House Amendment A02799
H2076B2659A02799 NAD:EJH 04/02/26 #90 A02799AMENDMENTS TO HOUSE BILL NO. 2076Sponsor: REPRESENTATIVE VENKATPrinter's No. 2659Amend Bill, page 1, by inserting between lines 11 and 12Section 7. Estate owner objections and procedures.Amend Bill, page 1, line 12, by striking out "7" and inserting 8Amend Bill, page 1, line 13, by striking out "8" and inserting 9Amend Bill, page 1, line 14, by striking out "9" and inserting 10Amend Bill, page 1, line 15, by striking out "10" and inserting 11Amend Bill, page 1, line 16, by striking out "11" and inserting 12Amend Bill, page 1, line 17, by striking out "12" and inserting 13Amend Bill, page 1, line 18, by striking out "13" and inserting 14Amend Bill, page 2, line 2, by striking out "14" and 2026/90NAD/HB2076A02799 - 1 -123456789101112131415161718192021222324
inserting 15Amend Bill, page 2, line 3, by striking out "15" and inserting 16Amend Bill, page 2, by inserting between lines 3 and 4Section 17. Construction.Amend Bill, page 2, line 4, by striking out "16" and inserting 18Amend Bill, page 6, lines 12 through 17, by striking out all of said lines and inserting The Environmental Quality Board shall have the power and duty to promulgate rules and regulations to carry out the provisions of this act.Amend Bill, page 7, lines 23 through 30; pages 8 through 14, lines 1 through 30; page 15, lines 1 through 21; by striking out all of said lines on said pages and inserting Section 5. Authorization of projects.(a) Resource production.--Geothermal energy projects are authorized in this Commonwealth, including for the purposes of electricity production, heating and cooling. To operate a geothermal energy project under this act, a well operator must obtain a geothermal well permit issued by the department.(b) Right to inspect.--Upon issuance of a permit to construct or operate a geothermal energy project, the department may enter onto private or public land, with proper identification, to inspect a geothermal energy project to determine if the project is being constructed, operated or maintained in compliance with all applicable permits and environmental laws or to investigate any unreasonable risk to public health, property, natural resources or the environment.(c) Class V injection wells.--To operate a Class V Underground Injection Control well for the purpose of producing geothermal resources, a well operator shall obtain a UIC Class V permit, or permit-by-rule status, and all other permits as required by applicable statutes and regulations.(d) Oil and gas well conversion.--Upon issuance of all necessary permits for a repurposed well, a person may repurpose an existing conventional or unconventional well, including an 2026/90NAD/HB2076A02799 - 2 -12345678910111213141516171819202122232425262728293031323334353637383940
abandoned well, for the cogeneration of geothermal resources or geothermal energy with oil and gas production or the production or use of geothermal resources or geothermal energy for heating, cooling or electricity production, regardless of depth or temperature. The department may revoke a permit issued under this section if the department determines that a well operator is knowingly or intentionally attempting to avoid the fulfillment of obligations under 58 Pa.C.S. § 3220 (relating to plugging requirements).(e) Exploratory wells.--Upon issuance of a permit by the department, a person may drill an exploratory well to identify potential viability for geothermal resource production below the surface of the real property.Section 6. Regulations.(a) Well safety and permit requirements.--For the purpose of protecting the Commonwealth's natural resources and public health, safety and welfare, the Environmental Quality Board shall, in consultation with the Pennsylvania Geological Survey, promulgate regulations to:(1) Establish permitting criteria for well operators, including specific permitting criteria for repurposed wells and exploratory wells.(2) Consider community impact analysis, including setback considerations, in permitting for geothermal energy projects.(3) Establish siting, design and other technical specifications and requirements.(4) Determine performance criteria for repurposed wells to prevent delayed well plugging or improper abandonment.(5) Require the spacing, drilling, casing, testing, operating, producing, plugging and decommissioning of geothermal wells and repurposed wells to prevent:(i) Geothermal resources, water, gases or other fluids from escaping into strata other than where it is found, unless in accordance with a UIC Class V permit and approved by the department.(ii) Pollution of surface and groundwater, including wastewater management during well development or production.(iii) Premature cooling of any geothermal system by water encroachment or other means that reduce the economic recovery of the geothermal resources.(iv) Blowouts, explosions, fires, cave-ins and seepage.(v) Unreasonable disturbance or injury to surrounding property, existing water rights, public health and the environment.(vi) Orphaning or abandoning wells without proper site remediation and well plugging.(6) Establish a decommissioning process for plugging and abandoning a geothermal well, repurposed well and exploratory 2026/90NAD/HB2076A02799 - 3 -123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051
well.(7) Establish bonding or other financial security requirements for well operators drilling a geothermal well, repurposed well or exploratory well. The following shall apply:(i) Regardless of the well depth or drilling technique, the department shall have the authority to set bonding or other financial security requirements in amounts deemed appropriate by the department to remediate the wells and protect the environment, public health and safety.(ii) The well operator shall file cash or individual bonds for each new geothermal well, repurposed well or exploratory well drilled and each abandoned well redrilled.(iii) In lieu of separate well bonds, the well operator may file a blanket cash or individual bond in an amount determined by the department to cover the well operator's drilling, maintenance or plugging and decommissioning activities for wells in this Commonwealth.(iv) Any bond or other financial security filed with the department may be terminated or canceled with the consent of the department.(v) The surety may be relieved of all obligations when the covered well or wells have been properly decommissioned or it has been replaced by another valid bond.(vi) A bond may not exceed a comparable bond set for an unconventional, conventional or carbon dioxide injection well unless the department demonstrates that the fees are necessary to maintain oversight and enforcement based on specific well characteristics.(8) Determine criteria necessary to release bonding or other financial assurance.(9) Establish reasonable fees, not to exceed comparable fees, set for unconventional, conventional or carbon dioxide injection wells unless the department demonstrates that the fees are necessary to maintain oversight and enforcement based on specific well characteristics to cover the costs incurred by the department to administer the provisions of this act.(10) Establish a process to suspend operations, shut-in a geothermal well or repurposed well and remove equipment from a well if the department has determined the well operator is in violation of any rules or regulations established under this act or other laws of this Commonwealth.(11) Determine well reporting, recordkeeping and other appropriate disclosure requirements for well operators to file with the department. The department shall require:2026/90NAD/HB2076A02799 - 4 -123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051
(i) Identification of the location and ownership of all wells and producing geothermal leases.(ii) Filing a notice of intent to drill, redrill, deepen, permanently alter the casing of a well or abandon any well. A notice of intent must be approved by the department prior to commencement of operations.(iii) Keeping of well logs, including temperature and depth data, and filing accurate copies with the department.(iv) Filing any other reasonable reports regarding geothermal operations in this Commonwealth.(12) Determine criteria for geothermal wells or repurposed wells stimulated by any form of hydraulic fracturing, including any appropriate provisions or regulations under 58 Pa.C.S. Ch. 32 Subch. B (relating to general requirements), if the department determines it is necessary to prevent groundwater contamination or other environmental harms.(b) Permit denial.--The department may condition or deny a permit based on the criteria specified in the regulations promulgated by the Environmental Quality Board under this section.(c) Well impact review.--In a decision to issue a final permit for a geothermal well within a census tract with an environmental exposure score in the 80th percentile or greater using the PennEnviroScreen tool provided by the department, the department may require reasonable additional impact assessments, public participation, transparency and reporting measures as part of a permit review or approval.(d) Department fees.--The department may charge a permit fee or periodic management fee sufficient to maintain oversight and enforcement for geothermal energy projects in this Commonwealth, not to exceed comparable fees set for the purpose of oil and gas production from an unconventional, conventional or carbon dioxide injection well, unless the department demonstrates that the fees are necessary to maintain oversight and enforcement based on specific well characteristics such as loop system type, type of energy generated and depth. The fees collected under this subsection shall be deposited into the fund.(e) Expedited permits.--The department shall consider the establishment of an expedited permitting process for a person holding an existing well permit under 58 Pa.C.S. § 3211 (relating to well permits) to obtain a permit under this section.(f) Hydraulic fracturing.--For geothermal energy projects stimulated by any form of hydraulic fracturing or repurposing of an existing well that involves hydraulic fracturing operations, the department shall consider the environmental risks and may instead require the well operator to seek an unconventional well permit under 58 Pa.C.S. Ch. 32 Subch. B or to comply with additional permit conditions consistent with subsection (a).2026/90NAD/HB2076A02799 - 5 -123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051
Section 7. Estate owner objections and procedures.(a) Notice.--Upon submission of a permit application, a well operator shall provide notice of application to the surface property interest owners within 1,500 feet of the well bore.(b) Well design.--To operate a geothermal energy project under this section, a well operator shall design the geothermal energy project as much as practicable to isolate any existing or future production from the commercially valuable material, including of the coal or oil and gas estate, from the subsurface geothermal production area and shall indicate whether a geothermal energy project contains commercially valuable mineral, including the coal or oil and gas estates and, if it does, a permit may be issued only if the department is satisfied that the interests of the mineral, including coal or oil and gas estate, will not be adversely affected and the subsurface property interest owners have been notified by the well operator.(c) Objections.--If a subsurface property interest owner is a producer of a commercially valuable mineral, including coal or oil and gas, the well operator shall notify the subsurface property interest owner in writing and submit a copy of the notice to the department. If, upon receipt of the notice, the subsurface property interest owners express an objection to the department to the design of the geothermal energy project based on the potential adverse effect to a commercially valuable mineral, including the coal or oil and gas estate, the well operator shall address the objection to the satisfaction of the department.(d) Right to action prohibited.--(1) No right to action shall arise with respect to this section if a well operator addresses the objection under subsection (c) to the satisfaction of the department in good faith.(2) A determination by the department that the operator has satisfactorily addressed the objection shall be a departmental action appealable by the subsurface property interest owner who has raised the objection to the Environmental Hearing Board, as provided under section 4 of the act of July 13, 1988 (P.L.530, No.94), known as the Environmental Hearing Board Act. The appeal must be filed in accordance with the rules for filing an appeal of a final agency action with the Environmental Hearing Board and no later than 30 days following receipt of notice that the objection has been satisfied.(e) Dispute resolution.--The department, or any person having a direct interest in a matter subject to this act, may, at any time, request that a conference be held to discuss and attempt to resolve by mutual agreement a matter arising under this act. The following shall apply:(1) Unless otherwise provided, conferences shall be held within 90 days after a request is received by the department 2026/90NAD/HB2076A02799 - 6 -123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051
and notice shall be given by the department to all interested parties.(2) A representative of the department shall attend the conference and the department may make recommendations.(3) An agreement reached at a conference shall be consistent with this act and, if approved by the department, the agreement shall be reduced to writing and shall be effective unless reviewed and rejected by the department within 10 days after the conference.(4) The record of an agreement approved by the department shall be kept on file by the department and copies shall be furnished to the parties.(5) The scheduling of a conference shall have no effect on the department's authority to issue orders to compel compliance with this act.Amend Bill, page 15, line 22, by striking out "7" and inserting 8Amend Bill, page 16, line 6, by striking out "8" and inserting 9Amend Bill, page 16, line 16, by striking out "9" and inserting 10Amend Bill, page 16, line 19, by striking out "10" and inserting 11Amend Bill, page 18, line 11, by striking out "11" and inserting 12Amend Bill, page 19, line 13, by striking out "12" and inserting 13Amend Bill, page 20, line 23, by striking out "13" and inserting 14Amend Bill, page 21, line 13, by striking out "14" and 2026/90NAD/HB2076A02799 - 7 -12345678910111213141516171819202122232425262728293031323334353637
inserting 15Amend Bill, page 22, line 9, by striking out "15" and inserting 16Amend Bill, page 22, by inserting between lines 25 and 26Section 17. Construction.Nothing in this act shall be construed to amend or modify the provisions or regulations promulgated under 58 Pa.C.S. Ch. 32 (relating to development).Amend Bill, page 22, line 26, by striking out "16" and inserting 182026/90NAD/HB2076A02799 - 8 -12345678910111213
Texto oficial de la Legislatura de Pennsylvania. El formato se adaptó para leerlo en Ratifi.