H2650B3626A03841 MSP:JMT 06/22/26 #90 A03841AMENDMENTS TO HOUSE BILL NO. 2650Sponsor: REPRESENTATIVE WEBSTERPrinter's No. 3626Amend Bill, page 15, by inserting between lines 5 and 6(8) A regional benefits plan, including a commitment to do all of the following:(i) Identify the regional impact area, which shall include all of the following:(A) Each municipality located within a 25-mile radius of the GRID project.(B) Each county located within a 25-mile radius of the GRID project.(C) Any school district, emergency service provider or water, sewer or transportation authority located within a 25-mile radius of the GRID project whose infrastructure or service area is reasonably expected to be affected by the GRID project.(ii) Provide documentation that the owner or operator will deliver written notice to each political subdivision and public authority identified under subparagraph (i) and offer at least one informational meeting to each entity for the purpose of receiving comments on anticipated regional impacts.(iii) Summarize expected regional impacts, including traffic, emergency services, water and wastewater use, storm water, air quality and noise, based on studies prepared for the community benefit agreement under paragraph (7).(iv) Describe specific mitigation actions the owner or operator will undertake to address regional impacts identified under subparagraph (iii). Mitigation actions may include:(A) Transportation improvements located outside the host jurisdiction.(B) Support for county level emergency management planning.(C) Regional air quality monitoring or environmental restoration.(D) Watershed or storm water improvements.(E) Other commitments identified during consultation with regional authorities.2026/90MSP/HB2650A03841 - 1 -1234567891011121314151617181920212223242526272829303132333435363738
(v) Provide financial contributions to support projects or services that produce measurable benefits within the regional impact area. Contributions may be made directly to affected municipalities, school districts, emergency service providers or public authorities.Amend Bill, page 15, line 6, by striking out "(8)" and inserting (9)Amend Bill, page 16, line 24, by striking out "(9)" and inserting (10)Amend Bill, page 16, lines 25 through 30; page 17, lines 1 through 9; by striking out all of said lines on said pages and inserting (i) Anticipated waste or treated water discharges, if any.(ii) Estimated average annual water consumption.(iii) Anticipated maximum daily water demand.(iv) Source of water to be utilized, including the water quality standard use designation under 25 Pa. Code Ch. 93 (relating to water quality standards) of the source of water, if any.(v) Expected average annual water usage effectiveness.(vi) A commitment to utilize the best available technologies and other efficiency measures to mitigate impacts to the quantity or quality of water for other uses or users, including designated and existing uses under 25 Pa. Code Ch. 93.(vii) For GRID projects that have a physical footprint, point source of water withdrawal or point source of storm water discharge located within a watershed designated as High Quality Waters under 25 Pa. Code Ch. 93, the watershed of a designated public water system source under 25 Pa. Code Ch. 109 (relating to safe drinking water) or 1,000 feet of a tributary which flows into a public water system source under 25 Pa. Code Ch. 109, a hydrogeological study shall be submitted to the department. The following shall apply:(A) The hydrogeological study shall include:(I) An assessment of baseline water quality at all relevant tributary monitoring points.(II) Consumptive use and storm water 2026/90MSP/HB2650A03841 - 2 -1234567891011121314151617181920212223242526272829303132333435363738394041424344
discharge on both surface water and groundwater sources.(III) Identification of specific mitigation measures to protect water sources.(B) The study shall be prepared by a professional geologist with relevant experience in hydrogeological analysis and licensed in this Commonwealth.(C) The department shall transmit the study to the Department of Environmental Protection within 10 days of receipt of the study.(D) The Department of Environmental Protection shall have 45 days to review the study and provide written comments to the department on whether the study was conducted in a satisfactory manner.(E) The department may not issue a GRID certification to GRID projects located in a watershed designated as Exceptional Value Waters under 25 Pa. Code Ch. 93.(viii) If the GRID project is within the jurisdiction of a river basin commission, documentation that the owner or operator has received approval for water withdrawal from the relevant river basin commission.(ix) If the GRID project has a physical footprint, point of source of water withdrawal or point of source of storm water discharge located within an area described under subparagraph (vii), the owner or operator shall commit to performing baseline water quality monitoring at the applicable tributary points utilized for water withdrawal or discharge, as approved by the Department of Environmental Protection, prior to the commencement of construction and any ground disturbance. The commitment under this subparagraph shall include the following:(A) Upon the commencement of commercial operations, the owner or operator shall submit annual water quality reporting data from the approved tributary points to the Department of Environmental Protection for review.(B) Upon review of the annual reporting data, the Department of Environmental Protection may require corrective action if the report identifies material degradation of the water source at the applicable tributary points.(C) If the material degradation of the water source is not corrected by the owner or operator to the satisfaction of the Department of Environmental Protection, the department shall revoke a GRID certification of a computer data center issued under this article.(11) A noise and vibration mitigation plan that includes 2026/90MSP/HB2650A03841 - 3 -123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051
all of the following:(i) Documentation that the GRID project will comply with an applicable local law, ordinance or regulation relating to sound or vibration limits, including a required permit, study or certification demonstrating compliance.(ii) If the jurisdiction in which the GRID project will be located does not have an applicable zoning ordinance relating to noise or vibration standards, a description of the mitigation measures that the owner or operator will take to mitigate noise and vibration impacts on the surrounding community. The description shall include any of the following designed to minimize noise impacts:(A) Operational practices.(B) Engineering controls.(C) Monitoring activities.Amend Bill, page 19, by inserting between lines 8 and 9(6) Confirmation that it has submitted all documentation required under its noise and vibration mitigation plan and, if applicable, the status of compliance with the mitigation measures specified under section 2903-D.1(a)(11)(ii).(7) Confirmation that its regional benefits plan has been fully implemented.Amend Bill, page 19, line 9, by striking out "If" and inserting Except as provided under section 2909-D.1(e), ifAmend Bill, page 19, by inserting after line 30(5) An annual certification signed by an officer of the owner or operator that identifies whether the owner or operator completed each commitment contained in the community benefit plan required under section 2903-D.1(a)(7) during the preceding year and, if not, identifies each commitment that remains in progress and the steps the owner or operator is taking to complete each commitment.Amend Bill, page 20, line 1, by striking out "(5)" and inserting (6)Amend Bill, page 20, by inserting between lines 5 and 6(c) Public posting.--The department shall make the information submitted under subsection (a)(5) available on the department's publicly accessible Internet website. The department shall withhold from public disclosure proprietary 2026/90MSP/HB2650A03841 - 4 -12345678910111213141516171819202122232425262728293031323334353637383940414243
information consistent with section 2911-D.1.(d) Municipal comments.--A municipality in which a GRID project is located, or a municipality or public authority located within 25 miles of the GRID project, may submit written comments to the department if the municipality or public authority has reason to believe that the owner or operator is not satisfying one or more commitments contained in the community benefit agreement. The department shall review the comments and, as necessary, request additional information from the owner or operator to evaluate compliance . Amend Bill, page 20, line 15, by striking out "If" and inserting Except as provided under subsection (e), ifAmend Bill, page 21, by inserting between lines 11 and 12(e) Corrective action plan.--Before the department revokes a GRID certification on the basis that an owner or operator failed to comply with a community benefit commitment under section 2903-D.1(a)(7), the department shall provide written notice to the owner or operator that identifies the deficiency and provides the owner or operator with not less than 60 days to submit and implement a corrective action plan to address the deficiency. The department shall revoke the GRID certification if the department determines that the owner or operator failed to submit or implement the corrective action plan or failed to address the deficiency under the corrective action plan.2026/90MSP/HB2650A03841 - 5 -12345678910111213141516171819202122232425
Texto oficial de la Legislatura de Pennsylvania. El formato se adaptó para leerlo en Ratifi.