescribed isby located wholly or partlySubsection

in a county that:

(A) has a population of more than 70,000 and less

than 100,000 and contains a portion of the Colorado River; and

(B) is adjacent to a county that has a population

of one million or more; and

(2) used for an aquifer storage and recovery project

operated by a municipally owned utility that primarily provides

water to a municipality that:

(A) has a population of 750,000 or more; and

(B) is located in a county adjacent to a county

described by Subdivision (1).

(b) As a condition of authorizing the use of a Class V

injection well for an aquifer storage and recovery project, the

commission shall require that:

(1) the project withdraw no more water than is

injected into the aquifer;

(2) the project establish monitoring wells;

(3) water quality testing be conducted in accordance

with Section 27.156 and commission rules adopted under that

section; and

(4) well monitoring data obtained under Subdivision

(2) and water quality testing data obtained under Subdivision (3)

be provided to the groundwater conservation district described by

Subsection (a)(1).

(c) Before authorizing the use of a Class V injection well

for an aquifer storage and recovery project, the commission shall

hold a public meeting in the county in which the injection well is

proposed to be located.

(d) The commission may not authorize the use of a Class V

injection well for an aquifer storage and recovery project if the

authorization does not include the terms provided by Subsection

(b).

(a) is wholly or partly located.

(c) This section expires December 31, 2027.

SECTION 2. This Act takes effect immediately if it receives

3 párrafos sin cambios

a vote of two-thirds of all the members elected to each house, as

provided by Section 39, Article III, Texas Constitution. If this

Act does not receive the vote necessary for immediate effect, this

Act takes effect September 1, 2025.

* * * * *

Volver al texto completo