Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

HB 351189.ª Legislatura (2025)

Qué cambió entre versiones

14 párrafos cambiaron+25 palabras agregadas−39 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

89R22264 CXP-F

By: Anchía

By: Anchía, Hunter, Bhojani, Hernandez,

H.B. No. 3511

Substitute the following for H.B. No. 3511:

By: King

C.S.H.B. No. 3511

Garcia of Dallas

A BILL TO BE ENTITLED

17 párrafos sin cambios

AN ACT

relating to the participation of electric vehicles in the ERCOT

market.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter Z, Chapter 39, Utilities Code, is

amended by adding Section 39.9161 to read as follows:

Sec. 39.9161. INTERCONNECTION AND AGGREGATION OF ELECTRIC

VEHICLES. (a) In this section:

(1) "Electric vehicle" has the meaning assigned by

Section 42.0102.

(2) "Interconnection" means the right of an electric

vehicle owner to physically connect the electric vehicle to an

electricity distribution system and the technical requirements,

rules, or processes for the connection.

(b) The commission by rule may establish safety, technical,

and performance standards for the interconnection of electric

vehicles in the ERCOT power region. In adopting the rules, the

commission shall ensure that the standards do not conflict with

applicable standards published by the Underwriters Laboratories,

and the Institute of Electrical and Electronics Engineers, with the

the National Electrical Code, or with the National Electrical Safety Code,

and the Institute of Electrical and Electronics Engineers.

Code.

(c) The commission by rule may establishallow aan programelectric to allowvehicle

an electric vehicle owner to:

(1) make electricity stored by the electric vehicle

6 párrafos sin cambios

available for sale in the wholesale energy and ancillary services

markets through a registered aggregator or load serving entity; and

(2) participate in ERCOT market mechanisms, including

ancillary services, virtual power plant programs, and aggregate

distributed energy resources programs, through an aggregation

described by Subdivision (1).

SECTION 2. This Act takes effect September 1, 2025.

Volver al texto completo