Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

S 2816Sesión 221

Qué cambió entre versiones

10 párrafos cambiaron+160 palabras agregadas−22 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

[FirstSecond Reprint]

SENATE, No. 2816

10 párrafos sin cambios

STATE OF NEW JERSEY

221st LEGISLATURE

INTRODUCED FEBRUARY 22, 2024

Sponsored by:

Senator BOB SMITH

District 17 (Middlesex and Somerset)

Senator JOHN F. MCKEON

District 27 (Essex and Passaic)

SYNOPSIS

Requires electric public utilities to submit to BPU and implement electric infrastructure improvement plans.

CURRENT VERSION OF TEXT

As reportedamended by the Senate Environment and Energy Committee on MarchMay 413, 2024, with amendments.

An Act concerning distributed energy sources and supplementing Title 48 of the Revised Statutes.

3 párrafos sin cambios

Be It Enacted by the Senate and General Assembly of the State of New Jersey:

1. a. As used in this section:

"Board" means the Board of Public Utilities.

"Reactive power" means the portion of alternating current electricity, measured in volt-amperes reactive, that cannot do useful work due to a misalignment of the current and voltage waveforms of the electricity.

b. The Board of Public Utilities shall require each electric public utility to file, no later than 2 [ 90 ] 120 2 days after the effective date of this act, an electric infrastructure improvement plan, in accordance with procedures established by the board. The purpose of the plans shall be to reopen many of the State’s electric distribution circuits that have been closed to any additional renewable energy installations, or restricted to 100 kilowatts or less of remaining circuit capacity. 1 A plan shall not be required to include infrastructure improvements to the electric transmission system. 1 Each plan shall include provisions for:

(1) permitting the flow of electricity, through an electrical substation, from the distribution system to the transmission system;

(2) requiring 2 those 2 solar inverters 2 that are located on closed circuits 2 to 2 [ include, activate, and utilize all available ] utilize standard smart 2 inverter technology that allows the inverter to inject and absorb reactive power 2 [ autonomously or in response to remote control ] 2 ;

(3) requiring 2 those 2 energy storage systems 2 that are located on closed circuits 2 to 2 [ include, activate, and utilize all available ] utilize standard smart 2 inverter technology that allows the energy storage system to inject and absorb real and reactive power; 2 and 2

(4) 2 [ requiring solar photovoltaic systems to include, activate, and use technology and services that enable the power output of the system to respond to short-term predictions of weather conditions to control the rate of change of power output or other system parameters; and

(5) ] 2 any additional low-cost and highly actionable 2 [ potential solutions ] non-wires alternatives 2 identified by an electric public utility 2 as a potential means 2 to reopen closed electric distribution circuits to renewable energy installations.

c. No later than 2 [ 120 ] 300 2 days after the effective date of this act, the board shall review and 2 may 2 approve, 1 [ or ] 1 approve with modifications, 1 or disapprove 1 each electric infrastructure improvement plan 2 that the board deems to be complete 2 . As a condition of approval, the board shall require each electric public utility to schedule2 the associated work to be completed at the earliest date possible.:

(1) submit performance metrics and reports to the board, showing whether the implementation of the electric infrastructure improvement plan has resulted in additional distributed energy resource interconnection approvals, including an accounting of all interconnection approvals, the types of distributed energy resource projects that were approved, and the total capacity of distributed energy resource projects that were approved because of the implementation of the plan, and

(2) 2 schedule the associated work to be completed 2 in a reasonable and prudent manner 2 at the earliest date possible.

2. This act shall take effect immediately.