Enrolled
El texto subrayado se agregaría a la ley vigente. El texto tachado se eliminaría.
| S.B. No. 1758 |
| AN ACT | ||
| relating to the operation of a cement kiln and the production of | ||
| aggregates near a semiconductor wafer manufacturing facility. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Chapter 382, Health and Safety Code, is amended | ||
| by adding Subchapters M and M-1 to read as follows: | ||
| SUBCHAPTER M. CEMENT OR AGGREGATE PRODUCTION AND SEMICONDUCTOR | ||
| WAFER MANUFACTURING FACILITY | ||
| Sec. 382.601. DEFINITIONS. In this subchapter: | ||
| (1) "Aggregate production operation" has the meaning | ||
| assigned by Section 28A.001, Water Code. | ||
| (2) "Portland cement kiln" means a system, including | ||
| any solid, gaseous, or liquid fuel combustion equipment, used to | ||
| calcine and fuse raw materials, including limestone and clay, to | ||
| produce portland cement clinker. | ||
| (3) "Semiconductor wafer manufacturing facility" | ||
| means a manufacturing facility that conducts any of the following | ||
| processes with respect to semiconductor production: | ||
| (A) growing single-crystal ingots or boules; | ||
| (B) wafer slicing; | ||
| (C) etching and polishing; | ||
| (D) bonding; | ||
| (E) cleaning; | ||
| (F) epitaxial deposition; or | ||
| (G) metrology. | ||
| Sec. 382.602. LIMITATION OF LIABILITY. An owner or | ||
| operator of a facility operating under a new source review permit | ||
| issued under this chapter that authorizes the operation of a | ||
| portland cement kiln, or the production of aggregates at an | ||
| aggregate production operation, is not liable for damages to a | ||
| semiconductor wafer manufacturing facility resulting from seismic | ||
| or vibrational disturbances caused by the cement or aggregate | ||
| production facility owner's or operator's activities on the site of | ||
| the cement or aggregate production facility if the cement or | ||
| aggregate production facility began operating before the date the | ||
| semiconductor wafer manufacturing facility began operating. | ||
| SUBCHAPTER M-1. CEMENT OR AGGREGATE PRODUCTION AND SEMICONDUCTOR | ||
| WAFER MANUFACTURING FACILITY PILOT PROGRAM: GRAYSON COUNTY | ||
| Sec. 382.651. DEFINITIONS. In this subchapter: | ||
| (1) "Aggregate production operation" has the meaning | ||
| assigned by Section 28A.001, Water Code. | ||
| (2) "Bureau" means the Bureau of Economic Geology of | ||
| The University of Texas at Austin. | ||
| (3) "Portland cement kiln" means a system, including | ||
| any solid, gaseous, or liquid fuel combustion equipment, used to | ||
| calcine and fuse raw materials, including limestone and clay, to | ||
| produce portland cement clinker. | ||
| (4) "Semiconductor wafer manufacturing facility" has | ||
| the meaning assigned by Section 382.601. | ||
| Sec. 382.652. GRAYSON COUNTY PILOT PROGRAM. This | ||
| subchapter applies only to: | ||
| (1) a semiconductor wafer manufacturing facility that | ||
| begins commercial operation after January 1, 2025, and before | ||
| December 31, 2025; and | ||
| (2) a facility that: | ||
| (A) is proposed to be constructed under or is | ||
| operating under a new source review permit that authorizes the | ||
| construction or operation of a portland cement kiln; and | ||
| (B) is associated with a facility that produces | ||
| aggregates at an aggregate production operation. | ||
| Sec. 382.653. STUDY AND REPORT. (a) The bureau shall | ||
| conduct a study, in consultation with owners or operators of | ||
| facilities described by Section 382.652 in Grayson County, to: | ||
| (1) analyze seismological data related to aggregate | ||
| production operations; | ||
| (2) assess the vibrational impact of the production of | ||
| aggregates on bedrock; | ||
| (3) analyze vibrational parameters necessary to | ||
| ensure the successful operation of a semiconductor wafer | ||
| manufacturing facility within 10 miles of a facility described by | ||
| Section 382.652(2); and | ||
| (4) investigate whether a minimum distance between a | ||
| facility described by Section 382.652(2) and a semiconductor wafer | ||
| manufacturing facility is necessary to prevent seismic or | ||
| vibrational disruption to the operation of the semiconductor wafer | ||
| manufacturing facility, considering the depth of the excavation | ||
| activities conducted for the production of aggregates. | ||
| (b) In conducting the study under this section, the bureau | ||
| may: | ||
| (1) collaborate with: | ||
| (A) the commission and any other state agency, | ||
| political subdivision, or institution of higher education; and | ||
| (B) any other stakeholder or private entity as | ||
| necessary; and | ||
| (2) enter into a nondisclosure agreement with a | ||
| private entity. | ||
| (c) In addition to money appropriated by the legislature to | ||
| the bureau for the purpose of this section, the bureau may accept | ||
| gifts, grants, and other donations for the purposes of conducting | ||
| the study under this section. | ||
| (d) Not later than August 1, 2026, the bureau shall prepare | ||
| and submit to the governor, the lieutenant governor, the speaker of | ||
| the house of representatives, and each standing legislative | ||
| committee with primary jurisdiction over the environment or natural | ||
| resources a report on the results of the study conducted under this | ||
| section and any recommendations for legislative or other action. | ||
| Sec. 382.654. OPERATIONS WITHIN STUDY AREA. The commission | ||
| may not issue, renew, or amend a permit or authorize the use of a | ||
| standard permit or a permit by rule under this chapter for the | ||
| construction or operation of a facility described by Section | ||
| 382.652(2) within 10 miles of a facility described by Section | ||
| 382.652(1) in Grayson County. | ||
| Sec. 382.655. EXPIRATION. This subchapter expires | ||
| September 1, 2031. | ||
| SECTION 2. If any provision of this Act or its application | ||
| to any person or circumstance is held invalid, the invalidity does | ||
| not affect the other provisions or applications of this Act that can | ||
| be given effect without the invalid provision or application, and | ||
| to this end the provisions of this Act are severable. | ||
| SECTION 3. Section 382.602, Health and Safety Code, as | ||
| added by this Act, applies only to a cause of action that accrues on | ||
| or after the effective date of this Act. A cause of action that | ||
| accrues before the effective date of this Act is governed by the law | ||
| applicable to the cause of action immediately before the effective | ||
| date of this Act, and that law is continued in effect for that | ||
| purpose. | ||
| SECTION 4. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2025. | ||
| ______________________________ | ______________________________ | |
| President of the Senate | Speaker of the House | |
| I hereby certify that S.B. No. 1758 passed the Senate on | ||
| April 15, 2025, by the following vote: Yeas 23, Nays 7, one | ||
| present not voting. | ||
| ______________________________ | ||
| Secretary of the Senate | ||
| I hereby certify that S.B. No. 1758 passed the House on | ||
| May 28, 2025, by the following vote: Yeas 115, Nays 24, three | ||
| present not voting. | ||
| ______________________________ | ||
| Chief Clerk of the House | ||
| Approved: | ||
| ______________________________ | ||
| Date | ||
| ______________________________ | ||
| Governor |
Texto oficial de la Legislatura de Texas. El formato se adaptó para leerlo en Ratifi.