By: Gerdes
By: Gerdes (Senate Sponsor - Schwertner)
H.B. No. 1523
(In the Senate - Received from the House May 14, 2025;
May 15, 2025, read first time and referred to Committee on Water,
Agriculture and Rural Affairs; May 23, 2025, reported adversely,
with favorable Committee Substitute by the following vote: Yeas 8,
Nays 0; May 23, 2025, sent to printer.)
Click here to see the committee vote
COMMITTEE SUBSTITUTE FOR H.B. No. 1523
By: Hancock
A BILL TO BE ENTITLED
AN ACT
relating to a restrictiontemporary prohibition on the authorization by the Texas
Texas Commission on Environmental Quality of the use of a Class V
injection well for certain aquifer storage and recovery projects.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. Subchapter G, Chapter 27, Water Code, is amended
by adding Section 27.1535 to read as follows:
Sec. 27.1535. RESTRICTIONTEMPORARY PROHIBITION ON AUTHORIZATIONS OF USE OF
USE OF CERTAIN CLASS V INJECTION WELLS. (a) This section applies only to
only to a Class V injection well that is: located in any portion of
the territory of a groundwater conservation district that has
adopted a resolution finding that Class V injection wells pose
(1)environmental risks to aquifers located in any portion of the territory of athe
district.
(b) The commission may not authorize the use of a Class V
injection well for an aquifer storage and recovery project operated
by a municipally owned utility that primarily provides water to a
municipality that:
(1) has a population of 750,000 or more; and
(2) is located in a county adjacent to a county in
which a groundwater conservation district thatdescribed isby located wholly or partlySubsection
in a county that:
(A) has a population of more than 70,000 and less
than 100,000 and contains a portion of the Colorado River; and
(B) is adjacent to a county that has a population
of one million or more; and
(2) used for an aquifer storage and recovery project
operated by a municipally owned utility that primarily provides
water to a municipality that:
(A) has a population of 750,000 or more; and
(B) is located in a county adjacent to a county
described by Subdivision (1).
(b) As a condition of authorizing the use of a Class V
injection well for an aquifer storage and recovery project, the
commission shall require that:
(1) the project withdraw no more water than is
injected into the aquifer;
(2) the project establish monitoring wells;
(3) water quality testing be conducted in accordance
with Section 27.156 and commission rules adopted under that
section; and
(4) well monitoring data obtained under Subdivision
(2) and water quality testing data obtained under Subdivision (3)
be provided to the groundwater conservation district described by
Subsection (a)(1).
(c) Before authorizing the use of a Class V injection well
for an aquifer storage and recovery project, the commission shall
hold a public meeting in the county in which the injection well is
proposed to be located.
(d) The commission may not authorize the use of a Class V
injection well for an aquifer storage and recovery project if the
authorization does not include the terms provided by Subsection
(b).
(a) is wholly or partly located.
(c) This section expires December 31, 2027.
SECTION 2. This Act takes effect immediately if it receives
3 párrafos sin cambios
a vote of two-thirds of all the members elected to each house, as
provided by Section 39, Article III, Texas Constitution. If this
Act does not receive the vote necessary for immediate effect, this
Act takes effect September 1, 2025.
* * * * *