Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

SB 1510Sesión 2026

Department of Environmental Protection

S 1510 c3

El texto subrayado se agregaría a la ley vigente. El texto tachado se eliminaría.

Florida Senate - 2026 CS for CS for CS for SB 1510 By the Committee on Fiscal Policy; the Appropriations Committee on Agriculture, Environment, and General Government; the Committee on Environment and Natural Resources; and Senator Massullo 594-03337-26 20261510c3 1 A bill to be entitled 2 An act relating to the Department of Environmental 3 Protection; amending s. 20.255, F.S.; deleting 4 provisions creating the Environmental Regulation 5 Commission; amending s. 163.3205, F.S.; requiring an 6 applicant for specified permits to incorporate certain 7 additional protections in the development and 8 implementation of an erosion and sediment control plan 9 for the construction of a solar facility; specifying 10 requirements for such plan; specifying requirements 11 for an operational phase stormwater management system 12 serving a solar facility in a specified jurisdiction; 13 providing applicability; requiring an operator of a 14 solar facility or a proposed solar facility to 15 implement specified construction and operational 16 permit requirements; amending s. 259.035, F.S.; 17 expanding the membership of the Acquisition and 18 Restoration Council; providing requirements for 19 membership; defining the term “metropolitan”; 20 requiring the council to administer the Florida 21 Communities Trust; requiring the council to coordinate 22 with the department for rulemaking and grant cycle 23 administration of the trust; conforming provisions to 24 changes made by the act; amending s. 259.105, F.S.; 25 conforming a provision to changes made by the act; 26 amending s. 373.469, F.S.; requiring that residential 27 properties of a specified size located in a certain 28 area connect to a central sewer system or upgrade to a 29 specified type of nutrient-reducing wastewater 30 treatment system; requiring a permitting agency to 31 notify a property owner of such requirement if the 32 agency, before a certain date, receives an application 33 to repair, modify, or replace a conventional onsite 34 sewage treatment and disposal system on certain 35 property; amending s. 373.807, F.S.; authorizing 36 remediation plans for certain properties to have 37 certain requirements related to existing conventional 38 onsite sewage treatment and disposal systems; 39 repealing s. 373.811, F.S., relating to prohibited 40 activities within a basin management action plan; 41 amending s. 380.093, F.S.; revising the definition of 42 the term “community eligible for a reduced cost 43 share”; amending s. 380.502, F.S.; revising 44 legislative findings and intent for the Florida 45 Communities Trust; providing for the transfer of the 46 administration and oversight of the trust from the 47 department to the Acquisition and Restoration Council 48 for a specified purpose; amending s. 380.504, F.S.; 49 deleting provisions relating to the membership, 50 appointments, and organizational structure of the 51 governing body of the trust; providing the purpose of 52 the trust; amending s. 380.507, F.S.; deleting 53 provisions authorizing the trust to make certain 54 loans; revising the powers of the trust; repealing ss. 55 380.512, 380.513, and 380.514, F.S., relating to an 56 annual report, corporate existence, and inconsistent 57 provisions of other laws superseded, respectively; 58 reenacting and amending s. 381.0065, F.S.; authorizing 59 the department to annually review and audit certain 60 inspection and maintenance reports for certain 61 systems; authorizing the department to adopt rules to 62 establish certain procedures; requiring the department 63 to concurrently process operating permits and 64 construction permits under certain circumstances; 65 requiring that an operating permit be obtained before 66 the use of an engineer-designed performance-based 67 system; providing a timeframe for the validity of 68 certain operating permits; requiring an operating 69 permit modification upon certain changes or 70 modifications; providing requirements for subsequent 71 property owners when a property with an onsite sewage 72 treatment and disposal system that requires an 73 operating permit is sold or transferred; providing an 74 exception to certain fees under certain circumstances; 75 requiring an engineer-designed performance-based 76 system maintenance entity to submit a report to the 77 department on a specified basis; deleting a 78 requirement for a property owner to obtain a certain 79 permit from the department for certain onsite sewage 80 treatment and disposal systems; revising the approval 81 criteria for certain onsite sewage treatment and 82 disposal systems; requiring an aerobic treatment unit 83 maintenance entity to submit a report to the 84 department on a specified basis; deleting a 85 requirement that the department contract with or 86 delegate its powers and duties to a county only; 87 amending s. 403.067, F.S.; conforming a provision to 88 changes made by the act; providing a timeframe within 89 which a basin management action plan or plan amendment 90 becomes effective; prohibiting certain activities 91 within a basin management action plan, a reasonable 92 assurance plan, or a pollution reduction plan; making 93 a technical change; amending s. 403.0671, F.S.; 94 conforming a provision to changes made by the act; 95 amending s. 403.0872, F.S.; revising the date by which 96 major permitted sources of air pollution operating in 97 this state must pay an annual operation license fee; 98 authorizing the department to impose penalties if it 99 does not receive such fee by the specified date; 100 deleting provisions relating to costs for 101 administering air pollution construction permits; 102 amending s. 403.1838, F.S.; conforming provisions to 103 changes made by the act; repealing s. 403.804, F.S., 104 relating to the powers and duties of the Environmental 105 Regulation Commission; amending s. 403.892, F.S.; 106 revising applicability of provisions relating to 107 development incentives for the use of graywater 108 technologies; amending ss. 120.81, 373.421, 403.031, 109 403.061, 403.704, 403.707, 403.7222, 403.7234, 110 403.803, 403.805, 403.8055, and 403.814, F.S.; 111 conforming provisions to changes made by the act; 112 amending ss. 376.302 and 380.5105, F.S.; conforming 113 cross-references; reenacting s. 381.0066(2)(k), F.S., 114 relating to onsite sewage treatment and disposal 115 system fees, to incorporate the amendment made to s. 116 381.0065, F.S., in a reference thereto; reenacting s. 117 373.4595, F.S., relating to the Northern Everglades 118 and Estuaries Protection Program, to incorporate the 119 amendment made to s. 403.067, F.S., in a reference 120 thereto; reenacting s. 403.0873, F.S., relating to the 121 Florida Air-Operation License Fee Account, to 122 incorporate the amendment made to s. 403.0872, F.S., 123 in a reference thereto; reenacting s. 403.1835(3)(d), 124 F.S., relating to water pollution control financial 125 assistance, to incorporate the amendment made to s. 126 403.1838, F.S., in a reference thereto; providing an 127 effective date. 128 129 Be It Enacted by the Legislature of the State of Florida: 130 131 Section 1. Subsection (6) of section 20.255, Florida 132 Statutes, is amended to read: 133 20.255 Department of Environmental Protection.—There is 134 created a Department of Environmental Protection. 135 (6) There is created as a part of the Department of 136 Environmental Protection an Environmental Regulation Commission. 137 The commission shall be composed of seven residents of this 138 state appointed by the Governor, subject to confirmation by the 139 Senate. In making appointments, the Governor shall provide 140 reasonable representation from all sections of the state. 141 Membership shall be representative of agriculture, the 142 development industry, local government, the environmental 143 community, lay citizens, and members of the scientific and 144 technical community who have substantial expertise in the areas 145 of the fate and transport of water pollutants, toxicology, 146 epidemiology, geology, biology, environmental sciences, or 147 engineering. The Governor shall appoint the chair, and the vice 148 chair shall be elected from among the membership. All 149 appointments shall be for 4-year terms. The Governor may at any 150 time fill a vacancy for the unexpired term. The members of the 151 commission shall serve without compensation, but shall be paid 152 travel and per diem as provided in s. 112.061 while in the 153 performance of their official duties. Administrative, personnel, 154 and other support services necessary for the commission shall be 155 furnished by the department. The commission may employ 156 independent counsel and contract for the services of outside 157 technical consultants. 158 Section 2. Section 163.3205, Florida Statutes, is amended 159 to read: 160 163.3205 Solar facility approval process; best management 161 practices for stormwater.— 162 (1) LEGISLATIVE INTENT.—It is the intent of the Legislature 163 to encourage renewable solar electrical generation throughout 164 this state. It is essential that solar facilities and associated 165 electric infrastructure be constructed and maintained in various 166 locations throughout this state in order to ensure the 167 availability of renewable energy production, which is critical 168 to this state’s energy and economic future. 169 (2) DEFINITIONS.—As used in this section, the term “solar 170 facility” means a production facility for electric power which: 171 (a) Uses photovoltaic modules to convert solar energy to 172 electricity that may be stored on site, delivered to a 173 transmission system, and consumed primarily offsite. 174 (b) Consists principally of photovoltaic modules, a 175 mounting or racking system, power inverters, transformers, 176 collection systems, battery systems, fire suppression equipment, 177 and associated components. 178 (c) May include accessory administration or maintenance 179 buildings, electric transmission lines, substations, energy 180 storage equipment, and related accessory uses and structures. 181 (3) PERMITTED USE.—A solar facility is shall be a permitted 182 use in all agricultural land use categories in a local 183 government comprehensive plan and all agricultural zoning 184 districts within an unincorporated area and must comply with the 185 setback and landscaped buffer area criteria for other similar 186 uses in the agricultural district. 187 (4) LANDSCAPE REQUIREMENTS.—A county may adopt an ordinance 188 specifying buffer and landscaping requirements for solar 189 facilities. Such requirements may not exceed the requirements 190 for similar uses involving the construction of other facilities 191 that are permitted uses in agricultural land use categories and 192 zoning districts. 193 (5) BEST MANAGEMENT PRACTICES FOR STORMWATER.— 194 (a) An applicant for a permit under s. 373.413 for a 195 stormwater management system related to the construction of a 196 solar facility must incorporate site specific and appropriate 197 additional protections in the development and implementation of 198 an erosion and sediment control (E&SC) plan. Such E&SC plan must 199 include, but not be limited to, all of the following: 200 1. Soil percolation testing on the premises of the proposed 201 solar facility. 202 2. Implementation of stormwater best management practices 203 and related erosion controls for runoff during the construction 204 of the solar facility based on rainfall amounts up to the 100 205 year, 24-hour design storm for the project site. 206 3. Clearing and stabilization in phases as needed to reduce 207 disturbed portions of the project site, which may be susceptible 208 to erosion during construction. 209 4. Inspections performed by a certified Florida Stormwater, 210 Erosion, and Sedimentation Control Inspector during construction 211 to ensure the E&SC plan is implemented in accordance with s. 212 373.413. 213 (b) An operational phase stormwater management system 214 permitted in accordance with s. 373.4145 serving a solar 215 facility within the jurisdictional boundary of the Northwest 216 Florida Water Management District shall be designed based on the 217 100-year, 24-hour design storm for the project site. This 218 provision applies to applications for solar facilities filed 219 after July 1, 2026. 220 (c) An operator of a solar facility or a proposed solar 221 facility shall implement all construction and operational permit 222 requirements as developed and applicable pursuant to paragraph 223 (a). 224 (6) APPLICABILITY.—This section does not apply to any site 225 that was the subject of an application to construct a solar 226 facility submitted to a local governmental entity before July 1, 227 2021. 228 Section 3. Paragraph (a) of subsection (1) and subsections 229 (2), (3), and (5) of section 259.035, Florida Statutes, are 230 amended to read: 231 259.035 Acquisition and Restoration Council.— 232 (1) There is created the Acquisition and Restoration 233 Council. 234 (a) The council shall be composed of 12 10 voting members, 235 6 4 of whom shall be appointed by the Governor. Of these 6 four 236 appointees, 3 must three shall be from scientific disciplines 237 related to land, water, or environmental sciences, 1 must and 238 the fourth shall have at least 5 years of experience in managing 239 lands for both active and passive types of recreation, 1 must be 240 a former elected official of a county, and 1 must be a former 241 elected official of a metropolitan municipality. As used in this 242 paragraph, the term “metropolitan” has the same meaning as in s. 243 380.503. They shall serve 4-year terms, except that, initially, 244 to provide for staggered terms, 2 two of the appointees shall 245 serve 2-year terms. All subsequent appointments shall be for 4 246 year terms. An appointee may not serve more than 6 years. The 247 Governor may at any time fill a vacancy for the unexpired term 248 of a member appointed under this paragraph. 249 (2) The 6 four members of the council appointed pursuant to 250 paragraph (1)(a) (a) and the 2 two members of the council 251 appointed pursuant to paragraph (1)(c) (c) shall receive 252 reimbursement for expenses and per diem for travel, to attend 253 council meetings, as allowed state officers and employees while 254 in the performance of their duties, pursuant to s. 112.061. 255 (3) The council shall: 256 (a) Provide assistance to the board in reviewing the 257 recommendations and plans for state-owned conservation lands 258 required under s. 253.034 and this chapter. The council shall, 259 in reviewing such plans, consider the optimization of multiple 260 use and conservation strategies to accomplish the provisions 261 funded pursuant to former s. 259.101(3)(a), Florida Statutes 262 2014, and to s. 259.105(3)(b). 263 (b) Effective July 1, 2026, administer the Florida 264 Communities Trust established in ss. 380.501–380.515, including 265 reviewing, approving, and overseeing project applications and 266 disbursements, and implementation measures consistent with the 267 trust’s purposes. The council shall coordinate with the 268 department for rulemaking and grant cycle administration for the 269 trust, ensuring alignment with the Florida Forever Act and the 270 state’s conservation priorities. 271 (5) An affirmative vote of 6 five members of the council is 272 required in order to change a project boundary or to place a 273 proposed project on a list developed pursuant to subsection (4). 274 Any member of the council, who by family or a business 275 relationship has a connection with all or a portion of any 276 proposed project, shall declare the interest before voting on 277 its inclusion on a list. 278 Section 4. Paragraph (i) of subsection (4) of section 279 259.105, Florida Statutes, is amended to read: 280 259.105 The Florida Forever Act.— 281 (4) It is the intent of the Legislature that projects or 282 acquisitions funded pursuant to paragraphs (3)(a) and (b) 283 contribute to the achievement of the following goals, which 284 shall be evaluated in accordance with specific criteria and 285 numeric performance measures developed pursuant to s. 286 259.035(4): 287 (i) Mitigate the effects of natural disasters and floods in 288 developed areas, as measured by: 289 1. The number of acres acquired within a 100-year 290 floodplain or a coastal high hazard area; 291 2. The number of acres acquired or developed to serve dual 292 functions as: 293 a. Flow ways or temporary water storage areas during 294 flooding or high water events, not including permanent 295 reservoirs; and 296 b. Greenways or open spaces available to the public for 297 recreation; 298 3. The number of acres that protect existing open spaces 299 and natural buffer areas within a floodplain that also serve as 300 natural flow ways or natural temporary water storage areas; and 301 4. The percentage of the land acquired within the project 302 boundary that creates additional open spaces, natural buffer 303 areas, and greenways within a floodplain, while precluding 304 rebuilding in areas that repeatedly flood. 305 306 Florida Forever projects and acquisitions funded pursuant to 307 paragraph (3)(c) shall be measured by goals developed by rule by 308 the Florida Communities Trust Governing Board created in s. 309 380.504. 310 Section 5. Paragraph (d) of subsection (3) of section 311 373.469, Florida Statutes, is amended to read: 312 373.469 Indian River Lagoon Protection Program.— 313 (3) THE INDIAN RIVER LAGOON PROTECTION PROGRAM.—The Indian 314 River Lagoon Protection Program consists of the Banana River 315 Lagoon Basin Management Action Plan, Central Indian River Lagoon 316 Basin Management Action Plan, North Indian River Lagoon Basin 317 Management Action Plan, and Mosquito Lagoon Reasonable Assurance 318 Plan, and such plans are the components of the Indian River 319 Lagoon Protection Program which achieve phosphorous and nitrogen 320 load reductions for the Indian River Lagoon. 321 (d) Onsite sewage treatment and disposal systems.— 322 1. Beginning on January 1, 2024, unless previously 323 permitted, the installation of new onsite sewage treatment and 324 disposal systems is prohibited within the Banana River Lagoon 325 Basin Management Action Plan, Central Indian River Lagoon Basin 326 Management Action Plan, North Indian River Lagoon Basin 327 Management Action Plan, and Mosquito Lagoon Reasonable Assurance 328 Plan areas where a publicly owned or investor-owned sewerage 329 system is available as defined in s. 381.0065(2)(a). Where 330 central sewerage is not available, only enhanced nutrient 331 reducing onsite sewage treatment and disposal systems or other 332 wastewater treatment systems that achieve at least 65 percent 333 nitrogen reduction are authorized. 334 2. By July 1, 2030, any commercial property or any 335 residential property of 10 acres or less with an existing onsite 336 sewage treatment and disposal system located within the Banana 337 River Lagoon Basin Management Action Plan, Central Indian River 338 Lagoon Basin Management Action Plan, North Indian River Lagoon 339 Basin Management Action Plan, and Mosquito Lagoon Reasonable 340 Assurance Plan areas must connect to central sewer if available 341 or upgrade to an enhanced nutrient-reducing onsite sewage 342 treatment and disposal system or other wastewater treatment 343 system that achieves at least 65 percent nitrogen reduction. For 344 all applications submitted before July 1, 2030, to a permitting 345 agency to repair, modify, or replace a conventional onsite 346 sewage treatment and disposal system on a commercial property or 347 a residential property of 10 acres or less, the permitting 348 agency shall notify the property owner of the requirement 349 provided in this subparagraph. 350 Section 6. Paragraph (a) of subsection (1) of section 351 373.807, Florida Statutes, is amended to read: 352 373.807 Protection of water quality in Outstanding Florida 353 Springs.—By July 1, 2016, the department shall initiate 354 assessment, pursuant to s. 403.067(3), of Outstanding Florida 355 Springs or spring systems for which an impairment determination 356 has not been made under the numeric nutrient standards in effect 357 for spring vents. Assessments must be completed by July 1, 2018. 358 (1)(a) Concurrent with the adoption of a nutrient total 359 maximum daily load for an Outstanding Florida Spring, the 360 department, or the department in conjunction with a water 361 management district, shall initiate development of a basin 362 management action plan, as specified in s. 403.067. For an 363 Outstanding Florida Spring with a nutrient total maximum daily 364 load adopted before July 1, 2016, the department, or the 365 department in conjunction with a water management district, 366 shall initiate development of a basin management action plan by 367 July 1, 2016. During the development of a basin management 368 action plan, if the department identifies onsite sewage 369 treatment and disposal systems as contributors of at least 20 370 percent of nonpoint source nitrogen pollution or if the 371 department determines remediation is necessary to achieve the 372 total maximum daily load, the basin management action plan must 373 shall include an onsite sewage treatment and disposal system 374 remediation plan pursuant to subsection (3) for those systems 375 identified as requiring remediation. For properties 10 acres or 376 less located outside the boundary of an established priority 377 focus area of an Outstanding Florida Spring but within the 378 boundary of a specific springs basin management action plan, 379 such remediation plans may require existing conventional onsite 380 sewage treatment and disposal systems to upgrade to a nutrient 381 reducing onsite sewage treatment and disposal system where 382 central sewerage is not available. Such remediation plan may 383 also require properties of any size located within the boundary 384 of an established priority focus area of an Outstanding Florida 385 Spring to upgrade existing conventional onsite sewage treatment 386 and disposal systems to a nutrient-reducing onsite sewage 387 treatment and disposal system where central sewerage is not 388 available. 389 Section 7. Section 373.811, Florida Statutes, is repealed. 390 Section 8. Paragraph (e) of subsection (5) of section 391 380.093, Florida Statutes, is amended to read: 392 380.093 Resilient Florida Grant Program; comprehensive 393 statewide flood vulnerability and sea level rise data set and 394 assessment; Statewide Flooding and Sea Level Rise Resilience 395 Plan; regional resilience entities.— 396 (5) STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN.— 397 (e) Each project included in the plan must have a minimum 398 50 percent cost share unless the project assists or is within a 399 community eligible for a reduced cost share. For purposes of 400 this section, the term “community eligible for a reduced cost 401 share” means: 402 1. A municipality that has a population of less than 10,000 403 or fewer, according to the most recent April 1 population 404 estimates posted on the Office of Economic and Demographic 405 Research’s website, and a per capita annual income that is less 406 than the state’s per capita annual income as shown in the most 407 recent release from the Bureau of the Census of the United 408 States Department of Commerce that includes both measurements; 409 2. A county that has a population of less than 50,000 or 410 fewer, according to the most recent April 1 population estimates 411 posted on the Office of Economic and Demographic Research’s 412 website, and a per capita annual income that is less than the 413 state’s per capita annual income as shown in the most recent 414 release from the Bureau of the Census of the United States 415 Department of Commerce that includes both measurements; or 416 3. A municipality or county that has a per capita annual 417 income that is equal to or less than 75 percent of the state’s 418 per capita annual income as shown in the most recent release 419 from the Bureau of the Census of the United States Department of 420 Commerce; or 421 4. A municipality or county that is a rural community as 422 defined in s. 288.0656(2). 423 Section 9. Subsection (3) of section 380.502, Florida 424 Statutes, is amended to read: 425 380.502 Legislative findings and intent.— 426 (3) The Legislature further finds that the goals of land 427 conservation and community development are best served through 428 coordinated decisionmaking and streamlined oversight. It is 429 therefore the intent of the Legislature to transfer the 430 administration and oversight of the Florida Communities Trust 431 from the Department of Environmental Protection to the 432 Acquisition and Restoration Council to improve consistency and 433 effectiveness in conservation land acquisition and resource 434 stewardship It is the intent of the Legislature to establish a 435 nonregulatory agency that will assist local governments in 436 bringing local comprehensive plans into compliance and 437 implementing the goals, objectives, and policies of the 438 conservation, recreation and open space, and coastal elements of 439 local comprehensive plans, or in conserving natural resources 440 and resolving land use conflicts by: 441 (a) Responding promptly and creatively to opportunities to 442 correct undesirable development patterns, restore degraded 443 natural areas, enhance resource values, restore deteriorated or 444 deteriorating urban waterfronts, preserve working waterfronts, 445 reserve lands for later purchase, participate in and promote the 446 use of innovative land acquisition methods, and provide public 447 access to surface waters. 448 (b) Providing financial and technical assistance to local 449 governments, state agencies, and nonprofit organizations to 450 carry out projects and activities and to develop programs 451 authorized by this part. 452 (c) Involving local governments and private interests in 453 voluntarily resolving land use conflicts and issues. 454 Section 10. Section 380.504, Florida Statutes, is amended 455 to read: 456 380.504 Florida Communities Trust; creation; membership; 457 expenses.— 458 (1) There is created within the Department of Environmental 459 Protection a nonregulatory state agency and instrumentality, 460 which shall be a public body corporate and politic, known as the 461 “Florida Communities Trust,.” administered by the Acquisition 462 and Restoration Council The governing body of the trust shall 463 consist of: 464 (a) The Secretary of Environmental Protection; and 465 (b) Four public members whom the Governor shall appoint 466 subject to Senate confirmation. 467 468 The Governor shall appoint a former elected official of a county 469 government, a former elected official of a metropolitan 470 municipal government, a representative of a nonprofit 471 organization as defined in this part, and a representative of 472 the development industry. The Secretary of Environmental 473 Protection may appoint his or her deputy secretary, the director 474 of the Division of State Lands, or the director of the Division 475 of Recreation and Parks to serve in his or her absence. The 476 Secretary of Environmental Protection shall be the chair of the 477 governing body of the trust. The Governor shall make his or her 478 appointments upon the expiration of any current terms or within 479 60 days after the effective date of the resignation of any 480 member. 481 (2) The purpose of the trust is to assist local governments 482 in bringing into compliance and implementing the conservation, 483 recreation and open space, and coastal elements of their 484 comprehensive plans or in conserving natural resources and 485 resolving land use conflicts by providing financial assistance 486 to local governments and nonprofit environmental organizations 487 to carry out projects and activities authorized by this part Of 488 the initial governing body members, two of the Governor’s 489 appointees shall serve for a term of 2 years and the remaining 490 one shall serve for a term of 4 years from the date of 491 appointment. Thereafter, governing body members whom the 492 Governor appoints shall serve for terms of 4 years. The Governor 493 may fill any vacancy for an unexpired term. 494 (3) Governing body members shall receive no compensation 495 for their services, but shall be entitled to the necessary 496 expenses, including per diem and travel expenses, incurred in 497 the discharge of their duties pursuant to this part, as provided 498 by law. 499 Section 11. Subsections (6), (7), (9) through (12), and 500 (14) of section 380.507, Florida Statutes, are amended to read: 501 380.507 Powers of the trust.—The trust shall have all the 502 powers necessary or convenient to carry out the purposes and 503 provisions of this part, including: 504 (6) To award grants and make loans to local governments and 505 nonprofit organizations for the purposes listed in subsection 506 (2) and for acquiring fee title and less than fee title, such as 507 conservation easements or other interests in land, for the 508 purposes of this part. 509 (7) To provide by grant or loan up to the total cost of any 510 project approved according to this part, including the local 511 share of federally supported projects. The trust may require 512 local funding participation in projects. The trust shall 513 determine the funding it will provide by considering the total 514 amount of funding available for the project, the fiscal 515 resources of other project participants, the urgency of the 516 project relative to other eligible projects, and other factors 517 which the trust shall have prescribed by rule. The trust may 518 fund up to 100 percent of any local government land acquisition 519 costs, if part of an approved project. 520 (9) To review project recommendations and funding 521 priorities and provide acquisition decisions To invest any funds 522 held in reserves or sinking funds, or any funds not required for 523 immediate disbursement, in such investments as may be authorized 524 for trust funds under s. 215.47, and in any other authorized 525 investments, if such investments are made on behalf of the trust 526 by the State Board of Administration. 527 (10) To contract for and to accept donations gifts, grants, 528 loans, or other aid from the United States Government or any 529 person or corporation, including donations gifts of real 530 property or any interest in real property. 531 (11) To submit project recommendations, funding priorities, 532 and acquisition decisions to the Acquisition and Restoration 533 Council, which shall have final approval authority over trust 534 expenditures and acquisitions to make rules necessary to carry 535 out the purposes of this part and to exercise any power granted 536 in this part, pursuant to chapter 120. The trust shall adopt 537 rules governing the acquisition of lands with proceeds from the 538 Florida Forever Trust Fund, consistent with the intent expressed 539 in the Florida Forever Act. Such rules for land acquisition must 540 include, but are not limited to, procedures for appraisals and 541 confidentiality consistent with ss. 125.355(1)(a) and (b) and 542 166.045(1)(a) and (b), a method of determining a maximum 543 purchase price, and procedures to assure that the land is 544 acquired in a voluntarily negotiated transaction, surveyed, 545 conveyed with marketable title, and examined for hazardous 546 materials contamination. Land acquisition procedures of a local 547 land authority created pursuant to s. 380.0663 may be used for 548 the land acquisition programs described in former s. 549 259.101(3)(c), Florida Statutes 2014, and in s. 259.105 if 550 within areas of critical state concern designated pursuant to s. 551 380.05, subject to approval of the trust. 552 (12) To develop, in conjunction with the council, rules, 553 policies, and guidelines for the administration of the trust 554 consistent with this part and ss. 259.035 and 259.105 to 555 contract with private consultants and nonprofit organizations 556 for professional and technical assistance and advice. 557 (14) To conduct promotional campaigns, including 558 advertising, for the sale of communities trust license plates 559 authorized in s. 320.08058. 560 Section 12. Section 380.512, Florida Statutes, is repealed. 561 Section 13. Section 380.513, Florida Statutes, is repealed. 562 Section 14. Section 380.514, Florida Statutes, is repealed. 563 Section 15. Paragraph (n) of subsection (3) and subsections 564 (4) and (9) of section 381.0065, Florida Statutes, are amended, 565 and subsection (7) of that section is reenacted, to read: 566 381.0065 Onsite sewage treatment and disposal systems; 567 regulation.— 568 (3) DUTIES AND POWERS OF THE DEPARTMENT OF ENVIRONMENTAL 569 PROTECTION.—The department shall: 570 (n) Regulate and permit maintenance entities for 571 performance-based treatment systems and aerobic treatment unit 572 systems. To ensure systems are maintained and operated according 573 to manufacturer’s specifications and designs, the department 574 shall establish by rule minimum qualifying criteria for 575 maintenance entities. The criteria shall include training, 576 access to approved spare parts and components, access to 577 manufacturer’s maintenance and operation manuals, and service 578 response time. The maintenance entity shall employ a contractor 579 licensed under s. 489.105(3)(m), or part III of chapter 489, or 580 a state-licensed wastewater plant operator, who is responsible 581 for maintenance and repair of all systems under contract. The 582 department may annually review and audit up to 25 percent of all 583 inspection and maintenance reports submitted by such maintenance 584 entities for performance-based treatment systems and aerobic 585 treatment unit systems. The department may adopt rules to 586 establish procedures for such audits. 587 (4) PERMITS; INSTALLATION; CONDITIONS.—A person may not 588 construct, repair, modify, abandon, or operate an onsite sewage 589 treatment and disposal system without first obtaining a permit 590 approved by the department. The department may issue permits to 591 carry out this section, except that the issuance of a permit for 592 work seaward of the coastal construction control line 593 established under s. 161.053 shall be contingent upon receipt of 594 any required coastal construction control line permit from the 595 department. A construction permit is valid for 18 months after 596 the date of issuance and may be extended by the department for 597 one 90-day period under rules adopted by the department. A 598 repair permit is valid for 90 days after the date of issuance. 599 When a person jointly applies for a construction permit and an 600 operating permit for the same onsite sewage treatment and 601 disposal system, the department shall concurrently process the 602 operating permit with the construction permit. An operating 603 permit must be obtained before the use of any aerobic treatment 604 unit or engineer-designed performance-based system, or if the 605 establishment generates commercial waste. Buildings or 606 establishments that use an aerobic treatment unit or generate 607 commercial waste shall be inspected by the department at least 608 annually to ensure assure compliance with the terms of the 609 operating permit. The operating permit for a commercial 610 wastewater system is valid for 1 year after the date of issuance 611 and must be renewed annually. The operating permit, where 612 required for a residential onsite sewage treatment and disposal 613 system, is valid for the lifetime of the installation; however, 614 any subsequent change in ownership of the property or any 615 modification of the wastewater system requires an operating 616 permit modification upon such change. When an onsite sewage 617 treatment and disposal system that requires an operating permit 618 is sold or transferred, the subsequent owner with a controlling 619 interest shall provide written notice and proof of ownership to 620 the department to amend the operating permit information within 621 60 days after such property sale or transfer commercial 622 wastewater system is valid for 1 year after the date of issuance 623 and must be renewed annually. The operating permit for an 624 aerobic treatment unit is valid for 2 years after the date of 625 issuance and must be renewed every 2 years. If all information 626 pertaining to the siting, location, and installation conditions 627 or repair of an onsite sewage treatment and disposal system 628 remains the same, a construction or repair permit for the onsite 629 sewage treatment and disposal system may be transferred to 630 another person, if the transferee files, within 60 days after 631 the transfer of ownership, an amended application providing all 632 corrected information and proof of ownership of the property. A 633 fee is not associated with the processing of this supplemental 634 information if only ownership information is updated to reflect 635 a permit transfer for a construction, repair, or an operating 636 permit. A person may not contract to construct, modify, alter, 637 repair, service, abandon, or maintain any portion of an onsite 638 sewage treatment and disposal system without being registered 639 under part III of chapter 489. A property owner who personally 640 performs construction, maintenance, or repairs to a system 641 serving his or her own owner-occupied single-family residence is 642 exempt from registration requirements for performing such 643 construction, maintenance, or repairs on that residence, but is 644 subject to all permitting requirements. A municipality or 645 political subdivision of the state may not issue a building or 646 plumbing permit for any building that requires the use of an 647 onsite sewage treatment and disposal system unless the owner or 648 builder has received a construction permit for such system from 649 the department. A building or structure may not be occupied and 650 a municipality, political subdivision, or any state or federal 651 agency may not authorize occupancy until the department approves 652 the final installation of the onsite sewage treatment and 653 disposal system. A municipality or political subdivision of the 654 state may not approve any change in occupancy or tenancy of a 655 building that uses an onsite sewage treatment and disposal 656 system until the department has reviewed the use of the system 657 with the proposed change, approved the change, and amended the 658 operating permit. 659 (a) Subdivisions and lots in which each lot has a minimum 660 area of at least one-half acre and either a minimum dimension of 661 100 feet or a mean of at least 100 feet of the side bordering 662 the street and the distance formed by a line parallel to the 663 side bordering the street drawn between the two most distant 664 points of the remainder of the lot may be developed with a water 665 system regulated under s. 381.0062 and onsite sewage treatment 666 and disposal systems, provided the projected daily sewage flow 667 does not exceed an average of 1,500 gallons per acre per day, 668 and provided satisfactory drinking water can be obtained and all 669 distance and setback, soil condition, water table elevation, and 670 other related requirements of this section and rules adopted 671 under this section can be met. 672 (b) Subdivisions and lots using a public water system as 673 defined in s. 403.852 may use onsite sewage treatment and 674 disposal systems, provided there are no more than four lots per 675 acre, provided the projected daily sewage flow does not exceed 676 an average of 2,500 gallons per acre per day, and provided that 677 all distance and setback, soil condition, water table elevation, 678 and other related requirements that are generally applicable to 679 the use of onsite sewage treatment and disposal systems are met. 680 (c) Notwithstanding paragraphs (a) and (b), for 681 subdivisions platted of record on or before October 1, 1991, 682 when a developer or other appropriate entity has previously made 683 or makes provisions, including financial assurances or other 684 commitments, acceptable to the department, that a central water 685 system will be installed by a regulated public utility based on 686 a density formula, private potable wells may be used with onsite 687 sewage treatment and disposal systems until the agreed-upon 688 densities are reached. In a subdivision regulated by this 689 paragraph, the average daily sewage flow may not exceed 2,500 690 gallons per acre per day. This section does not affect the 691 validity of existing prior agreements. After October 1, 1991, 692 the exception provided under this paragraph is not available to 693 a developer or other appropriate entity. 694 (d) Paragraphs (a) and (b) do not apply to any proposed 695 residential subdivision with more than 50 lots or to any 696 proposed commercial subdivision with more than 5 lots where a 697 publicly owned or investor-owned sewage treatment system is 698 available. This paragraph does not allow development of 699 additional proposed subdivisions in order to evade the 700 requirements of this paragraph. 701 (e) The department shall adopt rules relating to the 702 location of onsite sewage treatment and disposal systems, 703 including establishing setback distances, to prevent groundwater 704 contamination and surface water contamination and to preserve 705 the public health. The rules must consider conventional and 706 enhanced nutrient-reducing onsite sewage treatment and disposal 707 system designs, impaired or degraded water bodies, domestic 708 wastewater and drinking water infrastructure, potable water 709 sources, nonpotable wells, stormwater infrastructure, the onsite 710 sewage treatment and disposal system remediation plans developed 711 pursuant to s. 403.067(7)(a)9.b., nutrient pollution, and the 712 recommendations of the onsite sewage treatment and disposal 713 systems technical advisory committee established pursuant to 714 former s. 381.00652. The rules must also allow a person to apply 715 for and receive a variance from a rule requirement upon 716 demonstration that the requirement would cause an undue hardship 717 and granting the variance would not cause or contribute to the 718 exceedance of a total maximum daily load. 719 (f) Onsite sewage treatment and disposal systems that are 720 permitted before June 21, 2022, may not be placed closer than: 721 1. Seventy-five feet from a private potable well. 722 2. Two hundred feet from a public potable well serving a 723 residential or nonresidential establishment having a total 724 sewage flow of greater than 2,000 gallons per day. 725 3. One hundred feet from a public potable well serving a 726 residential or nonresidential establishment having a total 727 sewage flow of less than or equal to 2,000 gallons per day. 728 4. Fifty feet from any nonpotable well. 729 5. Ten feet from any storm sewer pipe, to the maximum 730 extent possible, but in no instance shall the setback be less 731 than 5 feet. 732 6. Seventy-five feet from the mean high-water line of a 733 tidally influenced surface water body. 734 7. Seventy-five feet from the mean annual flood line of a 735 permanent nontidal surface water body. 736 8. Fifteen feet from the design high-water line of 737 retention areas, detention areas, or swales designed to contain 738 standing or flowing water for less than 72 hours after a 739 rainfall or the design high-water level of normally dry drainage 740 ditches or normally dry individual lot stormwater retention 741 areas. 742 (g) This section and rules adopted under this section 743 relating to soil condition, water table elevation, distance, and 744 other setback requirements must be equally applied to all lots, 745 with the following exceptions: 746 1. Any residential lot that was platted and recorded on or 747 after January 1, 1972, or that is part of a residential 748 subdivision that was approved by the appropriate permitting 749 agency on or after January 1, 1972, and that was eligible for an 750 onsite sewage treatment and disposal system construction permit 751 on the date of such platting and recording or approval shall be 752 eligible for an onsite sewage treatment and disposal system 753 construction permit, regardless of when the application for a 754 permit is made. If rules in effect at the time the permit 755 application is filed cannot be met, residential lots platted and 756 recorded or approved on or after January 1, 1972, shall, to the 757 maximum extent possible, comply with the rules in effect at the 758 time the permit application is filed. At a minimum, however, 759 those residential lots platted and recorded or approved on or 760 after January 1, 1972, but before January 1, 1983, shall comply 761 with those rules in effect on January 1, 1983, and those 762 residential lots platted and recorded or approved on or after 763 January 1, 1983, shall comply with those rules in effect at the 764 time of such platting and recording or approval. In determining 765 the maximum extent of compliance with current rules that is 766 possible, the department shall allow structures and 767 appurtenances thereto which were authorized at the time such 768 lots were platted and recorded or approved. 769 2. Lots platted before 1972 are subject to a 50-foot 770 minimum surface water setback and are not subject to lot size 771 requirements. The projected daily flow for onsite sewage 772 treatment and disposal systems for lots platted before 1972 may 773 not exceed: 774 a. Two thousand five hundred gallons per acre per day for 775 lots served by public water systems as defined in s. 403.852. 776 b. One thousand five hundred gallons per acre per day for 777 lots served by water systems regulated under s. 381.0062. 778 (h)1. The department may grant variances in hardship cases 779 which may be less restrictive than the provisions specified in 780 this section. If a variance is granted and the onsite sewage 781 treatment and disposal system construction permit has been 782 issued, the variance may be transferred with the system 783 construction permit, if the transferee files, within 60 days 784 after the transfer of ownership, an amended construction permit 785 application providing all corrected information and proof of 786 ownership of the property and if the same variance would have 787 been required for the new owner of the property as was 788 originally granted to the original applicant for the variance. A 789 fee is not associated with the processing of this supplemental 790 information. A variance may not be granted under this section 791 until the department is satisfied that: 792 a. The hardship was not caused intentionally by the action 793 of the applicant; 794 b. A reasonable alternative, taking into consideration 795 factors such as cost, does not exist for the treatment of the 796 sewage; and 797 c. The discharge from the onsite sewage treatment and 798 disposal system will not adversely affect the health of the 799 applicant or the public or significantly degrade the groundwater 800 or surface waters. 801 802 Where soil conditions, water table elevation, and setback 803 provisions are determined by the department to be satisfactory, 804 special consideration must be given to those lots platted before 805 1972. 806 2. The department shall appoint and staff a variance review 807 and advisory committee, which shall meet monthly to recommend 808 agency action on variance requests. The committee shall make its 809 recommendations on variance requests at the meeting in which the 810 application is scheduled for consideration, except for an 811 extraordinary change in circumstances, the receipt of new 812 information that raises new issues, or when the applicant 813 requests an extension. The committee shall consider the criteria 814 in subparagraph 1. in its recommended agency action on variance 815 requests and shall also strive to allow property owners the full 816 use of their land where possible. 817 a. The committee is composed of the following: 818 (I) The Secretary of Environmental Protection or his or her 819 designee. 820 (II) A representative from the county health departments. 821 (III) A representative from the home building industry 822 recommended by the Florida Home Builders Association. 823 (IV) A representative from the septic tank industry 824 recommended by the Florida Onsite Wastewater Association. 825 (V) A representative from the Department of Health. 826 (VI) A representative from the real estate industry who is 827 also a developer in this state who develops lots using onsite 828 sewage treatment and disposal systems, recommended by the 829 Florida Association of Realtors. 830 (VII) A representative from the engineering profession 831 recommended by the Florida Engineering Society. 832 b. Members shall be appointed for a term of 3 years, with 833 such appointments being staggered so that the terms of no more 834 than two members expire in any one year. Members shall serve 835 without remuneration, but if requested, shall be reimbursed for 836 per diem and travel expenses as provided in s. 112.061. 837 3. The variance review and advisory committee is not 838 responsible for reviewing water well permitting. However, the 839 committee shall consider all requirements of law related to 840 onsite sewage treatment and disposal systems when making 841 recommendations on variance requests for onsite sewage treatment 842 and disposal system permits. 843 (i) A construction permit may not be issued for an onsite 844 sewage treatment and disposal system in any area zoned or used 845 for industrial or manufacturing purposes, or its equivalent, 846 where a publicly owned or investor-owned sewage treatment system 847 is available, or where a likelihood exists that the system will 848 receive toxic, hazardous, or industrial waste. An existing 849 onsite sewage treatment and disposal system may be repaired if a 850 publicly owned or investor-owned sewage treatment system is not 851 available within 500 feet of the building sewer stub-out and if 852 system construction and operation standards can be met. This 853 paragraph does not require publicly owned or investor-owned 854 sewage treatment systems to accept anything other than domestic 855 wastewater. 856 1. A building located in an area zoned or used for 857 industrial or manufacturing purposes, or its equivalent, when 858 such building is served by an onsite sewage treatment and 859 disposal system, must not be occupied until the owner or tenant 860 has obtained written approval from the department. The 861 department may not grant approval when the proposed use of the 862 system is to dispose of toxic, hazardous, or industrial 863 wastewater or toxic or hazardous chemicals. 864 2. Each person who owns or operates a business or facility 865 in an area zoned or used for industrial or manufacturing 866 purposes, or its equivalent, or who owns or operates a business 867 that has the potential to generate toxic, hazardous, or 868 industrial wastewater or toxic or hazardous chemicals, and uses 869 an onsite sewage treatment and disposal system that is installed 870 on or after July 5, 1989, must obtain an annual system operating 871 permit from the department. A person who owns or operates a 872 business that uses an onsite sewage treatment and disposal 873 system that was installed and approved before July 5, 1989, does 874 not need to obtain a system operating permit. However, upon 875 change of ownership or tenancy, the new owner or operator must 876 notify the department of the change, and the new owner or 877 operator must obtain an annual system operating permit, 878 regardless of the date that the system was installed or 879 approved. 880 3. The department shall periodically review and evaluate 881 the continued use of onsite sewage treatment and disposal 882 systems in areas zoned or used for industrial or manufacturing 883 purposes, or its equivalent, and may require the collection and 884 analyses of samples from within and around such systems. If the 885 department finds that toxic or hazardous chemicals or toxic, 886 hazardous, or industrial wastewater have been or are being 887 disposed of through an onsite sewage treatment and disposal 888 system, the department shall initiate enforcement actions 889 against the owner or tenant to ensure adequate cleanup, 890 treatment, and disposal. 891 (j) An onsite sewage treatment and disposal system designed 892 by a professional engineer registered in the state and certified 893 by such engineer as complying with performance criteria adopted 894 by the department must be approved by the department subject to 895 the following: 896 1. The performance criteria applicable to engineer-designed 897 systems must be limited to those necessary to ensure that such 898 systems do not adversely affect the public health or 899 significantly degrade the groundwater or surface water. Such 900 performance criteria shall include consideration of the quality 901 of system effluent, the proposed total sewage flow per acre, 902 wastewater treatment capabilities of the natural or replaced 903 soil, water quality classification of the potential surface 904 water-receiving body, and the structural and maintenance 905 viability of the system for the treatment of domestic 906 wastewater. However, performance criteria shall address only the 907 performance of a system and not a system’s design. 908 2. A person electing to use an engineer-designed system 909 shall, upon completion of the system design, submit such design, 910 certified by a registered professional engineer, to the county 911 health department. The county health department may use an 912 outside consultant to review the engineer-designed system, with 913 the actual cost of such review to be borne by the applicant. 914 Within 5 working days after receiving an engineer-designed 915 system permit application, the county health department shall 916 request additional information if the application is not 917 complete. Within 15 working days after receiving a complete 918 application for an engineer-designed system, the county health 919 department shall issue the permit or, if it determines that the 920 system does not comply with the performance criteria, shall 921 notify the applicant of that determination and refer the 922 application to the department for a determination as to whether 923 the system should be approved, disapproved, or approved with 924 modification. The department engineer’s determination shall 925 prevail over the action of the county health department. The 926 applicant shall be notified in writing of the department’s 927 determination and of the applicant’s rights to pursue a variance 928 or seek review under the provisions of chapter 120. 929 3. The owner of an engineer-designed performance-based 930 system must maintain a current maintenance service agreement 931 with a maintenance entity permitted by the department. The 932 maintenance entity shall inspect each system at least twice each 933 year and shall submit an inspection report to the department 934 each time the system is inspected which states report quarterly 935 to the department on the number of systems inspected and 936 serviced. The reports may be submitted electronically. 937 4. The property owner of an owner-occupied, single-family 938 residence may be approved and permitted by the department as a 939 maintenance entity for his or her own performance-based 940 treatment system upon written certification from the system 941 manufacturer’s approved representative that the property owner 942 has received training on the proper installation and service of 943 the system. The maintenance service agreement must conspicuously 944 disclose that the property owner has the right to maintain his 945 or her own system and is exempt from contractor registration 946 requirements for performing construction, maintenance, or 947 repairs on the system but is subject to all permitting 948 requirements. 949 5. The property owner shall obtain a biennial system 950 operating permit from the department for each system. The 951 department may shall inspect the system at least annually, or on 952 such periodic basis as the fee collected permits, and may 953 collect system-effluent samples if appropriate to determine 954 compliance with the performance criteria. The fee for the 955 biennial operating permit must shall be collected beginning with 956 the second year of system operation. 957 6. If an engineer-designed system fails to properly 958 function or fails to meet performance standards, the system must 959 shall be re-engineered, if necessary, to bring the system into 960 compliance with the provisions of this section. 961 (k) An innovative system may be approved in conjunction 962 with an engineer-designed site-specific system that is certified 963 by the engineer to meet the performance-based criteria adopted 964 by the department. 965 (l) For the Florida Keys, the department shall adopt a 966 special rule for the construction, installation, modification, 967 operation, repair, maintenance, and performance of onsite sewage 968 treatment and disposal systems which considers the unique soil 969 conditions and water table elevations, densities, and setback 970 requirements. On lots where a setback distance of 75 feet from 971 surface waters, saltmarsh, and buttonwood association habitat 972 areas cannot be met, an injection well, approved and permitted 973 by the department, may be used for disposal of effluent from 974 onsite sewage treatment and disposal systems. The following 975 additional requirements apply to onsite sewage treatment and 976 disposal systems in Monroe County: 977 1. The county, each municipality, and those special 978 districts established for the purpose of the collection, 979 transmission, treatment, or disposal of sewage shall ensure, in 980 accordance with the specific schedules adopted by the 981 Administration Commission under s. 380.0552, the completion of 982 onsite sewage treatment and disposal system upgrades to meet the 983 requirements of this paragraph. 984 2. Onsite sewage treatment and disposal systems must cease 985 discharge by December 31, 2015, or must comply with department 986 rules and provide the level of treatment which, on a permitted 987 annual average basis, produces an effluent that contains no more 988 than the following concentrations: 989 a. Biochemical Oxygen Demand (CBOD5) of 10 mg/l. 990 b. Suspended Solids of 10 mg/l. 991 c. Total Nitrogen, expressed as N, of 10 mg/l or a 992 reduction in nitrogen of at least 70 percent. A system that has 993 been tested and certified to reduce nitrogen concentrations by 994 at least 70 percent shall be deemed to be in compliance with 995 this standard. 996 d. Total Phosphorus, expressed as P, of 1 mg/l. 997 998 In addition, onsite sewage treatment and disposal systems 999 discharging to an injection well must provide basic disinfection 1000 as defined by department rule. 1001 3. In areas not scheduled to be served by a central 1002 sewerage system, onsite sewage treatment and disposal systems 1003 must, by December 31, 2015, comply with department rules and 1004 provide the level of treatment described in subparagraph 2. 1005 4. In areas scheduled to be served by a central sewerage 1006 system by December 31, 2015, if the property owner has paid a 1007 connection fee or assessment for connection to the central 1008 sewerage system, the property owner may install a holding tank 1009 with a high water alarm or an onsite sewage treatment and 1010 disposal system that meets the following minimum standards: 1011 a. The existing tanks must be pumped and inspected and 1012 certified as being watertight and free of defects in accordance 1013 with department rule; and 1014 b. A sand-lined drainfield or injection well in accordance 1015 with department rule must be installed. 1016 5. Onsite sewage treatment and disposal systems must be 1017 monitored for total nitrogen and total phosphorus concentrations 1018 as required by department rule. 1019 6. The department shall enforce proper installation, 1020 operation, and maintenance of onsite sewage treatment and 1021 disposal systems pursuant to this chapter, including ensuring 1022 that the appropriate level of treatment described in 1023 subparagraph 2. is met. 1024 7. The authority of a local government, including a special 1025 district, to mandate connection of an onsite sewage treatment 1026 and disposal system is governed by s. 4, chapter 99-395, Laws of 1027 Florida. 1028 8. Notwithstanding any other law, an onsite sewage 1029 treatment and disposal system installed after July 1, 2010, in 1030 unincorporated Monroe County, excluding special wastewater 1031 districts, that complies with the standards in subparagraph 2. 1032 is not required to connect to a central sewerage system until 1033 December 31, 2020. 1034 (m) A product sold in the state for use in onsite sewage 1035 treatment and disposal systems may not contain any substance in 1036 concentrations or amounts that would interfere with or prevent 1037 the successful operation of such system, or that would cause 1038 discharges from such systems to violate applicable water quality 1039 standards. The department shall publish criteria for products 1040 known or expected to meet the conditions of this paragraph. If a 1041 product does not meet such criteria, such product may be sold if 1042 the manufacturer satisfactorily demonstrates to the department 1043 that the conditions of this paragraph are met. 1044 (n) Evaluations for determining the seasonal high-water 1045 table elevations or the suitability of soils for the use of a 1046 new onsite sewage treatment and disposal system shall be 1047 performed by department personnel, professional engineers 1048 registered in the state, or such other persons with expertise, 1049 as defined by rule, in making such evaluations. Evaluations for 1050 determining mean annual flood lines shall be performed by those 1051 persons identified in paragraph (2)(l). The department shall 1052 accept evaluations submitted by professional engineers and such 1053 other persons as meet the expertise established by this section 1054 or by rule unless the department has a reasonable scientific 1055 basis for questioning the accuracy or completeness of the 1056 evaluation. 1057 (o) An application for an onsite sewage treatment and 1058 disposal system permit shall be completed in full, signed by the 1059 owner or the owner’s authorized representative, or by a 1060 contractor licensed under chapter 489, and shall be accompanied 1061 by all required exhibits and fees. Specific documentation of 1062 property ownership is not required as a prerequisite to the 1063 review of an application or the issuance of a permit. The 1064 issuance of a permit does not constitute determination by the 1065 department of property ownership. 1066 (p) The department may not require any form of subdivision 1067 analysis of property by an owner, developer, or subdivider 1068 before submission of an application for an onsite sewage 1069 treatment and disposal system. 1070 (q) This section does not limit the power of a municipality 1071 or county to enforce other laws for the protection of the public 1072 health and safety. 1073 (r) In the siting of onsite sewage treatment and disposal 1074 systems, including drainfields, shoulders, and slopes, guttering 1075 may not be required on single-family residential dwelling units 1076 for systems located greater than 5 feet from the roof drip line 1077 of the house. If guttering is used on residential dwelling 1078 units, the downspouts shall be directed away from the 1079 drainfield. 1080 (s) Notwithstanding subparagraph (g)1., onsite sewage 1081 treatment and disposal systems located in floodways of the 1082 Suwannee and Aucilla Rivers must adhere to the following 1083 requirements: 1084 1. The absorption surface of the drainfield may not be 1085 subject to flooding based on 10-year flood elevations. Provided, 1086 however, for lots or parcels created by the subdivision of land 1087 in accordance with applicable local government regulations 1088 before January 17, 1990, if an applicant cannot construct a 1089 drainfield system with the absorption surface of the drainfield 1090 at an elevation equal to or above 10-year flood elevation, the 1091 department shall issue a permit for an onsite sewage treatment 1092 and disposal system within the 10-year floodplain of rivers, 1093 streams, and other bodies of flowing water if all of the 1094 following criteria are met: 1095 a. The lot is at least one-half acre in size; 1096 b. The bottom of the drainfield is at least 36 inches above 1097 the 2-year flood elevation; and 1098 c. The applicant installs a waterless, incinerating, or 1099 organic waste composting toilet and a graywater system and 1100 drainfield in accordance with department rules; an aerobic 1101 treatment unit and drainfield in accordance with department 1102 rules; a system that is capable of reducing effluent nitrate by 1103 at least 50 percent in accordance with department rules; or a 1104 system other than a system using alternative drainfield 1105 materials in accordance with department rules. The United States 1106 Department of Agriculture Soil Conservation Service soil maps, 1107 State of Florida Water Management District data, and Federal 1108 Emergency Management Agency Flood Insurance maps are resources 1109 that shall be used to identify flood-prone areas. 1110 2. The use of fill or mounding to elevate a drainfield 1111 system out of the 10-year floodplain of rivers, streams, or 1112 other bodies of flowing water may not be permitted if such a 1113 system lies within a regulatory floodway of the Suwannee and 1114 Aucilla Rivers. In cases where the 10-year flood elevation does 1115 not coincide with the boundaries of the regulatory floodway, the 1116 regulatory floodway will be considered for the purposes of this 1117 subsection to extend at a minimum to the 10-year flood 1118 elevation. 1119 (t)1. The owner of an aerobic treatment unit system shall 1120 maintain a current maintenance service agreement with an aerobic 1121 treatment unit maintenance entity permitted by the department. 1122 The maintenance entity shall inspect each aerobic treatment unit 1123 system at least twice each year and shall submit an inspection 1124 report to the department each time the system is inspected 1125 stating report quarterly to the department on the number of 1126 aerobic treatment unit systems inspected and serviced. The 1127 reports may be submitted electronically. 1128 2. The property owner of an owner-occupied, single-family 1129 residence may be approved and permitted by the department as a 1130 maintenance entity for his or her own aerobic treatment unit 1131 system upon written certification from the system manufacturer’s 1132 approved representative that the property owner has received 1133 training on the proper installation and service of the system. 1134 The maintenance entity service agreement must conspicuously 1135 disclose that the property owner has the right to maintain his 1136 or her own system and is exempt from contractor registration 1137 requirements for performing construction, maintenance, or 1138 repairs on the system but is subject to all permitting 1139 requirements. 1140 3. A septic tank contractor licensed under part III of 1141 chapter 489, if approved by the manufacturer, may not be denied 1142 access by the manufacturer to aerobic treatment unit system 1143 training or spare parts for maintenance entities. After the 1144 original warranty period, component parts for an aerobic 1145 treatment unit system may be replaced with parts that meet 1146 manufacturer’s specifications but are manufactured by others. 1147 The maintenance entity shall maintain documentation of the 1148 substitute part’s equivalency for 2 years and shall provide such 1149 documentation to the department upon request. 1150 4. The owner of an aerobic treatment unit system shall 1151 obtain a system operating permit from the department and allow 1152 the department to inspect during reasonable hours each aerobic 1153 treatment unit system at least annually, and such inspection may 1154 include collection and analysis of system-effluent samples for 1155 performance criteria established by rule of the department. 1156 (u) The department may require the submission of detailed 1157 system construction plans that are prepared by a professional 1158 engineer registered in this state. The department shall 1159 establish by rule criteria for determining when such a 1160 submission is required. 1161 (v) Any permit issued and approved by the department for 1162 the installation, modification, or repair of an onsite sewage 1163 treatment and disposal system shall transfer with the title to 1164 the property in a real estate transaction. A title may not be 1165 encumbered at the time of transfer by new permit requirements by 1166 a governmental entity for an onsite sewage treatment and 1167 disposal system which differ from the permitting requirements in 1168 effect at the time the system was permitted, modified, or 1169 repaired. An inspection of a system may not be mandated by a 1170 governmental entity at the point of sale in a real estate 1171 transaction. This paragraph does not affect a septic tank phase 1172 out deferral program implemented by a consolidated government as 1173 defined in s. 9, Art. VIII of the State Constitution of 1885. 1174 (w) A governmental entity, including a municipality, 1175 county, or statutorily created commission, may not require an 1176 engineer-designed performance-based treatment system, excluding 1177 a passive engineer-designed performance-based treatment system, 1178 before the completion of the Florida Onsite Sewage Nitrogen 1179 Reduction Strategies Project. This paragraph does not apply to a 1180 governmental entity, including a municipality, county, or 1181 statutorily created commission, which adopted a local law, 1182 ordinance, or regulation on or before January 31, 2012. 1183 Notwithstanding this paragraph, an engineer-designed 1184 performance-based treatment system may be used to meet the 1185 requirements of the variance review and advisory committee 1186 recommendations. 1187 (x)1. An onsite sewage treatment and disposal system is not 1188 considered abandoned if the system is disconnected from a 1189 structure that was made unusable or destroyed following a 1190 disaster and if the system was properly functioning at the time 1191 of disconnection and was not adversely affected by the disaster. 1192 The onsite sewage treatment and disposal system may be 1193 reconnected to a rebuilt structure if: 1194 a. The reconnection of the system is to the same type of 1195 structure which contains the same number of bedrooms or fewer, 1196 if the square footage of the structure is less than or equal to 1197 110 percent of the original square footage of the structure that 1198 existed before the disaster; 1199 b. The system is not a sanitary nuisance; and 1200 c. The system has not been altered without prior 1201 authorization. 1202 2. An onsite sewage treatment and disposal system that 1203 serves a property that is foreclosed upon is not considered 1204 abandoned. 1205 (y) If an onsite sewage treatment and disposal system 1206 permittee receives, relies upon, and undertakes construction of 1207 a system based upon a validly issued construction permit under 1208 rules applicable at the time of construction but a change to a 1209 rule occurs within 5 years after the approval of the system for 1210 construction but before the final approval of the system, the 1211 rules applicable and in effect at the time of construction 1212 approval apply at the time of final approval if fundamental site 1213 conditions have not changed between the time of construction 1214 approval and final approval. 1215 (z) An existing-system inspection or evaluation and 1216 assessment, or a modification, replacement, or upgrade of an 1217 onsite sewage treatment and disposal system is not required for 1218 a remodeling addition or modification to a single-family home if 1219 a bedroom is not added. However, a remodeling addition or 1220 modification to a single-family home may not cover any part of 1221 the existing system or encroach upon a required setback or the 1222 unobstructed area. To determine if a setback or the unobstructed 1223 area is impacted, the local health department shall review and 1224 verify a floor plan and site plan of the proposed remodeling 1225 addition or modification to the home submitted by a remodeler 1226 which shows the location of the system, including the distance 1227 of the remodeling addition or modification to the home from the 1228 onsite sewage treatment and disposal system. The local health 1229 department may visit the site or otherwise determine the best 1230 means of verifying the information submitted. A verification of 1231 the location of a system is not an inspection or evaluation and 1232 assessment of the system. The review and verification must be 1233 completed within 7 business days after receipt by the local 1234 health department of a floor plan and site plan. If the review 1235 and verification is not completed within such time, the 1236 remodeling addition or modification to the single-family home, 1237 for the purposes of this paragraph, is approved. 1238 (7) USE OF ENHANCED NUTRIENT-REDUCING ONSITE SEWAGE 1239 TREATMENT AND DISPOSAL SYSTEMS.—To meet the requirements of a 1240 total maximum daily load, the department shall implement a fast 1241 track approval process of no longer than 6 months for the 1242 determination of the use of American National Standards 1243 Institute 245 systems approved by NSF International before July 1244 1, 2020. The department shall also establish an enhanced 1245 nutrient-reducing onsite sewage treatment and disposal system 1246 approval program that will expeditiously evaluate and approve 1247 such systems for use in this state to comply with ss. 1248 403.067(7)(a)10. and 373.469(3)(d). 1249 (9) CONTRACT OR DELEGATION AUTHORITY.—The department may 1250 contract with or delegate its powers and duties under this 1251 section to a county as provided in s. 403.061 or s. 403.182. 1252 Section 16. Paragraph (c) of subsection (6) and paragraph 1253 (a) of subsection (7) of section 403.067, Florida Statutes, are 1254 amended to read: 1255 403.067 Establishment and implementation of total maximum 1256 daily loads.— 1257 (6) CALCULATION AND ALLOCATION.— 1258 (c) Adoption of rules. The total maximum daily load 1259 calculations and allocations established under this subsection 1260 for each water body or water body segment shall be adopted by 1261 rule by the secretary pursuant to ss. 120.536(1), 120.54, and 1262 403.805. Where additional data collection and analysis are 1263 needed to increase the scientific precision and accuracy of the 1264 total maximum daily load, the department is authorized to adopt 1265 phased total maximum daily loads that are subject to change as 1266 additional data becomes available. Where phased total maximum 1267 daily loads are proposed, the department shall, in the detailed 1268 statement of facts and circumstances justifying the rule, 1269 explain why the data are inadequate so as to justify a phased 1270 total maximum daily load. The rules adopted pursuant to this 1271 paragraph are not subject to approval by the Environmental 1272 Regulation Commission and are not subject to the provisions of 1273 s. 120.541(3). As part of the rule development process, the 1274 department shall hold at least one public workshop in the 1275 vicinity of the water body or water body segment for which the 1276 total maximum daily load is being developed. Notice of the 1277 public workshop shall be published not less than 5 days nor more 1278 than 15 days before the public workshop in a newspaper of 1279 general circulation in the county or counties containing the 1280 water bodies or water body segments for which the total maximum 1281 daily load calculation and allocation are being developed. 1282 (7) DEVELOPMENT OF BASIN MANAGEMENT PLANS AND 1283 IMPLEMENTATION OF TOTAL MAXIMUM DAILY LOADS.— 1284 (a) Basin management action plans.— 1285 1. In developing and implementing the total maximum daily 1286 load for a waterbody, the department, or the department in 1287 conjunction with a water management district, may develop a 1288 basin management action plan that addresses some or all of the 1289 watersheds and basins tributary to the waterbody. Such plan must 1290 integrate the appropriate management strategies available to the 1291 state through existing water quality protection programs to 1292 achieve the total maximum daily loads and may provide for phased 1293 implementation of these management strategies to promote timely, 1294 cost-effective actions as provided for in s. 403.151. The plan 1295 must establish a schedule implementing the management 1296 strategies, establish a basis for evaluating the plan’s 1297 effectiveness, and identify feasible funding strategies for 1298 implementing the plan’s management strategies. The management 1299 strategies may include regional treatment systems or other 1300 public works, when appropriate, and voluntary trading of water 1301 quality credits to achieve the needed pollutant load reductions. 1302 2. A basin management action plan must equitably allocate, 1303 pursuant to paragraph (6)(b), pollutant reductions to individual 1304 basins, as a whole to all basins, or to each identified point 1305 source or category of nonpoint sources, as appropriate. For 1306 nonpoint sources for which best management practices have been 1307 adopted, the initial requirement specified by the plan must be 1308 those practices developed pursuant to paragraph (c). When 1309 appropriate, the plan may take into account the benefits of 1310 pollutant load reduction achieved by point or nonpoint sources 1311 that have implemented management strategies to reduce pollutant 1312 loads, including best management practices, before the 1313 development of the basin management action plan. The plan must 1314 also identify the mechanisms that will address potential future 1315 increases in pollutant loading. 1316 3. The basin management action planning process is intended 1317 to involve the broadest possible range of interested parties, 1318 with the objective of encouraging the greatest amount of 1319 cooperation and consensus possible. In developing a basin 1320 management action plan, the department shall assure that key 1321 stakeholders, including, but not limited to, applicable local 1322 governments, water management districts, the Department of 1323 Agriculture and Consumer Services, other appropriate state 1324 agencies, local soil and water conservation districts, 1325 environmental groups, regulated interests, and affected 1326 pollution sources, are invited to participate in the process. 1327 The department shall hold at least one public meeting in the 1328 vicinity of the watershed or basin to discuss and receive 1329 comments during the planning process and shall otherwise 1330 encourage public participation to the greatest practicable 1331 extent. Notice of the public meeting must be published in a 1332 newspaper of general circulation in each county in which the 1333 watershed or basin lies at least 5 days, but not more than 15 1334 days, before the public meeting. A basin management action plan 1335 does not supplant or otherwise alter any assessment made under 1336 subsection (3) or subsection (4) or any calculation or initial 1337 allocation. 1338 4. Each new or revised basin management action plan must 1339 include all of the following: 1340 a. The appropriate management strategies available through 1341 existing water quality protection programs to achieve total 1342 maximum daily loads, which may provide for phased implementation 1343 to promote timely, cost-effective actions as provided for in s. 1344 403.151. 1345 b. A description of best management practices adopted by 1346 rule. 1347 c. For the applicable 5-year implementation milestone, a 1348 list of projects that will achieve the pollutant load reductions 1349 needed to meet the total maximum daily load or the load 1350 allocations established pursuant to subsection (6). Each project 1351 must include a planning-level cost estimate and an estimated 1352 date of completion. 1353 d. A list of projects developed pursuant to paragraph (e), 1354 if applicable. 1355 e. The source and amount of financial assistance to be made 1356 available by the department, a water management district, or 1357 other entity for each listed project, if applicable. 1358 f. A planning-level estimate of each listed project’s 1359 expected load reduction, if applicable. 1360 5. The department shall adopt all or any part of a basin 1361 management action plan and any amendment to such plan by 1362 secretarial order pursuant to chapter 120 to implement this 1363 section. A basin management action plan and any amendment to 1364 such plan shall become effective 60 days after the date the 1365 secretarial order is filed. 1366 6. The basin management action plan must include 5-year 1367 milestones for implementation and water quality improvement, and 1368 an associated water quality monitoring component sufficient to 1369 evaluate whether reasonable progress in pollutant load 1370 reductions is being achieved over time. An assessment of 1371 progress toward these milestones shall be conducted every 5 1372 years, and revisions to the plan shall be made as appropriate. 1373 Any entity with a specific pollutant load reduction requirement 1374 established in a basin management action plan shall identify the 1375 projects or strategies that such entity will undertake to meet 1376 current 5-year pollution reduction milestones, beginning with 1377 the first 5-year milestone for new basin management action 1378 plans, and submit such projects to the department for inclusion 1379 in the appropriate basin management action plan. Each project 1380 identified must include an estimated amount of nutrient 1381 reduction that is reasonably expected to be achieved based on 1382 the best scientific information available. Revisions to the 1383 basin management action plan shall be made by the department in 1384 cooperation with basin stakeholders. Revisions to the management 1385 strategies required for nonpoint sources must follow the 1386 procedures in subparagraph (c)4. Revised basin management action 1387 plans must be adopted pursuant to subparagraph 5. 1388 7. In accordance with procedures adopted by rule under 1389 paragraph (9)(c), basin management action plans, and other 1390 pollution control programs under local, state, or federal 1391 authority as provided in subsection (4), may allow point or 1392 nonpoint sources that will achieve greater pollutant reductions 1393 than required by an adopted total maximum daily load or 1394 wasteload allocation to generate, register, and trade water 1395 quality credits for the excess reductions to enable other 1396 sources to achieve their allocation; however, the generation of 1397 water quality credits does not remove the obligation of a source 1398 or activity to meet applicable technology requirements or 1399 adopted best management practices. Such plans must allow trading 1400 between NPDES permittees, and trading that may or may not 1401 involve NPDES permittees, where the generation or use of the 1402 credits involve an entity or activity not subject to department 1403 water discharge permits whose owner voluntarily elects to obtain 1404 department authorization for the generation and sale of credits. 1405 8. The department’s rule relating to the equitable 1406 abatement of pollutants into surface waters do not apply to 1407 water bodies or waterbody segments for which a basin management 1408 plan that takes into account future new or expanded activities 1409 or discharges has been adopted under this section. 1410 9. In order to promote resilient wastewater utilities, if 1411 the department identifies domestic wastewater treatment 1412 facilities or onsite sewage treatment and disposal systems as 1413 contributors of at least 20 percent of point source or nonpoint 1414 source nutrient pollution or if the department determines 1415 remediation is necessary to achieve the total maximum daily 1416 load, a basin management action plan for a nutrient total 1417 maximum daily load must include the following: 1418 a. A domestic wastewater treatment plan developed by each 1419 local government, in cooperation with the department, the water 1420 management district, and the public and private domestic 1421 wastewater treatment facilities providing services or located 1422 within the jurisdiction of the local government, which addresses 1423 domestic wastewater. Private domestic wastewater facilities and 1424 special districts providing domestic wastewater services must 1425 provide the required wastewater facility information to the 1426 applicable local governments. The domestic wastewater treatment 1427 plan must: 1428 (I) Provide for construction, expansion, or upgrades 1429 necessary to achieve the total maximum daily load requirements 1430 applicable to the domestic wastewater treatment facility. 1431 (II) Include the permitted capacity in average annual 1432 gallons per day for the domestic wastewater treatment facility; 1433 the average nutrient concentration and the estimated average 1434 nutrient load of the domestic wastewater; a projected timeline 1435 of the dates by which the construction of any facility 1436 improvements will begin and be completed and the date by which 1437 operations of the improved facility will begin; the estimated 1438 cost of the improvements; and the identity of responsible 1439 parties. 1440 1441 The domestic wastewater treatment plan must be adopted as part 1442 of the basin management action plan no later than July 1, 2025. 1443 A local government that does not have a domestic wastewater 1444 treatment facility in its jurisdiction is not required to 1445 develop a domestic wastewater treatment plan unless there is a 1446 demonstrated need to establish a domestic wastewater treatment 1447 facility within its jurisdiction to improve water quality 1448 necessary to achieve a total maximum daily load. A local 1449 government is not responsible for a private domestic wastewater 1450 facility’s compliance with a basin management action plan unless 1451 such facility is operated through a public-private partnership 1452 to which the local government is a party. 1453 b. An onsite sewage treatment and disposal system 1454 remediation plan developed by each local government in 1455 cooperation with the department, the Department of Health, water 1456 management districts, and public and private domestic wastewater 1457 treatment facilities. 1458 (I) The onsite sewage treatment and disposal system 1459 remediation plan must identify cost-effective and financially 1460 feasible projects necessary to achieve the nutrient load 1461 reductions required for onsite sewage treatment and disposal 1462 systems. To identify cost-effective and financially feasible 1463 projects for remediation of onsite sewage treatment and disposal 1464 systems, the local government shall: 1465 (A) Include an inventory of onsite sewage treatment and 1466 disposal systems based on the best information available; 1467 (B) Identify onsite sewage treatment and disposal systems 1468 that would be eliminated through connection to existing or 1469 future central domestic wastewater infrastructure in the 1470 jurisdiction or domestic wastewater service area of the local 1471 government, that would be replaced with or upgraded to enhanced 1472 nutrient-reducing onsite sewage treatment and disposal systems, 1473 or that would remain on conventional onsite sewage treatment and 1474 disposal systems; 1475 (C) Estimate the costs of potential onsite sewage treatment 1476 and disposal system connections, upgrades, or replacements; and 1477 (D) Identify deadlines and interim milestones for the 1478 planning, design, and construction of projects. 1479 (II) The department shall adopt the onsite sewage treatment 1480 and disposal system remediation plan as part of the basin 1481 management action plan no later than July 1, 2025, or as 1482 required for Outstanding Florida Springs under s. 373.807. 1483 10. The following activities are prohibited within a basin 1484 management action plan adopted under this section, a reasonable 1485 assurance plan, or a pollution reduction plan: 1486 a. The installation of new onsite sewage treatment and 1487 disposal systems constructed within a basin management action 1488 plan area adopted under this section, a reasonable assurance 1489 plan, or a pollution reduction plan is prohibited where 1490 connection to a publicly owned or investor-owned sewerage system 1491 is available as defined in s. 381.0065(2)(a). On lots of 1 acre 1492 or less within a basin management action plan adopted under this 1493 section, a reasonable assurance plan, or a pollution reduction 1494 plan where a publicly owned or investor-owned sewerage system is 1495 not available, the installation of enhanced nutrient-reducing 1496 onsite sewage treatment and disposal systems, distributed 1497 wastewater treatment systems as defined in s. 403.814(13), or 1498 other wastewater treatment systems that achieve at least 65 1499 percent nitrogen reduction is required. 1500 b. The construction or installation of new domestic 1501 wastewater disposal facilities, including rapid infiltration 1502 basins, with permitted capacities of 100,000 or more gallons per 1503 day, except for those facilities that meet an advanced 1504 wastewater treatment standard of no more than 3 mg/l total 1505 nitrogen and 1 mg/l total phosphorus on an annual permitted 1506 basis, or a more stringent treatment standard if the department 1507 determines the more stringent standard is necessary to attain a 1508 total maximum daily load. 1509 c. The construction or installation of new facilities for 1510 the disposal of hazardous waste. 1511 11. When identifying wastewater projects in a basin 1512 management action plan, the department may not require the 1513 higher cost option if it achieves the same nutrient load 1514 reduction as a lower cost option. A regulated entity may choose 1515 a different cost option if it complies with the pollutant 1516 reduction requirements of an adopted total maximum daily load 1517 and meets or exceeds the pollution reduction requirement of the 1518 original project. 1519 12. Annually, local governments subject to a basin 1520 management action plan or located within the basin of a 1521 waterbody not attaining nutrient or nutrient-related standards 1522 must provide to the department an update on the status of 1523 construction of sanitary sewers to serve such areas, in a manner 1524 prescribed by the department. 1525 Section 17. Paragraph (e) of subsection (1) of section 1526 403.0671, Florida Statutes, is amended to read: 1527 403.0671 Basin management action plan wastewater reports.— 1528 (1) By July 1, 2021, the department, in coordination with 1529 the county health departments, wastewater treatment facilities, 1530 and other governmental entities, shall submit a report to the 1531 Governor, the President of the Senate, and the Speaker of the 1532 House of Representatives evaluating the costs of wastewater 1533 projects identified in the basin management action plans 1534 developed pursuant to ss. 373.807 and 403.067(7) and the onsite 1535 sewage treatment and disposal system remediation plans and other 1536 restoration plans developed to meet the total maximum daily 1537 loads required under s. 403.067. The report must include all of 1538 the following: 1539 (e) The projected costs of installing enhanced nutrient 1540 reducing onsite sewage treatment and disposal systems on 1541 buildable lots in priority focus areas to comply with s. 1542 373.811. 1543 Section 18. Subsection (11) of section 403.0872, Florida 1544 Statutes, is amended to read: 1545 403.0872 Operation permits for major sources of air 1546 pollution; annual operation license fee.—Provided that program 1547 approval pursuant to 42 U.S.C. s. 7661a has been received from 1548 the United States Environmental Protection Agency, beginning 1549 January 2, 1995, each major source of air pollution, including 1550 electrical power plants certified under s. 403.511, must obtain 1551 from the department an operation permit for a major source of 1552 air pollution under this section. This operation permit is the 1553 only department operation permit for a major source of air 1554 pollution required for such source; provided, at the applicant’s 1555 request, the department shall issue a separate acid rain permit 1556 for a major source of air pollution that is an affected source 1557 within the meaning of 42 U.S.C. s. 7651a(1). Operation permits 1558 for major sources of air pollution, except general permits 1559 issued pursuant to s. 403.814, must be issued in accordance with 1560 the procedures contained in this section and in accordance with 1561 chapter 120; however, to the extent that chapter 120 is 1562 inconsistent with this section, the procedures contained in this 1563 section prevail. 1564 (11) Each major source of air pollution permitted to 1565 operate in this state must pay by June 30 between January 15 and 1566 April 1 of each year, upon written notice from the department, 1567 an annual operation license fee in an amount determined by 1568 department rule. The annual operation license fee shall be 1569 terminated immediately in the event the United States 1570 Environmental Protection Agency imposes annual fees solely to 1571 implement and administer the major source air-operation permit 1572 program in Florida under 40 C.F.R. s. 70.10(d). 1573 (a) The annual fee must be assessed based upon the source’s 1574 previous year’s emissions and must be calculated by multiplying 1575 the applicable annual operation license fee factor times the 1576 tons of each regulated air pollutant actually emitted, as 1577 calculated in accordance with the department’s emissions 1578 computation and reporting rules. The annual fee shall only apply 1579 to those regulated pollutants, except carbon monoxide and 1580 greenhouse gases, for which an allowable numeric emission 1581 limiting standard is specified in the source’s most recent 1582 construction or operation permit; provided, however, that: 1583 1. The license fee factor is $25 or another amount 1584 determined by department rule which ensures that the revenue 1585 provided by each year’s operation license fees is sufficient to 1586 cover all reasonable direct and indirect costs of the major 1587 stationary source air-operation permit program established by 1588 this section. The license fee factor may be increased beyond $25 1589 only if the secretary of the department affirmatively finds that 1590 a shortage of revenue for support of the major stationary source 1591 air-operation permit program will occur in the absence of a fee 1592 factor adjustment. The annual license fee factor may never 1593 exceed $35. 1594 2. The amount of each regulated air pollutant in excess of 1595 4,000 tons per year emitted by any source, or group of sources 1596 belonging to the same Major Group as described in the Standard 1597 Industrial Classification Manual, 1987, may not be included in 1598 the calculation of the fee. Any source, or group of sources, 1599 which does not emit any regulated air pollutant in excess of 1600 4,000 tons per year, is allowed a one-time credit not to exceed 1601 25 percent of the first annual licensing fee for the prorated 1602 portion of existing air-operation permit application fees 1603 remaining upon commencement of the annual licensing fees. 1604 3. If the department has not received the fee by March 1 of 1605 the calendar year, the permittee must be sent a written warning 1606 of the consequences for failing to pay the fee by April 1. If 1607 the fee is not postmarked by June 30 April 1 of the calendar 1608 year, the department shall impose, in addition to the fee, a 1609 penalty of 50 percent of the amount of the fee, plus interest on 1610 such amount computed in accordance with s. 220.807. The 1611 department may not impose such penalty or interest on any amount 1612 underpaid, provided that the permittee has timely remitted 1613 payment of at least 90 percent of the amount determined to be 1614 due and remits full payment within 60 days after receipt of 1615 notice of the amount underpaid. The department may waive the 1616 collection of underpayment and may not be required to refund 1617 overpayment of the fee, if the amount due is less than 1 percent 1618 of the fee, up to $50. The department may revoke any major air 1619 pollution source operation permit if it finds that the 1620 permitholder has failed to timely pay any required annual 1621 operation license fee, penalty, or interest. 1622 4. Notwithstanding the computational provisions of this 1623 subsection, the annual operation license fee for any source 1624 subject to this section may not be less than $250, except that 1625 the annual operation license fee for sources permitted solely 1626 through general permits issued under s. 403.814 may not exceed 1627 $50 per year. 1628 5. Notwithstanding s. 403.087(7)(a)5.a., which authorizes 1629 air pollution construction permit fees, the department may not 1630 require such fees for changes or additions to a major source of 1631 air pollution permitted pursuant to this section, unless the 1632 activity triggers permitting requirements under Title I, Part C 1633 or Part D, of the federal Clean Air Act, 42 U.S.C. ss. 7470 1634 7514a. Costs to issue and administer such permits shall be 1635 considered direct and indirect costs of the major stationary 1636 source air-operation permit program under s. 403.0873. The 1637 department shall, however, require fees pursuant to s. 1638 403.087(7)(a)5.a. for the construction of a new major source of 1639 air pollution that will be subject to the permitting 1640 requirements of this section once constructed and for activities 1641 triggering permitting requirements under Title I, Part C or Part 1642 D, of the federal Clean Air Act, 42 U.S.C. ss. 7470-7514a. 1643 (b) Annual operation license fees collected by the 1644 department must be sufficient to cover all reasonable direct and 1645 indirect costs required to develop and administer the major 1646 stationary source air-operation permit program, which shall 1647 consist of the following elements to the extent that they are 1648 reasonably related to the regulation of major stationary air 1649 pollution sources, in accordance with United States 1650 Environmental Protection Agency regulations and guidelines: 1651 1. Reviewing and acting upon any application for such a 1652 permit. 1653 2. Implementing and enforcing the terms and conditions of 1654 any such permit, excluding court costs or other costs associated 1655 with any enforcement action. 1656 3. Emissions and ambient monitoring. 1657 4. Preparing generally applicable regulations or guidance. 1658 5. Modeling, analyses, and demonstrations. 1659 6. Preparing inventories and tracking emissions. 1660 7. Implementing the Small Business Stationary Source 1661 Technical and Environmental Compliance Assistance Program. 1662 8. Any audits conducted under paragraph (c). 1663 (c) An audit of the major stationary source air-operation 1664 permit program must be conducted 2 years after the United States 1665 Environmental Protection Agency has given full approval of the 1666 program to ascertain whether the annual operation license fees 1667 collected by the department are used solely to support any 1668 reasonable direct and indirect costs as listed in paragraph (b). 1669 A program audit must be performed biennially after the first 1670 audit. 1671 Section 19. Paragraphs (a) and (b) of subsection (3) of 1672 section 403.1838, Florida Statutes, are amended to read: 1673 403.1838 Small Community Sewer Construction Assistance 1674 Act.— 1675 (3)(a) In accordance with rules adopted by the department 1676 Environmental Regulation Commission under this section, the 1677 department may provide grants, from funds specifically 1678 appropriated for this purpose, to financially disadvantaged 1679 small communities for up to 100 percent of the costs of 1680 planning, designing, constructing, upgrading, or replacing 1681 wastewater collection, transmission, treatment, disposal, and 1682 reuse facilities, including necessary legal and administrative 1683 expenses. 1684 (b) The rules of the department Environmental Regulation 1685 Commission must: 1686 1. Require that projects to plan, design, construct, 1687 upgrade, or replace wastewater collection, transmission, 1688 treatment, disposal, and reuse facilities be cost-effective, 1689 environmentally sound, permittable, and implementable. 1690 2. Require appropriate user charges, connection fees, and 1691 other charges sufficient to ensure the long-term operation, 1692 maintenance, and replacement of the facilities constructed under 1693 each grant. 1694 3. Require grant applications to be submitted on 1695 appropriate forms with appropriate supporting documentation, and 1696 require records to be maintained. 1697 4. Establish a system to determine eligibility of grant 1698 applications. 1699 5. Establish a system to determine the relative priority of 1700 grant applications. The system must consider public health 1701 protection and water pollution prevention or abatement and must 1702 prioritize projects that plan for the installation of wastewater 1703 transmission facilities to be constructed concurrently with 1704 other construction projects occurring within or along a 1705 transportation facility right-of-way. 1706 6. Establish requirements for competitive procurement of 1707 engineering and construction services, materials, and equipment. 1708 7. Provide for termination of grants when program 1709 requirements are not met. 1710 Section 20. Section 403.804, Florida Statutes, is repealed. 1711 Section 21. Subsection (6) of section 403.892, Florida 1712 Statutes, is amended to read: 1713 403.892 Incentives for the use of graywater technologies.— 1714 (6) This section does not apply to multifamily projects 1715 with a building height greater than the maximum height allowed 1716 under s. 125.01055 or s. 166.04151 more than five stories in 1717 height. Whether a dwelling is occupied by an owner is not an 1718 eligibility criterion for a developer or homebuilder to receive 1719 the incentives authorized under this section. 1720 Section 22. Subsection (6) of section 120.81, Florida 1721 Statutes, is amended to read: 1722 120.81 Exceptions and special requirements; general areas.— 1723 (6) RISK IMPACT STATEMENT.—The Department of Environmental 1724 Protection shall prepare a risk impact statement for any rule 1725 that is proposed for adoption which approval by the 1726 Environmental Regulation Commission and that establishes or 1727 changes standards or criteria based on impacts to or effects 1728 upon human health. The Department of Agriculture and Consumer 1729 Services shall prepare a risk impact statement for any rule that 1730 is proposed for adoption that establishes standards or criteria 1731 based on impacts to or effects upon human health. 1732 (a) This subsection does not apply to rules adopted 1733 pursuant to federally delegated or mandated programs where such 1734 rules are identical or substantially identical to the federal 1735 regulations or laws being adopted or implemented by the 1736 Department of Environmental Protection or Department of 1737 Agriculture and Consumer Services, as applicable. However, the 1738 Department of Environmental Protection and the Department of 1739 Agriculture and Consumer Services shall identify any risk 1740 analysis information available to them from the Federal 1741 Government that has formed the basis of such a rule. 1742 (b) This subsection does not apply to emergency rules 1743 adopted pursuant to this chapter. 1744 (c) The Department of Environmental Protection and the 1745 Department of Agriculture and Consumer Services shall prepare 1746 and publish notice of the availability of a clear and concise 1747 risk impact statement for all applicable rules. The risk impact 1748 statement must explain the risk to the public health addressed 1749 by the rule and shall identify and summarize the source of the 1750 scientific information used in evaluating that risk. 1751 (d) Nothing in this subsection shall be construed to create 1752 a new cause of action or basis for challenging a rule nor 1753 diminish any existing cause of action or basis for challenging a 1754 rule. 1755 Section 23. Subsection (1) of section 373.421, Florida 1756 Statutes, is amended, and paragraph (b) of subsection (7) of 1757 that section is reenacted, to read: 1758 373.421 Delineation methods; formal determinations.— 1759 (1) The department’s Environmental Regulation Commission 1760 shall adopt a unified statewide methodology for the delineation 1761 of the extent of wetlands as defined in s. 373.019(27).This 1762 methodology shall consider regional differences in the types of 1763 soils and vegetation that may serve as indicators of the extent 1764 of wetlands. This methodology shall also include provisions for 1765 determining the extent of surface waters other than wetlands for 1766 the purposes of regulation under s. 373.414. This methodology 1767 shall not become effective until ratified by the Legislature. 1768 Subsequent to legislative ratification, the wetland definition 1769 in s. 373.019(27) and the adopted wetland methodology shall be 1770 binding on the department, the water management districts, local 1771 governments, and any other governmental entities. Upon 1772 ratification of such wetland methodology, the Legislature 1773 preempts the authority of any water management district, state 1774 or regional agency, or local government to define wetlands or 1775 develop a delineation methodology to implement the definition 1776 and determines that the exclusive definition and delineation 1777 methodology for wetlands shall be that established pursuant to 1778 s. 373.019(27) and this section. Upon such legislative 1779 ratification, any existing wetlands definition or wetland 1780 delineation methodology shall be superseded by the wetland 1781 definition and delineation methodology established pursuant to 1782 this chapter. Subsequent to legislative ratification, a 1783 delineation of the extent of a surface water or wetland by the 1784 department or a water management district, pursuant to a formal 1785 determination under subsection (2), or pursuant to a permit 1786 issued under this part in which the delineation was field 1787 verified by the permitting agency and specifically approved in 1788 the permit, shall be binding on all other governmental entities 1789 for the duration of the formal determination or permit. All 1790 existing rules and methodologies of the department, the water 1791 management districts, and local governments, regarding surface 1792 water or wetland definition and delineation shall remain in full 1793 force and effect until the common methodology rule becomes 1794 effective. However, this shall not be construed to limit any 1795 power of the department, the water management districts, and 1796 local governments to amend or adopt a surface water or wetland 1797 definition or delineation methodology until the common 1798 methodology rule becomes effective. 1799 (7) 1800 (b) Wetlands contiguous to surface waters of the state as 1801 defined in s. 403.031(13), Florida Statutes (1991), shall be 1802 delineated pursuant to the department’s rules as such rules 1803 existed prior to January 24, 1984, while wetlands not contiguous 1804 to surface waters of the state as defined in s. 403.031(13), 1805 Florida Statutes (1991), shall be delineated pursuant to the 1806 applicable methodology ratified by s. 373.4211 for any 1807 development which obtains an individual permit from the United 1808 States Army Corps of Engineers under 33 U.S.C. s. 1344: 1809 1. Where a jurisdictional determination validated by the 1810 department pursuant to rule 17-301.400(8), Florida 1811 Administrative Code, as it existed in rule 17-4.022, Florida 1812 Administrative Code, on April 1, 1985, is revalidated pursuant 1813 to s. 373.414(13) and the affected lands are part of a project 1814 for which a vested rights determination has been issued pursuant 1815 to s. 380.06, or 1816 2. Where the lands affected were grandfathered pursuant to 1817 s. 403.913(6), Florida Statutes (1991), and proof of prior 1818 notification pursuant to s. 403.913(6), Florida Statutes (1991), 1819 is submitted to the department within 180 days of the 1820 publication of a notice by the department of the existence of 1821 this provision. Failure to timely submit the proof of prior 1822 notification to the department serves as a waiver of the 1823 benefits conferred by this subsection. 1824 3. This subsection shall not be applicable to lands: 1825 a. Within the geographical area to which an individual or 1826 general permit issued prior to June 1, 1994, under rules adopted 1827 pursuant to this part applies; or 1828 b. Within the geographical area to which a conceptual 1829 permit issued prior to June 1, 1994, under rules adopted 1830 pursuant to this part applies if wetland delineations were 1831 identified and approved by the conceptual permit as set forth in 1832 s. 373.414(12)(b)1. or 2.; or 1833 c. Where no development activity as defined in s. 380.01(1) 1834 or (2)(a)-(d) and (f) has occurred within the project boundaries 1835 since October 1, 1986; or 1836 d. Of a project which is not in compliance with this part 1837 or the rules adopted pursuant to ss. 403.91-403.929, 1984 1838 Supplement to the Florida Statutes 1983, as amended. 1839 4. The wetland delineation methodology required in this 1840 subsection shall only apply within the geographical area of an 1841 individual permit issued by the United States Army Corps of 1842 Engineers under 33 U.S.C. s. 1344. The requirement to obtain 1843 such individual permit to secure the benefit of this subsection 1844 shall not apply to any activities exempt or not subject to 1845 regulation under 33 U.S.C. s. 1344. 1846 5. Notwithstanding subsection (1), the wetland delineation 1847 methodology required in this subsection and any wetland 1848 delineation pursuant thereto, shall only apply to agency action 1849 under this part and shall not be binding on local governments 1850 except in their implementation of this part. 1851 Section 24. Paragraph (b) of subsection (23) of section 1852 403.031, Florida Statutes, is amended to read: 1853 403.031 Definitions.—In construing this chapter, or rules 1854 and regulations adopted pursuant hereto, the following words, 1855 phrases, or terms, unless the context otherwise indicates, have 1856 the following meanings: 1857 (23) “Waters” include, but are not limited to, rivers, 1858 lakes, streams, springs, impoundments, wetlands, and all other 1859 waters or bodies of water, including fresh, brackish, saline, 1860 tidal, surface, or underground waters. Waters owned entirely by 1861 one person other than the state are included only in regard to 1862 possible discharge on other property or water. Underground 1863 waters include, but are not limited to, all underground waters 1864 passing through pores of rock or soils or flowing through in 1865 channels, whether manmade or natural. Solely for purposes of s. 1866 403.0885, waters of the state also include navigable waters or 1867 waters of the contiguous zone as used in s. 502 of the Clean 1868 Water Act, as amended, 33 U.S.C. ss. 1251 et seq., as in 1869 existence on January 1, 1993, except for those navigable waters 1870 seaward of the boundaries of the state set forth in s. 1, Art. 1871 II of the State Constitution. Solely for purposes of this 1872 chapter, waters of the state also include the area bounded by 1873 the following: 1874 (b) The area bounded by the line described in paragraph (a) 1875 generally includes those waters to be known as waters of the 1876 state. The landward extent of these waters shall be determined 1877 by the delineation methodology ratified in s. 373.4211. Any 1878 waters which are outside the general boundary line described in 1879 paragraph (a) but which are contiguous thereto by virtue of the 1880 presence of a wetland, watercourse, or other surface water, as 1881 determined by the delineation methodology ratified in s. 1882 373.4211, shall be a part of this waterbody. Any areas within 1883 the line described in paragraph (a) which are neither a wetland 1884 nor surface water, as determined by the delineation methodology 1885 ratified in s. 373.4211, shall be excluded therefrom. If the 1886 Florida Environmental Regulation Commission designates the 1887 waters within the boundaries an Outstanding Florida Water, 1888 waters outside the boundaries may not be included as part of 1889 such designation unless a hearing is held pursuant to notice in 1890 each appropriate county and the boundaries of such lands are 1891 specifically considered and described for such designation. 1892 Section 25. Subsections (7) and (32) of section 403.061, 1893 Florida Statutes, are amended to read: 1894 403.061 Department; powers and duties.—The department shall 1895 have the power and the duty to control and prohibit pollution of 1896 air and water in accordance with the law and rules adopted and 1897 promulgated by it and, for this purpose, to: 1898 (7) Adopt rules pursuant to ss. 120.536(1) and 120.54 to 1899 implement this act. Any rule adopted pursuant to this act must 1900 be consistent with the provisions of federal law, if any, 1901 relating to control of emissions from motor vehicles, effluent 1902 limitations, pretreatment requirements, or standards of 1903 performance. A county, municipality, or political subdivision 1904 may not adopt or enforce any local ordinance, special law, or 1905 local regulation requiring the installation of Stage II vapor 1906 recovery systems, as currently defined by department rule, 1907 unless such county, municipality, or political subdivision is or 1908 has been in the past designated by federal regulation as a 1909 moderate, serious, or severe ozone nonattainment area. Rules 1910 adopted pursuant to this act may not require dischargers of 1911 waste into waters of the state to improve natural background 1912 conditions. The department shall adopt rules to reasonably 1913 limit, reduce, and eliminate domestic wastewater collection and 1914 transmission system pipe leakages and inflow and infiltration. 1915 Discharges from steam electric generating plants existing or 1916 licensed under this chapter on July 1, 1984, may not be required 1917 to be treated to a greater extent than may be necessary to 1918 assure that the quality of nonthermal components of discharges 1919 from nonrecirculated cooling water systems is as high as the 1920 quality of the makeup waters; that the quality of nonthermal 1921 components of discharges from recirculated cooling water systems 1922 is no lower than is allowed for blowdown from such systems; or 1923 that the quality of noncooling system discharges which receive 1924 makeup water from a receiving body of water which does not meet 1925 applicable department water quality standards is as high as the 1926 quality of the receiving body of water. The department may not 1927 adopt standards more stringent than federal regulations, except 1928 as provided in s. 403.804. 1929 (32) Adopt rules necessary to obtain approval from the 1930 United States Environmental Protection Agency to administer the 1931 Federal National Pollution Discharge Elimination System (NPDES) 1932 permitting program in Florida under ss. 318, 402, and 405 of the 1933 federal Clean Water Act, Pub. L. No. 92-500, as amended. This 1934 authority shall be implemented consistent with the provisions of 1935 part II, which shall be applicable to facilities certified 1936 thereunder. The department shall establish all rules, standards, 1937 and requirements that regulate the discharge of pollutants into 1938 waters of the United States as defined by and in a manner 1939 consistent with federal regulations; provided, however, that the 1940 department may adopt a standard that is stricter or more 1941 stringent than one set by the United States Environmental 1942 Protection Agency if approved by the Governor and Cabinet in 1943 accordance with the procedures of s. 403.804(2). 1944 1945 The department shall implement such programs in conjunction with 1946 its other powers and duties and shall place special emphasis on 1947 reducing and eliminating contamination that presents a threat to 1948 humans, animals or plants, or to the environment. 1949 Section 26. Subsection (9) of section 403.704, Florida 1950 Statutes, is amended to read: 1951 403.704 Powers and duties of the department.—The department 1952 shall have responsibility for the implementation and enforcement 1953 of this act. In addition to other powers and duties, the 1954 department shall: 1955 (9) Adopt rules pursuant to ss. 120.536(1) and 120.54 to 1956 implement and enforce this act, including requirements for the 1957 classification, construction, operation, maintenance, and 1958 closure of solid waste management facilities and requirements 1959 for, and conditions on, solid waste disposal in this state, 1960 whether such solid waste is generated within this state or 1961 outside this state as long as such requirements and conditions 1962 are not based on the out-of-state origin of the waste and are 1963 consistent with applicable law. When classifying solid waste 1964 management facilities, the department shall consider the 1965 hydrogeology of the site for the facility, the types of wastes 1966 to be handled by the facility, and methods used to control the 1967 types of waste to be handled by the facility and shall seek to 1968 minimize the adverse effects of solid waste management on the 1969 environment. Whenever the department adopts any rule stricter or 1970 more stringent than one that has been set by the United States 1971 Environmental Protection Agency, the procedures set forth in s. 1972 403.804(2) shall be followed. The department may shall not, 1973 however, adopt hazardous waste rules for solid waste for which 1974 special studies were required before prior to October 1, 1988, 1975 under s. 8002 of the Resource Conservation and Recovery Act, 42 1976 U.S.C. s. 6982, as amended, until the studies are completed by 1977 the United States Environmental Protection Agency and the 1978 information is available to the department for consideration in 1979 adopting its own rule. 1980 Section 27. Paragraph (d) of subsection (3) and paragraph 1981 (h) of subsection (9) of section 403.707, Florida Statutes, are 1982 amended to read: 1983 403.707 Permits.— 1984 (3) 1985 (d) The department may adopt rules to administer this 1986 subsection. However, the department is not required to submit 1987 such rules to the Environmental Regulation Commission for 1988 approval. Notwithstanding the limitations of s. 403.087(7)(a), 1989 permit fee caps for solid waste management facilities must shall 1990 be prorated to reflect the extended permit term authorized by 1991 this subsection. 1992 (9) The department shall establish a separate category for 1993 solid waste management facilities that accept only construction 1994 and demolition debris for disposal or recycling. The department 1995 shall establish a reasonable schedule for existing facilities to 1996 comply with this section to avoid undue hardship to such 1997 facilities. However, a permitted solid waste disposal unit that 1998 receives a significant amount of waste prior to the compliance 1999 deadline established in this schedule shall not be required to 2000 be retrofitted with liners or leachate control systems. 2001 (h) The department shall ensure that the requirements of 2002 this section are applied and interpreted consistently throughout 2003 this the state. In accordance with s. 20.255, The Division of 2004 Waste Management shall direct the district offices and bureaus 2005 on matters relating to the interpretation and applicability of 2006 this section. 2007 Section 28. Subsection (3) of section 403.7222, Florida 2008 Statutes, is amended to read: 2009 403.7222 Prohibition of hazardous waste landfills.— 2010 (3) This section does not prohibit the department from 2011 banning the disposal of hazardous waste in other types of waste 2012 management units in a manner consistent with federal 2013 requirements, except as provided under s. 403.804(2). 2014 Section 29. Subsection (4) of section 403.7234, Florida 2015 Statutes, is amended to read: 2016 403.7234 Small quantity generator notification and 2017 verification program.— 2018 (4) Within 30 days of receipt of a notification, which 2019 includes a survey form, a small quantity generator shall 2020 disclose its management practices and the types and quantities 2021 of waste to the county government. Annually, each county shall 2022 verify the management practices of at least 20 percent of its 2023 small quantity generators. The procedure for verification used 2024 by the county must shall be developed as part of the guidance 2025 established by the department under s. 403.7226. The department 2026 may also regulate the waste management practices of small 2027 quantity generators in order to ensure proper management of 2028 hazardous waste in a manner consistent with federal 2029 requirements, except as provided under s. 403.804(2). 2030 Section 30. Section 403.803, Florida Statutes, is amended 2031 to read: 2032 403.803 Definitions.—When used in this part act, the term, 2033 phrase, or word: 2034 (1) “Branch office” means a geographical area, the 2035 boundaries of which may be established as a part of a district. 2036 (2) “Canal” is a manmade trench, the bottom of which is 2037 normally covered by water with the upper edges of its sides 2038 normally above water. 2039 (3) “Channel” is a trench, the bottom of which is normally 2040 covered entirely by water, with the upper edges of its sides 2041 normally below water. 2042 (4) “Commission” means the Environmental Regulation 2043 Commission. 2044 (5) “Department” means the Department of Environmental 2045 Protection. 2046 (5)(6) “District” or “environmental district” means one of 2047 the geographical areas, the boundaries of which are established 2048 pursuant to this act. 2049 (6)(7) “Drainage ditch” or “irrigation ditch” is a manmade 2050 trench dug for the purpose of draining water from the land or 2051 for transporting water for use on the land and is not built for 2052 navigational purposes. 2053 (7)(8) “Environmental district center” means the facilities 2054 and personnel which are centralized in each district for the 2055 purposes of carrying out the provisions of this act. 2056 (8)(9) “Headquarters” means the physical location of the 2057 offices of the secretary and the division directors of the 2058 department. 2059 (9)(10) “Insect control impoundment dikes” means artificial 2060 structures, including earthen berms, constructed and used to 2061 impound waters for the purpose of insect control. 2062 (10)(11) “Manager” means the head of an environmental 2063 district or branch office who shall supervise all environmental 2064 functions of the department within such environmental district 2065 or branch office. 2066 (11)(12) “Secretary” means the Secretary of Environmental 2067 Protection. 2068 (12)(13) “Standard” means any rule of the Department of 2069 Environmental Protection relating to air and water quality, 2070 noise, solid-waste management, and electric and magnetic fields 2071 associated with electrical transmission and distribution lines 2072 and substation facilities. The term “standard” does not include 2073 rules of the department which relate exclusively to the internal 2074 management of the department, the procedural processing of 2075 applications, the administration of rulemaking or adjudicatory 2076 proceedings, the publication of notices, the conduct of 2077 hearings, or other procedural matters. 2078 (13)(14) “Swale” means a manmade trench which: 2079 (a) Has a top width-to-depth ratio of the cross-section 2080 equal to or greater than 6:1, or side slopes equal to or greater 2081 than 3 feet horizontal to 1 foot vertical; 2082 (b) Contains contiguous areas of standing or flowing water 2083 only following a rainfall event; 2084 (c) Is planted with or has stabilized vegetation suitable 2085 for soil stabilization, stormwater treatment, and nutrient 2086 uptake; and 2087 (d) Is designed to take into account the soil erodibility, 2088 soil percolation, slope, slope length, and drainage area so as 2089 to prevent erosion and reduce pollutant concentration of any 2090 discharge. 2091 Section 31. Subsections (1) and (3) of section 403.805, 2092 Florida Statutes, are amended to read: 2093 403.805 Secretary; powers and duties; review of specified 2094 rules.— 2095 (1) The secretary shall have the powers and duties of heads 2096 of departments set forth in chapter 20, including the authority 2097 to adopt rules pursuant to ss. 120.536(1) and 120.54 to 2098 implement this chapter and the provisions of chapters 161, 253, 2099 258, 260, 369, 373, 376, 377, 378, and 380 253, 373, and 376 and 2100 this chapter. The secretary shall have rulemaking responsibility 2101 under chapter 120, but shall submit any proposed rule containing 2102 standards to the Environmental Regulation Commission for 2103 approval, modification, or disapproval pursuant to s. 403.804, 2104 except for total maximum daily load calculations and allocations 2105 developed pursuant to s. 403.067(6). The secretary shall have 2106 responsibility for final agency action regarding total maximum 2107 daily load calculations and allocations developed pursuant to s. 2108 403.067(6). The secretary shall employ legal counsel to 2109 represent the department in matters affecting the department. 2110 Except for appeals on permits specifically assigned by this act 2111 to the Governor and Cabinet, and unless otherwise prohibited by 2112 law, the secretary may delegate the authority assigned to the 2113 department by this act to the assistant secretary, division 2114 directors, and district and branch office managers and to the 2115 water management districts. 2116 (3) After adoption of proposed rule 62-302.531(9), Florida 2117 Administrative Code, a nonseverability and effective date 2118 provision approved by the commission on December 8, 2011, in 2119 accordance with the commission’s legislative authority under s. 2120 403.804, notice of which was published by the department on 2121 December 22, 2011, in the Florida Administrative Register, Vol. 2122 37, No. 51, page 4446, any subsequent rule or amendment altering 2123 the effect of such rule must shall be submitted to the President 2124 of the Senate and the Speaker of the House of Representatives no 2125 later than 30 days before the next regular legislative session, 2126 and such amendment may not take effect until it is ratified by 2127 the Legislature. 2128 Section 32. Section 403.8055, Florida Statutes, is amended 2129 to read: 2130 403.8055 Department adoption of federal standards. 2131 Notwithstanding s. 120.54 ss. 120.54 and 403.804, the secretary 2132 is empowered to adopt rules substantively identical to 2133 regulations adopted in the Federal Register by the United States 2134 Environmental Protection Agency pursuant to federal law, in 2135 accordance with the following procedures: 2136 (1) The secretary shall publish notice of intent to adopt a 2137 rule pursuant to this section in the Florida Administrative 2138 Register at least 21 days before prior to filing the rule with 2139 the Department of State. The secretary shall mail a copy of the 2140 notice of intent to adopt a rule to the Administrative 2141 Procedures Committee at least 21 days before prior to the date 2142 of filing with the Department of State. Before Prior to filing 2143 the rule with the Department of State, the secretary shall 2144 consider any written comments received within 21 days after the 2145 date of publication of the notice of intent to adopt a rule. The 2146 rule must shall be adopted upon filing with the Department of 2147 State. Substantive changes from the rules as noticed shall 2148 require republishing of notice as required in this section. 2149 (2) Any rule adopted pursuant to this section becomes shall 2150 become effective upon the date designated in the rule by the 2151 secretary; however, no such a rule may not shall become 2152 effective earlier than the effective date of the substantively 2153 identical United States Environmental Protection Agency 2154 regulation. 2155 (3) The secretary shall stay any terms or conditions of a 2156 permit implementing department rules adopted pursuant to this 2157 section if the substantively identical provisions of a United 2158 States Environmental Protection Agency regulation have been 2159 stayed under federal judicial review. A stay issued pursuant to 2160 this subsection shall terminate upon completion of federal 2161 judicial review. 2162 (4) Any domestic for-profit or nonprofit corporation or 2163 association formed, in whole or in part: 2164 (a) To promote conservation or natural beauty; 2165 (b) To protect the environment, personal health, or other 2166 biological values; 2167 (c) To preserve historical sites; 2168 (d) To promote consumer interests; 2169 (e) To represent labor, commercial, or industrial groups; 2170 or 2171 (f) To promote orderly development; 2172 2173 and any other substantially affected person may, within 14 days 2174 after the date of publication of the notice of intent to adopt a 2175 rule, file an objection to rulemaking with the department 2176 Environmental Regulation Commission. The objection shall specify 2177 the portions of the proposed rule to which the person objects 2178 and the reasons for the objection. The secretary shall not have 2179 the authority under this section to adopt those portions of a 2180 proposed rule specified in such objection. Objections which are 2181 frivolous shall not be considered sufficient to prohibit the 2182 secretary from adopting rules under this section. 2183 (5) Whenever all or part of any rule proposed for adoption 2184 by the department is substantively identical to a regulation 2185 adopted in the Federal Register by the United States 2186 Environmental Protection Agency pursuant to federal law, such 2187 rule shall be written in a manner so that the rule specifically 2188 references such regulation whenever possible. 2189 Section 33. Subsection (1) of section 403.814, Florida 2190 Statutes, is amended to read: 2191 403.814 General permits; delegation.— 2192 (1) The secretary is authorized to adopt rules establishing 2193 and providing for a program of general permits under this 2194 chapter and chapter 253 and this chapter for projects, or 2195 categories of projects, which have, either singly or 2196 cumulatively, a minimal adverse environmental effect. Such rules 2197 must shall specify design or performance criteria that which, if 2198 applied, would result in compliance with appropriate standards 2199 adopted by the commission. Except as provided for in subsection 2200 (3), any person complying with the requirements of a general 2201 permit may use the permit 30 days after giving notice to the 2202 department without any agency action by the department. 2203 Section 34. Paragraph (a) of subsection (1) of section 2204 376.302, Florida Statutes, is amended to read: 2205 376.302 Prohibited acts; penalties.— 2206 (1) It shall be a violation of this chapter and it shall be 2207 prohibited for any reason: 2208 (a) To discharge pollutants or hazardous substances into or 2209 upon the surface or ground waters of the state or lands, which 2210 discharge violates any departmental “standard” as defined in s. 2211 403.803 s. 403.803(13). 2212 Section 35. Paragraph (b) of subsection (1) of section 2213 380.5105, Florida Statutes, is amended to read: 2214 380.5105 The Stan Mayfield Working Waterfronts; Florida 2215 Forever program.— 2216 (1) Notwithstanding any other provision of this chapter, it 2217 is the intent of the Legislature that the trust shall administer 2218 the working waterfronts land acquisition program as set forth in 2219 this section. 2220 (b) For projects that will require more than the grant 2221 amount awarded for completion, the applicant must identify in 2222 their project application funding sources that will provide the 2223 difference between the grant award and the estimated project 2224 completion cost. Such rules may be incorporated into those 2225 developed pursuant to s. 380.507(12) s. 380.507(11). 2226 Section 36. For the purpose of incorporating the amendment 2227 made by this act to section 381.0065, Florida Statutes, in a 2228 reference thereto, paragraph (k) of subsection (2) of section 2229 381.0066, Florida Statutes, is reenacted to read: 2230 381.0066 Onsite sewage treatment and disposal systems; 2231 fees.— 2232 (2) The minimum fees in the following fee schedule apply 2233 until changed by rule by the department within the following 2234 limits: 2235 (k) Research: An additional $5 fee shall be added to each 2236 new system construction permit issued to be used to fund onsite 2237 sewage treatment and disposal system research, demonstration, 2238 and training projects. Five dollars from any repair permit fee 2239 collected under this section shall be used for funding the 2240 hands-on training centers described in s. 381.0065(3)(j). 2241 2242 The funds collected pursuant to this subsection for the 2243 implementation of onsite sewage treatment and disposal system 2244 regulation and for the purposes of ss. 381.00655 and 381.0067, 2245 subsequent to any phased transfer of implementation from the 2246 Department of Health to the department within any county 2247 pursuant to s. 381.0065, must be deposited in the Florida Permit 2248 Fee Trust Fund under s. 403.0871, to be administered by the 2249 department. 2250 Section 37. For the purpose of incorporating the amendment 2251 made by this act to section 403.067, Florida Statutes, in a 2252 reference thereto, section 373.4595, Florida Statutes, is 2253 reenacted to read: 2254 373.4595 Northern Everglades and Estuaries Protection 2255 Program.— 2256 (1) FINDINGS AND INTENT.— 2257 (a) The Legislature finds that the Lake Okeechobee 2258 watershed, the Caloosahatchee River watershed, and the St. Lucie 2259 River watershed are critical water resources of the state, 2260 providing many economic, natural habitat, and biodiversity 2261 functions benefiting the public interest, including 2262 agricultural, public, and environmental water supply; flood 2263 control; fishing; navigation and recreation; and habitat to 2264 endangered and threatened species and other flora and fauna. 2265 (b) The Legislature finds that changes in land uses, the 2266 construction of the Central and Southern Florida Project, and 2267 the loss of surface water storage have resulted in adverse 2268 changes to the hydrology and water quality of Lake Okeechobee 2269 and the Caloosahatchee and St. Lucie Rivers and their estuaries. 2270 (c) The Legislature finds that improvement to the 2271 hydrology, water quality, and associated aquatic habitats within 2272 the Lake Okeechobee watershed, the Caloosahatchee River 2273 watershed, and the St. Lucie River watershed, is essential to 2274 the protection of the greater Everglades ecosystem. 2275 (d) The Legislature also finds that it is imperative for 2276 the state, local governments, and agricultural and environmental 2277 communities to commit to restoring and protecting the surface 2278 water resources of the Lake Okeechobee watershed, the 2279 Caloosahatchee River watershed, and the St. Lucie River 2280 watershed, and that a watershed-based approach to address these 2281 issues must be developed and implemented immediately. 2282 (e) The Legislature finds that phosphorus loads from the 2283 Lake Okeechobee watershed have contributed to excessive 2284 phosphorus levels throughout the Lake Okeechobee watershed and 2285 downstream receiving waters and that a reduction in levels of 2286 phosphorus will benefit the ecology of these systems. The 2287 excessive levels of phosphorus have also resulted in an 2288 accumulation of phosphorus in the sediments of Lake Okeechobee. 2289 If not removed, internal phosphorus loads from the sediments are 2290 expected to delay responses of the lake to external phosphorus 2291 reductions. 2292 (f) The Legislature finds that the Lake Okeechobee 2293 phosphorus loads set forth in the total maximum daily loads 2294 established in accordance with s. 403.067 represent an 2295 appropriate basis for restoration of the Lake Okeechobee 2296 watershed. 2297 (g) The Legislature finds that, in addition to phosphorus, 2298 other pollutants are contributing to water quality problems in 2299 the Lake Okeechobee watershed, the Caloosahatchee River 2300 watershed, and the St. Lucie River watershed, and that the total 2301 maximum daily load requirements of s. 403.067 provide a means of 2302 identifying and addressing these problems. 2303 (h) The Legislature finds that the expeditious 2304 implementation of the Lake Okeechobee Watershed Protection 2305 Program, the Caloosahatchee River Watershed Protection Program, 2306 and the St. Lucie River Watershed Protection Program is needed 2307 to improve the quality, quantity, timing, and distribution of 2308 water in the northern Everglades ecosystem and that this 2309 section, in conjunction with s. 403.067, including the 2310 implementation of the plans developed and approved pursuant to 2311 subsections (3) and (4), and any related basin management action 2312 plan developed and implemented pursuant to s. 403.067(7)(a), 2313 provide a reasonable means of achieving the total maximum daily 2314 load requirements and achieving and maintaining compliance with 2315 state water quality standards. 2316 (i) The Legislature finds that the implementation of the 2317 programs contained in this section is for the benefit of the 2318 public health, safety, and welfare and is in the public 2319 interest. 2320 (j) The Legislature finds that sufficient research has been 2321 conducted and sufficient plans developed to immediately expand 2322 and accelerate programs to address the hydrology and water 2323 quality in the Lake Okeechobee watershed, the Caloosahatchee 2324 River watershed, and the St. Lucie River watershed. 2325 (k) The Legislature finds that a continuing source of 2326 funding is needed to effectively implement the programs 2327 developed and approved under this section which are needed to 2328 address the hydrology and water quality problems within the Lake 2329 Okeechobee watershed, the Caloosahatchee River watershed, and 2330 the St. Lucie River watershed. 2331 (l) It is the intent of the Legislature to protect and 2332 restore surface water resources and achieve and maintain 2333 compliance with water quality standards in the Lake Okeechobee 2334 watershed, the Caloosahatchee River watershed, and the St. Lucie 2335 River watershed, and downstream receiving waters, through the 2336 phased, comprehensive, and innovative protection program set 2337 forth in this section which includes long-term solutions based 2338 upon the total maximum daily loads established in accordance 2339 with s. 403.067. This program shall be watershed-based, shall 2340 provide for consideration of all water quality issues needed to 2341 meet the total maximum daily load, and shall include research 2342 and monitoring, development and implementation of best 2343 management practices, refinement of existing regulations, and 2344 structural and nonstructural projects, including public works. 2345 (m) It is the intent of the Legislature that this section 2346 be implemented in coordination with the Comprehensive Everglades 2347 Restoration Plan project components and other federal programs 2348 in order to maximize opportunities for the most efficient and 2349 timely expenditures of public funds. 2350 (n) It is the intent of the Legislature that the 2351 coordinating agencies encourage and support the development of 2352 creative public-private partnerships and programs, including 2353 opportunities for water storage and quality improvement on 2354 private lands and water quality credit trading, to facilitate or 2355 further the restoration of the surface water resources of the 2356 Lake Okeechobee watershed, the Caloosahatchee River watershed, 2357 and the St. Lucie River watershed, consistent with s. 403.067. 2358 (2) DEFINITIONS.—As used in this section, the term: 2359 (a) “Best management practice” means a practice or 2360 combination of practices determined by the coordinating 2361 agencies, based on research, field-testing, and expert review, 2362 to be the most effective and practicable on-location means, 2363 including economic and technological considerations, for 2364 improving water quality in agricultural and urban discharges. 2365 Best management practices for agricultural discharges shall 2366 reflect a balance between water quality improvements and 2367 agricultural productivity. 2368 (b) “Biosolids” means the solid, semisolid, or liquid 2369 residue generated during the treatment of domestic wastewater in 2370 a domestic wastewater treatment facility, formerly known as 2371 “domestic wastewater residuals” or “residuals,” and includes 2372 products and treated material from biosolids treatment 2373 facilities and septage management facilities regulated by the 2374 department. The term does not include the treated effluent or 2375 reclaimed water from a domestic wastewater treatment facility, 2376 solids removed from pump stations and lift stations, screenings 2377 and grit removed from the preliminary treatment components of 2378 domestic wastewater treatment facilities, or ash generated 2379 during the incineration of biosolids. 2380 (c) “Caloosahatchee River watershed” means the 2381 Caloosahatchee River, its tributaries, its estuary, and the area 2382 within Charlotte, Glades, Hendry, and Lee Counties from which 2383 surface water flow is directed or drains, naturally or by 2384 constructed works, to the river, its tributaries, or its 2385 estuary. 2386 (d) “Coordinating agencies” means the Department of 2387 Agriculture and Consumer Services, the Department of 2388 Environmental Protection, and the South Florida Water Management 2389 District. 2390 (e) “Corps of Engineers” means the United States Army Corps 2391 of Engineers. 2392 (f) “Department” means the Department of Environmental 2393 Protection. 2394 (g) “District” means the South Florida Water Management 2395 District. 2396 (h) “Lake Okeechobee Watershed Construction Project” means 2397 the construction project developed pursuant to this section. 2398 (i) “Lake Okeechobee Watershed Protection Plan” means the 2399 Lake Okeechobee Watershed Construction Project and the Lake 2400 Okeechobee Watershed Research and Water Quality Monitoring 2401 Program. 2402 (j) “Lake Okeechobee watershed” means Lake Okeechobee, its 2403 tributaries, and the area within which surface water flow is 2404 directed or drains, naturally or by constructed works, to the 2405 lake or its tributaries. 2406 (k) “Northern Everglades” means the Lake Okeechobee 2407 watershed, the Caloosahatchee River watershed, and the St. Lucie 2408 River watershed. 2409 (l) “Project component” means any structural or operational 2410 change, resulting from the Restudy, to the Central and Southern 2411 Florida Project as it existed and was operated as of January 1, 2412 1999. 2413 (m) “Restudy” means the Comprehensive Review Study of the 2414 Central and Southern Florida Project, for which federal 2415 participation was authorized by the Federal Water Resources 2416 Development Acts of 1992 and 1996 together with related 2417 congressional resolutions and for which participation by the 2418 South Florida Water Management District is authorized by s. 2419 373.1501. The term includes all actions undertaken pursuant to 2420 the aforementioned authorizations which will result in 2421 recommendations for modifications or additions to the Central 2422 and Southern Florida Project. 2423 (n) “River Watershed Protection Plans” means the 2424 Caloosahatchee River Watershed Protection Plan and the St. Lucie 2425 River Watershed Protection Plan developed pursuant to this 2426 section. 2427 (o) “Soil amendment” means any substance or mixture of 2428 substances sold or offered for sale for soil enriching or 2429 corrective purposes, intended or claimed to be effective in 2430 promoting or stimulating plant growth, increasing soil or plant 2431 productivity, improving the quality of crops, or producing any 2432 chemical or physical change in the soil, except amendments, 2433 conditioners, additives, and related products that are derived 2434 solely from inorganic sources and that contain no recognized 2435 plant nutrients. 2436 (p) “St. Lucie River watershed” means the St. Lucie River, 2437 its tributaries, its estuary, and the area within Martin, 2438 Okeechobee, and St. Lucie Counties from which surface water flow 2439 is directed or drains, naturally or by constructed works, to the 2440 river, its tributaries, or its estuary. 2441 (q) “Total maximum daily load” means the sum of the 2442 individual wasteload allocations for point sources and the load 2443 allocations for nonpoint sources and natural background adopted 2444 pursuant to s. 403.067. Before determining individual wasteload 2445 allocations and load allocations, the maximum amount of a 2446 pollutant that a water body or water segment can assimilate from 2447 all sources without exceeding water quality standards must first 2448 be calculated. 2449 (3) LAKE OKEECHOBEE WATERSHED PROTECTION PROGRAM.—The Lake 2450 Okeechobee Watershed Protection Program shall consist of the 2451 Lake Okeechobee Watershed Protection Plan, the Lake Okeechobee 2452 Basin Management Action Plan adopted pursuant to s. 403.067, the 2453 Lake Okeechobee Exotic Species Control Program, and the Lake 2454 Okeechobee Internal Phosphorus Management Program. The Lake 2455 Okeechobee Basin Management Action Plan adopted pursuant to s. 2456 403.067 shall be the component of the Lake Okeechobee Watershed 2457 Protection Program that achieves phosphorus load reductions for 2458 Lake Okeechobee. The Lake Okeechobee Watershed Protection 2459 Program shall address the reduction of phosphorus loading to the 2460 lake from both internal and external sources. Phosphorus load 2461 reductions shall be achieved through a phased program of 2462 implementation. In the development and administration of the 2463 Lake Okeechobee Watershed Protection Program, the coordinating 2464 agencies shall maximize opportunities provided by federal cost 2465 sharing programs and opportunities for partnerships with the 2466 private sector. 2467 (a) Lake Okeechobee Watershed Protection Plan.—To protect 2468 and restore surface water resources, the district, in 2469 cooperation with the other coordinating agencies, shall complete 2470 a Lake Okeechobee Watershed Protection Plan in accordance with 2471 this section and ss. 373.451-373.459. Beginning March 1, 2020, 2472 and every 5 years thereafter, the district shall update the Lake 2473 Okeechobee Watershed Protection Plan to ensure that it is 2474 consistent with the Lake Okeechobee Basin Management Action Plan 2475 adopted pursuant to s. 403.067. The Lake Okeechobee Watershed 2476 Protection Plan shall identify the geographic extent of the 2477 watershed, be coordinated with the plans developed pursuant to 2478 paragraphs (4)(a) and (c), and include the Lake Okeechobee 2479 Watershed Construction Project and the Lake Okeechobee Watershed 2480 Research and Water Quality Monitoring Program. The plan shall 2481 consider and build upon a review and analysis of the performance 2482 of projects constructed during Phase I and Phase II of the Lake 2483 Okeechobee Watershed Construction Project, pursuant to 2484 subparagraph 1.; relevant information resulting from the Lake 2485 Okeechobee Basin Management Action Plan, pursuant to paragraph 2486 (b); relevant information resulting from the Lake Okeechobee 2487 Watershed Research and Water Quality Monitoring Program, 2488 pursuant to subparagraph 2.; relevant information resulting from 2489 the Lake Okeechobee Exotic Species Control Program, pursuant to 2490 paragraph (c); and relevant information resulting from the Lake 2491 Okeechobee Internal Phosphorus Management Program, pursuant to 2492 paragraph (d). 2493 1. Lake Okeechobee Watershed Construction Project.—To 2494 improve the hydrology and water quality of Lake Okeechobee and 2495 downstream receiving waters, including the Caloosahatchee and 2496 St. Lucie Rivers and their estuaries, the district, in 2497 cooperation with the other coordinating agencies, shall design 2498 and construct the Lake Okeechobee Watershed Construction 2499 Project. The project shall include: 2500 a. Phase I.—Phase I of the Lake Okeechobee Watershed 2501 Construction Project shall consist of a series of project 2502 features consistent with the recommendations of the South 2503 Florida Ecosystem Restoration Working Group’s Lake Okeechobee 2504 Action Plan. Priority basins for such projects include S-191, S 2505 154, and Pools D and E in the Lower Kissimmee River. To obtain 2506 phosphorus load reductions to Lake Okeechobee as soon as 2507 possible, the following actions shall be implemented: 2508 (I) The district shall serve as a full partner with the 2509 Corps of Engineers in the design and construction of the Grassy 2510 Island Ranch and New Palm Dairy stormwater treatment facilities 2511 as components of the Lake Okeechobee Water Retention/Phosphorus 2512 Removal Critical Project. The Corps of Engineers shall have the 2513 lead in design and construction of these facilities. Should 2514 delays be encountered in the implementation of either of these 2515 facilities, the district shall notify the department and 2516 recommend corrective actions. 2517 (II) The district shall obtain permits and complete 2518 construction of two of the isolated wetland restoration projects 2519 that are part of the Lake Okeechobee Water Retention/Phosphorus 2520 Removal Critical Project. The additional isolated wetland 2521 projects included in this critical project shall further reduce 2522 phosphorus loading to Lake Okeechobee. 2523 (III) The district shall work with the Corps of Engineers 2524 to expedite initiation of the design process for the Taylor 2525 Creek/Nubbins Slough Reservoir Assisted Stormwater Treatment 2526 Area, a project component of the Comprehensive Everglades 2527 Restoration Plan. The district shall propose to the Corps of 2528 Engineers that the district take the lead in the design and 2529 construction of the Reservoir Assisted Stormwater Treatment Area 2530 and receive credit towards the local share of the total cost of 2531 the Comprehensive Everglades Restoration Plan. 2532 b. Phase II technical plan and construction.—The district, 2533 in cooperation with the other coordinating agencies, shall 2534 develop a detailed technical plan for Phase II of the Lake 2535 Okeechobee Watershed Construction Project which provides the 2536 basis for the Lake Okeechobee Basin Management Action Plan 2537 adopted by the department pursuant to s. 403.067. The detailed 2538 technical plan shall include measures for the improvement of the 2539 quality, quantity, timing, and distribution of water in the 2540 northern Everglades ecosystem, including the Lake Okeechobee 2541 watershed and the estuaries, and for facilitating the 2542 achievement of water quality standards. Use of cost-effective 2543 biologically based, hybrid wetland/chemical and other innovative 2544 nutrient control technologies shall be incorporated in the plan 2545 where appropriate. The detailed technical plan shall also 2546 include a Process Development and Engineering component to 2547 finalize the detail and design of Phase II projects and identify 2548 additional measures needed to increase the certainty that the 2549 overall objectives for improving water quality and quantity can 2550 be met. Based on information and recommendations from the 2551 Process Development and Engineering component, the Phase II 2552 detailed technical plan shall be periodically updated. Phase II 2553 shall include construction of additional facilities in the 2554 priority basins identified in sub-subparagraph a., as well as 2555 facilities for other basins in the Lake Okeechobee watershed. 2556 The technical plan shall: 2557 (I) Identify Lake Okeechobee Watershed Construction Project 2558 facilities designed to contribute to achieving all applicable 2559 total maximum daily loads established pursuant to s. 403.067 2560 within the Lake Okeechobee watershed. 2561 (II) Identify the size and location of all such Lake 2562 Okeechobee Watershed Construction Project facilities. 2563 (III) Provide a construction schedule for all such Lake 2564 Okeechobee Watershed Construction Project facilities, including 2565 the sequencing and specific timeframe for construction of each 2566 Lake Okeechobee Watershed Construction Project facility. 2567 (IV) Provide a schedule for the acquisition of lands or 2568 sufficient interests necessary to achieve the construction 2569 schedule. 2570 (V) Provide a detailed schedule of costs associated with 2571 the construction schedule. 2572 (VI) Identify, to the maximum extent practicable, impacts 2573 on wetlands and state-listed species expected to be associated 2574 with construction of such facilities, including potential 2575 alternatives to minimize and mitigate such impacts, as 2576 appropriate. 2577 (VII) Provide for additional measures, including voluntary 2578 water storage and quality improvements on private land, to 2579 increase water storage and reduce excess water levels in Lake 2580 Okeechobee and to reduce excess discharges to the estuaries. 2581 (VIII) Develop the appropriate water quantity storage goal 2582 to achieve the desired Lake Okeechobee range of lake levels and 2583 inflow volumes to the Caloosahatchee and St. Lucie estuaries 2584 while meeting the other water-related needs of the region, 2585 including water supply and flood protection. 2586 (IX) Provide for additional source controls needed to 2587 enhance performance of the Lake Okeechobee Watershed 2588 Construction Project facilities. Such additional source controls 2589 shall be incorporated into the Lake Okeechobee Basin Management 2590 Action Plan pursuant to paragraph (b). 2591 c. Evaluation.—Within 5 years after the adoption of the 2592 Lake Okeechobee Basin Management Action Plan pursuant to s. 2593 403.067 and every 5 years thereafter, the department, in 2594 cooperation with the other coordinating agencies, shall conduct 2595 an evaluation of the Lake Okeechobee Watershed Construction 2596 Project and identify any further load reductions necessary to 2597 achieve compliance with the Lake Okeechobee total maximum daily 2598 loads established pursuant to s. 403.067. The district shall 2599 identify modifications to facilities of the Lake Okeechobee 2600 Watershed Construction Project as appropriate to meet the total 2601 maximum daily loads. Modifications to the Lake Okeechobee 2602 Watershed Construction Project resulting from this evaluation 2603 shall be incorporated into the Lake Okeechobee Basin Management 2604 Action Plan and included in the applicable annual progress 2605 report submitted pursuant to subsection (6). 2606 d. Coordination and review.—To ensure the timely 2607 implementation of the Lake Okeechobee Watershed Construction 2608 Project, the design of project facilities shall be coordinated 2609 with the department and other interested parties, including 2610 affected local governments, to the maximum extent practicable. 2611 Lake Okeechobee Watershed Construction Project facilities shall 2612 be reviewed and commented upon by the department before the 2613 execution of a construction contract by the district for that 2614 facility. 2615 2. Lake Okeechobee Watershed Research and Water Quality 2616 Monitoring Program.—The coordinating agencies shall implement a 2617 Lake Okeechobee Watershed Research and Water Quality Monitoring 2618 Program. Results from the program shall be used by the 2619 department, in cooperation with the other coordinating agencies, 2620 to make modifications to the Lake Okeechobee Basin Management 2621 Action Plan adopted pursuant to s. 403.067, as appropriate. The 2622 program shall: 2623 a. Evaluate all available existing water quality data 2624 concerning total phosphorus in the Lake Okeechobee watershed, 2625 develop a water quality baseline to represent existing 2626 conditions for total phosphorus, monitor long-term ecological 2627 changes, including water quality for total phosphorus, and 2628 measure compliance with water quality standards for total 2629 phosphorus, including any applicable total maximum daily load 2630 for the Lake Okeechobee watershed as established pursuant to s. 2631 403.067. Beginning March 1, 2020, and every 5 years thereafter, 2632 the department shall reevaluate water quality and quantity data 2633 to ensure that the appropriate projects are being designated and 2634 incorporated into the Lake Okeechobee Basin Management Action 2635 Plan adopted pursuant to s. 403.067. The district shall 2636 implement a total phosphorus monitoring program at appropriate 2637 structures owned or operated by the district and within the Lake 2638 Okeechobee watershed. 2639 b. Develop a Lake Okeechobee water quality model that 2640 reasonably represents the phosphorus dynamics of Lake Okeechobee 2641 and incorporates an uncertainty analysis associated with model 2642 predictions. 2643 c. Determine the relative contribution of phosphorus from 2644 all identifiable sources and all primary and secondary land 2645 uses. 2646 d. Conduct an assessment of the sources of phosphorus from 2647 the Upper Kissimmee Chain of Lakes and Lake Istokpoga and their 2648 relative contribution to the water quality of Lake Okeechobee. 2649 The results of this assessment shall be used by the coordinating 2650 agencies as part of the Lake Okeechobee Basin Management Action 2651 Plan adopted pursuant to s. 403.067 to develop interim measures, 2652 best management practices, or regulations, as applicable. 2653 e. Assess current water management practices within the 2654 Lake Okeechobee watershed and develop recommendations for 2655 structural and operational improvements. Such recommendations 2656 shall balance water supply, flood control, estuarine salinity, 2657 maintenance of a healthy lake littoral zone, and water quality 2658 considerations. 2659 f. Evaluate the feasibility of alternative nutrient 2660 reduction technologies, including sediment traps, canal and 2661 ditch maintenance, fish production or other aquaculture, 2662 bioenergy conversion processes, and algal or other biological 2663 treatment technologies and include any alternative nutrient 2664 reduction technologies determined to be feasible in the Lake 2665 Okeechobee Basin Management Action Plan adopted pursuant to s. 2666 403.067. 2667 g. Conduct an assessment of the water volumes and timing 2668 from the Lake Okeechobee watershed and their relative 2669 contribution to the water level changes in Lake Okeechobee and 2670 to the timing and volume of water delivered to the estuaries. 2671 (b) Lake Okeechobee Basin Management Action Plan.—The Lake 2672 Okeechobee Basin Management Action Plan adopted pursuant to s. 2673 403.067 shall be the watershed phosphorus control component for 2674 Lake Okeechobee. The Lake Okeechobee Basin Management Action 2675 Plan shall be a multifaceted approach designed to achieve the 2676 total maximum daily load by improving the management of 2677 phosphorus sources within the Lake Okeechobee watershed through 2678 implementation of regulations and best management practices, 2679 continued development and continued implementation of improved 2680 best management practices, improvement and restoration of the 2681 hydrologic function of natural and managed systems, and use of 2682 alternative technologies for nutrient reduction. As provided in 2683 s. 403.067(7)(a)6., the Lake Okeechobee Basin Management Action 2684 Plan must include milestones for implementation and water 2685 quality improvement, and an associated water quality monitoring 2686 component sufficient to evaluate whether reasonable progress in 2687 pollutant load reductions is being achieved over time. An 2688 assessment of progress toward these milestones shall be 2689 conducted every 5 years and shall be provided to the Governor, 2690 the President of the Senate, and the Speaker of the House of 2691 Representatives. Revisions to the plan shall be made, as 2692 appropriate, as a result of each 5-year review. Revisions to the 2693 basin management action plan shall be made by the department in 2694 cooperation with the basin stakeholders. Revisions to best 2695 management practices or other measures must follow the 2696 procedures set forth in s. 403.067(7)(c)4. Revised basin 2697 management action plans must be adopted pursuant to s. 2698 403.067(7)(a)5. The department shall develop an implementation 2699 schedule establishing 5-year, 10-year, and 15-year measurable 2700 milestones and targets to achieve the total maximum daily load 2701 no more than 20 years after adoption of the plan. The initial 2702 implementation schedule shall be used to provide guidance for 2703 planning and funding purposes and is exempt from chapter 120. 2704 Upon the first 5-year review, the implementation schedule shall 2705 be adopted as part of the plan. If achieving the total maximum 2706 daily load within 20 years is not practicable, the 2707 implementation schedule must contain an explanation of the 2708 constraints that prevent achievement of the total maximum daily 2709 load within 20 years, an estimate of the time needed to achieve 2710 the total maximum daily load, and additional 5-year measurable 2711 milestones, as necessary. The coordinating agencies shall 2712 develop an interagency agreement pursuant to ss. 373.046 and 2713 373.406(5) which is consistent with the department taking the 2714 lead on water quality protection measures through the Lake 2715 Okeechobee Basin Management Action Plan adopted pursuant to s. 2716 403.067; the district taking the lead on hydrologic improvements 2717 pursuant to paragraph (a); and the Department of Agriculture and 2718 Consumer Services taking the lead on agricultural interim 2719 measures, best management practices, and other measures adopted 2720 pursuant to s. 403.067. The interagency agreement must specify 2721 how best management practices for nonagricultural nonpoint 2722 sources are developed and how all best management practices are 2723 implemented and verified consistent with s. 403.067 and this 2724 section and must address measures to be taken by the 2725 coordinating agencies during any best management practice 2726 reevaluation performed pursuant to subparagraphs 5. and 10. The 2727 department shall use best professional judgment in making the 2728 initial determination of best management practice effectiveness. 2729 The coordinating agencies may develop an intergovernmental 2730 agreement with local governments to implement nonagricultural 2731 nonpoint source best management practices within their 2732 respective geographic boundaries. The coordinating agencies 2733 shall facilitate the application of federal programs that offer 2734 opportunities for water quality treatment, including 2735 preservation, restoration, or creation of wetlands on 2736 agricultural lands. 2737 1. Agricultural nonpoint source best management practices, 2738 developed in accordance with s. 403.067 and designed to achieve 2739 the objectives of the Lake Okeechobee Watershed Protection 2740 Program as part of a phased approach of management strategies 2741 within the Lake Okeechobee Basin Management Action Plan, shall 2742 be implemented on an expedited basis. 2743 2. As provided in s. 403.067, the Department of Agriculture 2744 and Consumer Services, in consultation with the department, the 2745 district, and affected parties, shall initiate rule development 2746 for interim measures, best management practices, conservation 2747 plans, nutrient management plans, or other measures necessary 2748 for Lake Okeechobee watershed total maximum daily load 2749 reduction. The rule shall include thresholds for requiring 2750 conservation and nutrient management plans and criteria for the 2751 contents of such plans. Development of agricultural nonpoint 2752 source best management practices shall initially focus on those 2753 priority basins listed in sub-subparagraph (a)1.a. The 2754 Department of Agriculture and Consumer Services, in consultation 2755 with the department, the district, and affected parties, shall 2756 conduct an ongoing program for improvement of existing and 2757 development of new agricultural nonpoint source interim measures 2758 and best management practices. The Department of Agriculture and 2759 Consumer Services shall adopt such practices by rule. The 2760 Department of Agriculture and Consumer Services shall work with 2761 the University of Florida Institute of Food and Agriculture 2762 Sciences to review and, where appropriate, develop revised 2763 nutrient application rates for all agricultural soil amendments 2764 in the watershed. 2765 3. As provided in s. 403.067, where agricultural nonpoint 2766 source best management practices or interim measures have been 2767 adopted by rule of the Department of Agriculture and Consumer 2768 Services, the owner or operator of an agricultural nonpoint 2769 source addressed by such rule shall either implement interim 2770 measures or best management practices or demonstrate compliance 2771 with state water quality standards addressed by the Lake 2772 Okeechobee Basin Management Action Plan adopted pursuant to s. 2773 403.067 by conducting monitoring prescribed by the department or 2774 the district. Owners or operators of agricultural nonpoint 2775 sources who implement interim measures or best management 2776 practices adopted by rule of the Department of Agriculture and 2777 Consumer Services shall be subject to s. 403.067. 2778 4. The district or department shall conduct monitoring at 2779 representative sites to verify the effectiveness of agricultural 2780 nonpoint source best management practices. 2781 5. Where water quality problems are detected for 2782 agricultural nonpoint sources despite the appropriate 2783 implementation of adopted best management practices, a 2784 reevaluation of the best management practices shall be conducted 2785 pursuant to s. 403.067(7)(c)4. If the reevaluation determines 2786 that the best management practices or other measures require 2787 modification, the rule shall be revised to require 2788 implementation of the modified practice within a reasonable 2789 period as specified in the rule. 2790 6. As provided in s. 403.067, nonagricultural nonpoint 2791 source best management practices, developed in accordance with 2792 s. 403.067 and designed to achieve the objectives of the Lake 2793 Okeechobee Watershed Protection Program as part of a phased 2794 approach of management strategies within the Lake Okeechobee 2795 Basin Management Action Plan, shall be implemented on an 2796 expedited basis. 2797 7. The department and the district are directed to work 2798 with the University of Florida Institute of Food and 2799 Agricultural Sciences to develop appropriate nutrient 2800 application rates for all nonagricultural soil amendments in the 2801 watershed. As provided in s. 403.067, the department, in 2802 consultation with the district and affected parties, shall 2803 develop nonagricultural nonpoint source interim measures, best 2804 management practices, or other measures necessary for Lake 2805 Okeechobee watershed total maximum daily load reduction. 2806 Development of nonagricultural nonpoint source best management 2807 practices shall initially focus on those priority basins listed 2808 in sub-subparagraph (a)1.a. The department, the district, and 2809 affected parties shall conduct an ongoing program for 2810 improvement of existing and development of new interim measures 2811 and best management practices. The department or the district 2812 shall adopt such practices by rule. 2813 8. Where nonagricultural nonpoint source best management 2814 practices or interim measures have been developed by the 2815 department and adopted by the district, the owner or operator of 2816 a nonagricultural nonpoint source shall implement interim 2817 measures or best management practices and be subject to s. 2818 403.067. 2819 9. As provided in s. 403.067, the district or the 2820 department shall conduct monitoring at representative sites to 2821 verify the effectiveness of nonagricultural nonpoint source best 2822 management practices. 2823 10. Where water quality problems are detected for 2824 nonagricultural nonpoint sources despite the appropriate 2825 implementation of adopted best management practices, a 2826 reevaluation of the best management practices shall be conducted 2827 pursuant to s. 403.067(7)(c)4. If the reevaluation determines 2828 that the best management practices or other measures require 2829 modification, the rule shall be revised to require 2830 implementation of the modified practice within a reasonable time 2831 period as specified in the rule. 2832 11. Subparagraphs 2. and 7. do not preclude the department 2833 or the district from requiring compliance with water quality 2834 standards or with current best management practices requirements 2835 set forth in any applicable regulatory program authorized by law 2836 for the purpose of protecting water quality. Subparagraphs 2. 2837 and 7. are applicable only to the extent that they do not 2838 conflict with any rules adopted by the department that are 2839 necessary to maintain a federally delegated or approved program. 2840 12. The program of agricultural best management practices 2841 set forth in the Everglades Program of the district meets the 2842 requirements of this paragraph and s. 403.067(7) for the Lake 2843 Okeechobee watershed. An entity in compliance with the best 2844 management practices set forth in the Everglades Program of the 2845 district may elect to use that permit in lieu of the 2846 requirements of this paragraph. The provisions of subparagraph 2847 5. apply to this subparagraph. This subparagraph does not alter 2848 any requirement of s. 373.4592. 2849 13. The Department of Agriculture and Consumer Services, in 2850 cooperation with the department and the district, shall provide 2851 technical and financial assistance for implementation of 2852 agricultural best management practices, subject to the 2853 availability of funds. The department and district shall provide 2854 technical and financial assistance for implementation of 2855 nonagricultural nonpoint source best management practices, 2856 subject to the availability of funds. 2857 14. Projects that reduce the phosphorus load originating 2858 from domestic wastewater systems within the Lake Okeechobee 2859 watershed shall be given funding priority in the department’s 2860 revolving loan program under s. 403.1835. The department shall 2861 coordinate and provide assistance to those local governments 2862 seeking financial assistance for such priority projects. 2863 15. Projects that make use of private lands, or lands held 2864 in trust for Indian tribes, to reduce nutrient loadings or 2865 concentrations within a basin by one or more of the following 2866 methods: restoring the natural hydrology of the basin, restoring 2867 wildlife habitat or impacted wetlands, reducing peak flows after 2868 storm events, increasing aquifer recharge, or protecting range 2869 and timberland from conversion to development, are eligible for 2870 grants available under this section from the coordinating 2871 agencies. For projects of otherwise equal priority, special 2872 funding priority will be given to those projects that make best 2873 use of the methods outlined above that involve public-private 2874 partnerships or that obtain federal match money. Preference 2875 ranking above the special funding priority will be given to 2876 projects located in a rural area of opportunity designated by 2877 the Governor. Grant applications may be submitted by any person 2878 or tribal entity, and eligible projects may include, but are not 2879 limited to, the purchase of conservation and flowage easements, 2880 hydrologic restoration of wetlands, creating treatment wetlands, 2881 development of a management plan for natural resources, and 2882 financial support to implement a management plan. 2883 16. The department shall require all entities disposing of 2884 domestic wastewater biosolids within the Lake Okeechobee 2885 watershed and the remaining areas of Okeechobee, Glades, and 2886 Hendry Counties to develop and submit to the department an 2887 agricultural use plan that limits applications based upon 2888 phosphorus loading consistent with the Lake Okeechobee Basin 2889 Management Action Plan adopted pursuant to s. 403.067. The 2890 department may not authorize the disposal of domestic wastewater 2891 biosolids within the Lake Okeechobee watershed unless the 2892 applicant can affirmatively demonstrate that the phosphorus in 2893 the biosolids will not add to phosphorus loadings in Lake 2894 Okeechobee or its tributaries. This demonstration shall be based 2895 on achieving a net balance between phosphorus imports relative 2896 to exports on the permitted application site. Exports shall 2897 include only phosphorus removed from the Lake Okeechobee 2898 watershed through products generated on the permitted 2899 application site. This prohibition does not apply to Class AA 2900 biosolids that are marketed and distributed as fertilizer 2901 products in accordance with department rule. 2902 17. Private and government-owned utilities within Monroe, 2903 Miami-Dade, Broward, Palm Beach, Martin, St. Lucie, Indian 2904 River, Okeechobee, Highlands, Hendry, and Glades Counties that 2905 dispose of wastewater biosolids sludge from utility operations 2906 and septic removal by land spreading in the Lake Okeechobee 2907 watershed may use a line item on local sewer rates to cover 2908 wastewater biosolids treatment and disposal if such disposal and 2909 treatment is done by approved alternative treatment methodology 2910 at a facility located within the areas designated by the 2911 Governor as rural areas of opportunity pursuant to s. 288.0656. 2912 This additional line item is an environmental protection 2913 disposal fee above the present sewer rate and may not be 2914 considered a part of the present sewer rate to customers, 2915 notwithstanding provisions to the contrary in chapter 367. The 2916 fee shall be established by the county commission or its 2917 designated assignee in the county in which the alternative 2918 method treatment facility is located. The fee shall be 2919 calculated to be no higher than that necessary to recover the 2920 facility’s prudent cost of providing the service. Upon request 2921 by an affected county commission, the Florida Public Service 2922 Commission will provide assistance in establishing the fee. 2923 Further, for utilities and utility authorities that use the 2924 additional line item environmental protection disposal fee, such 2925 fee may not be considered a rate increase under the rules of the 2926 Public Service Commission and shall be exempt from such rules. 2927 Utilities using this section may immediately include in their 2928 sewer invoicing the new environmental protection disposal fee. 2929 Proceeds from this environmental protection disposal fee shall 2930 be used for treatment and disposal of wastewater biosolids, 2931 including any treatment technology that helps reduce the volume 2932 of biosolids that require final disposal, but such proceeds may 2933 not be used for transportation or shipment costs for disposal or 2934 any costs relating to the land application of biosolids in the 2935 Lake Okeechobee watershed. 2936 18. No less frequently than once every 3 years, the Florida 2937 Public Service Commission or the county commission through the 2938 services of an independent auditor shall perform a financial 2939 audit of all facilities receiving compensation from an 2940 environmental protection disposal fee. The Florida Public 2941 Service Commission or the county commission through the services 2942 of an independent auditor shall also perform an audit of the 2943 methodology used in establishing the environmental protection 2944 disposal fee. The Florida Public Service Commission or the 2945 county commission shall, within 120 days after completion of an 2946 audit, file the audit report with the President of the Senate 2947 and the Speaker of the House of Representatives and shall 2948 provide copies to the county commissions of the counties set 2949 forth in subparagraph 17. The books and records of any 2950 facilities receiving compensation from an environmental 2951 protection disposal fee shall be open to the Florida Public 2952 Service Commission and the Auditor General for review upon 2953 request. 2954 19. The Department of Health shall require all entities 2955 disposing of septage within the Lake Okeechobee watershed to 2956 develop and submit to that agency an agricultural use plan that 2957 limits applications based upon phosphorus loading consistent 2958 with the Lake Okeechobee Basin Management Action Plan adopted 2959 pursuant to s. 403.067. 2960 20. The Department of Agriculture and Consumer Services 2961 shall initiate rulemaking requiring entities within the Lake 2962 Okeechobee watershed which land-apply animal manure to develop 2963 resource management system level conservation plans, according 2964 to United States Department of Agriculture criteria, which limit 2965 such application. Such rules must include criteria and 2966 thresholds for the requirement to develop a conservation or 2967 nutrient management plan, requirements for plan approval, site 2968 inspection requirements, and recordkeeping requirements. 2969 21. The district shall revise chapter 40E-61, Florida 2970 Administrative Code, to be consistent with this section and s. 2971 403.067; provide for a monitoring program for nonpoint source 2972 dischargers required to monitor water quality by s. 403.067; and 2973 provide for the results of such monitoring to be reported to the 2974 coordinating agencies. 2975 (c) Lake Okeechobee Exotic Species Control Program.—The 2976 coordinating agencies shall identify the exotic species that 2977 threaten the native flora and fauna within the Lake Okeechobee 2978 watershed and develop and implement measures to protect the 2979 native flora and fauna. 2980 (d) Lake Okeechobee Internal Phosphorus Management 2981 Program.—The district, in cooperation with the other 2982 coordinating agencies and interested parties, shall evaluate the 2983 feasibility of Lake Okeechobee internal phosphorus load removal 2984 projects. The evaluation shall be based on technical 2985 feasibility, as well as economic considerations, and shall 2986 consider all reasonable methods of phosphorus removal. If 2987 projects are found to be feasible, the district shall 2988 immediately pursue the design, funding, and permitting for 2989 implementing such projects. 2990 (e) Lake Okeechobee Watershed Protection Program 2991 implementation.—The coordinating agencies shall be jointly 2992 responsible for implementing the Lake Okeechobee Watershed 2993 Protection Program, consistent with the statutory authority and 2994 responsibility of each agency. Annual funding priorities shall 2995 be jointly established, and the highest priority shall be 2996 assigned to programs and projects that address sources that have 2997 the highest relative contribution to loading and the greatest 2998 potential for reductions needed to meet the total maximum daily 2999 loads. In determining funding priorities, the coordinating 3000 agencies shall also consider the need for regulatory compliance, 3001 the extent to which the program or project is ready to proceed, 3002 and the availability of federal matching funds or other nonstate 3003 funding, including public-private partnerships. Federal and 3004 other nonstate funding shall be maximized to the greatest extent 3005 practicable. 3006 (f) Priorities and implementation schedules.—The 3007 coordinating agencies are authorized and directed to establish 3008 priorities and implementation schedules for the achievement of 3009 total maximum daily loads, compliance with the requirements of 3010 s. 403.067, and compliance with applicable water quality 3011 standards within the waters and watersheds subject to this 3012 section. 3013 (4) CALOOSAHATCHEE RIVER WATERSHED PROTECTION PROGRAM AND 3014 ST. LUCIE RIVER WATERSHED PROTECTION PROGRAM.—A protection 3015 program shall be developed and implemented as specified in this 3016 subsection. To protect and restore surface water resources, the 3017 program shall address the reduction of pollutant loadings, 3018 restoration of natural hydrology, and compliance with applicable 3019 state water quality standards. The program shall be achieved 3020 through a phased program of implementation. In addition, 3021 pollutant load reductions based upon adopted total maximum daily 3022 loads established in accordance with s. 403.067 shall serve as a 3023 program objective. In the development and administration of the 3024 program, the coordinating agencies shall maximize opportunities 3025 provided by federal and local government cost-sharing programs 3026 and opportunities for partnerships with the private sector and 3027 local government. The program shall include a goal for salinity 3028 envelopes and freshwater inflow targets for the estuaries based 3029 upon existing research and documentation. The goal may be 3030 revised as new information is available. This goal shall seek to 3031 reduce the frequency and duration of undesirable salinity ranges 3032 while meeting the other water-related needs of the region, 3033 including water supply and flood protection, while recognizing 3034 the extent to which water inflows are within the control and 3035 jurisdiction of the district. 3036 (a) Caloosahatchee River Watershed Protection Plan.—The 3037 district, in cooperation with the other coordinating agencies, 3038 Lee County, and affected counties and municipalities, shall 3039 complete a River Watershed Protection Plan in accordance with 3040 this subsection. The Caloosahatchee River Watershed Protection 3041 Plan shall identify the geographic extent of the watershed, be 3042 coordinated as needed with the plans developed pursuant to 3043 paragraph (3)(a) and paragraph (c) of this subsection, and 3044 include the Caloosahatchee River Watershed Construction Project 3045 and the Caloosahatchee River Watershed Research and Water 3046 Quality Monitoring Program. 3047 1. Caloosahatchee River Watershed Construction Project.—To 3048 improve the hydrology, water quality, and aquatic habitats 3049 within the watershed, the district shall, no later than January 3050 1, 2012, plan, design, and construct the initial phase of the 3051 Watershed Construction Project. In doing so, the district shall: 3052 a. Develop and designate the facilities to be constructed 3053 to achieve stated goals and objectives of the Caloosahatchee 3054 River Watershed Protection Plan. 3055 b. Conduct scientific studies that are necessary to support 3056 the design of the Caloosahatchee River Watershed Construction 3057 Project facilities. 3058 c. Identify the size and location of all such facilities. 3059 d. Provide a construction schedule for all such facilities, 3060 including the sequencing and specific timeframe for construction 3061 of each facility. 3062 e. Provide a schedule for the acquisition of lands or 3063 sufficient interests necessary to achieve the construction 3064 schedule. 3065 f. Provide a schedule of costs and benefits associated with 3066 each construction project and identify funding sources. 3067 g. To ensure timely implementation, coordinate the design, 3068 scheduling, and sequencing of project facilities with the 3069 coordinating agencies, Lee County, other affected counties and 3070 municipalities, and other affected parties. 3071 2. Caloosahatchee River Watershed Research and Water 3072 Quality Monitoring Program.—The district, in cooperation with 3073 the other coordinating agencies and local governments, shall 3074 implement a Caloosahatchee River Watershed Research and Water 3075 Quality Monitoring Program that builds upon the district’s 3076 existing research program and that is sufficient to carry out, 3077 comply with, or assess the plans, programs, and other 3078 responsibilities created by this subsection. The program shall 3079 also conduct an assessment of the water volumes and timing from 3080 Lake Okeechobee and the Caloosahatchee River watershed and their 3081 relative contributions to the timing and volume of water 3082 delivered to the estuary. 3083 (b) Caloosahatchee River Watershed Basin Management Action 3084 Plans.—The basin management action plans adopted pursuant to s. 3085 403.067 for the Caloosahatchee River watershed shall be the 3086 Caloosahatchee River Watershed Pollutant Control Program. The 3087 plans shall be designed to be a multifaceted approach to 3088 reducing pollutant loads by improving the management of 3089 pollutant sources within the Caloosahatchee River watershed 3090 through implementation of regulations and best management 3091 practices, development and implementation of improved best 3092 management practices, improvement and restoration of the 3093 hydrologic function of natural and managed systems, and 3094 utilization of alternative technologies for pollutant reduction, 3095 such as cost-effective biologically based, hybrid 3096 wetland/chemical and other innovative nutrient control 3097 technologies. As provided in s. 403.067(7)(a)6., the 3098 Caloosahatchee River Watershed Basin Management Action Plans 3099 must include milestones for implementation and water quality 3100 improvement, and an associated water quality monitoring 3101 component sufficient to evaluate whether reasonable progress in 3102 pollutant load reductions is being achieved over time. An 3103 assessment of progress toward these milestones shall be 3104 conducted every 5 years and shall be provided to the Governor, 3105 the President of the Senate, and the Speaker of the House of 3106 Representatives. Revisions to the plans shall be made, as 3107 appropriate, as a result of each 5-year review. Revisions to the 3108 basin management action plans shall be made by the department in 3109 cooperation with the basin stakeholders. Revisions to best 3110 management practices or other measures must follow the 3111 procedures set forth in s. 403.067(7)(c)4. Revised basin 3112 management action plans must be adopted pursuant to s. 3113 403.067(7)(a)5. The department shall develop an implementation 3114 schedule establishing 5-year, 10-year, and 15-year measurable 3115 milestones and targets to achieve the total maximum daily load 3116 no more than 20 years after adoption of the plan. The initial 3117 implementation schedule shall be used to provide guidance for 3118 planning and funding purposes and is exempt from chapter 120. 3119 Upon the first 5-year review, the implementation schedule shall 3120 be adopted as part of the plans. If achieving the total maximum 3121 daily load within 20 years is not practicable, the 3122 implementation schedule must contain an explanation of the 3123 constraints that prevent achievement of the total maximum daily 3124 load within 20 years, an estimate of the time needed to achieve 3125 the total maximum daily load, and additional 5-year measurable 3126 milestones, as necessary. The coordinating agencies shall 3127 facilitate the use of federal programs that offer opportunities 3128 for water quality treatment, including preservation, 3129 restoration, or creation of wetlands on agricultural lands. 3130 1. Nonpoint source best management practices consistent 3131 with s. 403.067, designed to achieve the objectives of the 3132 Caloosahatchee River Watershed Protection Program, shall be 3133 implemented on an expedited basis. The coordinating agencies may 3134 develop an intergovernmental agreement with local governments to 3135 implement the nonagricultural, nonpoint source best management 3136 practices within their respective geographic boundaries. 3137 2. This subsection does not preclude the department or the 3138 district from requiring compliance with water quality standards, 3139 adopted total maximum daily loads, or current best management 3140 practices requirements set forth in any applicable regulatory 3141 program authorized by law for the purpose of protecting water 3142 quality. This subsection applies only to the extent that it does 3143 not conflict with any rules adopted by the department or 3144 district which are necessary to maintain a federally delegated 3145 or approved program. 3146 3. Projects that make use of private lands, or lands held 3147 in trust for Indian tribes, to reduce pollutant loadings or 3148 concentrations within a basin, or that reduce the volume of 3149 harmful discharges by one or more of the following methods: 3150 restoring the natural hydrology of the basin, restoring wildlife 3151 habitat or impacted wetlands, reducing peak flows after storm 3152 events, or increasing aquifer recharge, are eligible for grants 3153 available under this section from the coordinating agencies. 3154 4. The Caloosahatchee River Watershed Basin Management 3155 Action Plans shall require assessment of current water 3156 management practices within the watershed and shall require 3157 development of recommendations for structural, nonstructural, 3158 and operational improvements. Such recommendations shall 3159 consider and balance water supply, flood control, estuarine 3160 salinity, aquatic habitat, and water quality considerations. 3161 5. The department may not authorize the disposal of 3162 domestic wastewater biosolids within the Caloosahatchee River 3163 watershed unless the applicant can affirmatively demonstrate 3164 that the nutrients in the biosolids will not add to nutrient 3165 loadings in the watershed. This demonstration shall be based on 3166 achieving a net balance between nutrient imports relative to 3167 exports on the permitted application site. Exports shall include 3168 only nutrients removed from the watershed through products 3169 generated on the permitted application site. This prohibition 3170 does not apply to Class AA biosolids that are marketed and 3171 distributed as fertilizer products in accordance with department 3172 rule. 3173 6. The Department of Health shall require all entities 3174 disposing of septage within the Caloosahatchee River watershed 3175 to develop and submit to that agency an agricultural use plan 3176 that limits applications based upon nutrient loading consistent 3177 with any basin management action plan adopted pursuant to s. 3178 403.067. 3179 7. The Department of Agriculture and Consumer Services 3180 shall require entities within the Caloosahatchee River watershed 3181 which land-apply animal manure to develop a resource management 3182 system level conservation plan, according to United States 3183 Department of Agriculture criteria, which limit such 3184 application. Such rules shall include criteria and thresholds 3185 for the requirement to develop a conservation or nutrient 3186 management plan, requirements for plan approval, site inspection 3187 requirements, and recordkeeping requirements. 3188 8. The district shall initiate rulemaking to provide for a 3189 monitoring program for nonpoint source dischargers required to 3190 monitor water quality pursuant to s. 403.067(7)(b)2.g. or (c)3. 3191 The results of such monitoring must be reported to the 3192 coordinating agencies. 3193 (c) St. Lucie River Watershed Protection Plan.—The 3194 district, in cooperation with the other coordinating agencies, 3195 Martin County, and affected counties and municipalities shall 3196 complete a plan in accordance with this subsection. The St. 3197 Lucie River Watershed Protection Plan shall identify the 3198 geographic extent of the watershed, be coordinated as needed 3199 with the plans developed pursuant to paragraph (3)(a) and 3200 paragraph (a) of this subsection, and include the St. Lucie 3201 River Watershed Construction Project and St. Lucie River 3202 Watershed Research and Water Quality Monitoring Program. 3203 1. St. Lucie River Watershed Construction Project.—To 3204 improve the hydrology, water quality, and aquatic habitats 3205 within the watershed, the district shall, no later than January 3206 1, 2012, plan, design, and construct the initial phase of the 3207 Watershed Construction Project. In doing so, the district shall: 3208 a. Develop and designate the facilities to be constructed 3209 to achieve stated goals and objectives of the St. Lucie River 3210 Watershed Protection Plan. 3211 b. Identify the size and location of all such facilities. 3212 c. Provide a construction schedule for all such facilities, 3213 including the sequencing and specific timeframe for construction 3214 of each facility. 3215 d. Provide a schedule for the acquisition of lands or 3216 sufficient interests necessary to achieve the construction 3217 schedule. 3218 e. Provide a schedule of costs and benefits associated with 3219 each construction project and identify funding sources. 3220 f. To ensure timely implementation, coordinate the design, 3221 scheduling, and sequencing of project facilities with the 3222 coordinating agencies, Martin County, St. Lucie County, other 3223 interested parties, and other affected local governments. 3224 2. St. Lucie River Watershed Research and Water Quality 3225 Monitoring Program.—The district, in cooperation with the other 3226 coordinating agencies and local governments, shall establish a 3227 St. Lucie River Watershed Research and Water Quality Monitoring 3228 Program that builds upon the district’s existing research 3229 program and that is sufficient to carry out, comply with, or 3230 assess the plans, programs, and other responsibilities created 3231 by this subsection. The district shall also conduct an 3232 assessment of the water volumes and timing from Lake Okeechobee 3233 and the St. Lucie River watershed and their relative 3234 contributions to the timing and volume of water delivered to the 3235 estuary. 3236 (d) St. Lucie River Watershed Basin Management Action 3237 Plan.—The basin management action plan for the St. Lucie River 3238 watershed adopted pursuant to s. 403.067 shall be the St. Lucie 3239 River Watershed Pollutant Control Program and shall be designed 3240 to be a multifaceted approach to reducing pollutant loads by 3241 improving the management of pollutant sources within the St. 3242 Lucie River watershed through implementation of regulations and 3243 best management practices, development and implementation of 3244 improved best management practices, improvement and restoration 3245 of the hydrologic function of natural and managed systems, and 3246 use of alternative technologies for pollutant reduction, such as 3247 cost-effective biologically based, hybrid wetland/chemical and 3248 other innovative nutrient control technologies. As provided in 3249 s. 403.067(7)(a)6., the St. Lucie River Watershed Basin 3250 Management Action Plan must include milestones for 3251 implementation and water quality improvement, and an associated 3252 water quality monitoring component sufficient to evaluate 3253 whether reasonable progress in pollutant load reductions is 3254 being achieved over time. An assessment of progress toward these 3255 milestones shall be conducted every 5 years and shall be 3256 provided to the Governor, the President of the Senate, and the 3257 Speaker of the House of Representatives. Revisions to the plan 3258 shall be made, as appropriate, as a result of each 5-year 3259 review. Revisions to the basin management action plan shall be 3260 made by the department in cooperation with the basin 3261 stakeholders. Revisions to best management practices or other 3262 measures must follow the procedures set forth in s. 3263 403.067(7)(c)4. Revised basin management action plans must be 3264 adopted pursuant to s. 403.067(7)(a)5. The department shall 3265 develop an implementation schedule establishing 5-year, 10-year, 3266 and 15-year measurable milestones and targets to achieve the 3267 total maximum daily load no more than 20 years after adoption of 3268 the plan. The initial implementation schedule shall be used to 3269 provide guidance for planning and funding purposes and is exempt 3270 from chapter 120. Upon the first 5-year review, the 3271 implementation schedule shall be adopted as part of the plan. If 3272 achieving the total maximum daily load within 20 years is not 3273 practicable, the implementation schedule must contain an 3274 explanation of the constraints that prevent achievement of the 3275 total maximum daily load within 20 years, an estimate of the 3276 time needed to achieve the total maximum daily load, and 3277 additional 5-year measurable milestones, as necessary. The 3278 coordinating agencies shall facilitate the use of federal 3279 programs that offer opportunities for water quality treatment, 3280 including preservation, restoration, or creation of wetlands on 3281 agricultural lands. 3282 1. Nonpoint source best management practices consistent 3283 with s. 403.067, designed to achieve the objectives of the St. 3284 Lucie River Watershed Protection Program, shall be implemented 3285 on an expedited basis. The coordinating agencies may develop an 3286 intergovernmental agreement with local governments to implement 3287 the nonagricultural nonpoint source best management practices 3288 within their respective geographic boundaries. 3289 2. This subsection does not preclude the department or the 3290 district from requiring compliance with water quality standards, 3291 adopted total maximum daily loads, or current best management 3292 practices requirements set forth in any applicable regulatory 3293 program authorized by law for the purpose of protecting water 3294 quality. This subsection applies only to the extent that it does 3295 not conflict with any rules adopted by the department or 3296 district which are necessary to maintain a federally delegated 3297 or approved program. 3298 3. Projects that make use of private lands, or lands held 3299 in trust for Indian tribes, to reduce pollutant loadings or 3300 concentrations within a basin, or that reduce the volume of 3301 harmful discharges by one or more of the following methods: 3302 restoring the natural hydrology of the basin, restoring wildlife 3303 habitat or impacted wetlands, reducing peak flows after storm 3304 events, or increasing aquifer recharge, are eligible for grants 3305 available under this section from the coordinating agencies. 3306 4. The St. Lucie River Watershed Basin Management Action 3307 Plan shall require assessment of current water management 3308 practices within the watershed and shall require development of 3309 recommendations for structural, nonstructural, and operational 3310 improvements. Such recommendations shall consider and balance 3311 water supply, flood control, estuarine salinity, aquatic 3312 habitat, and water quality considerations. 3313 5. The department may not authorize the disposal of 3314 domestic wastewater biosolids within the St. Lucie River 3315 watershed unless the applicant can affirmatively demonstrate 3316 that the nutrients in the biosolids will not add to nutrient 3317 loadings in the watershed. This demonstration shall be based on 3318 achieving a net balance between nutrient imports relative to 3319 exports on the permitted application site. Exports shall include 3320 only nutrients removed from the St. Lucie River watershed 3321 through products generated on the permitted application site. 3322 This prohibition does not apply to Class AA biosolids that are 3323 marketed and distributed as fertilizer products in accordance 3324 with department rule. 3325 6. The Department of Health shall require all entities 3326 disposing of septage within the St. Lucie River watershed to 3327 develop and submit to that agency an agricultural use plan that 3328 limits applications based upon nutrient loading consistent with 3329 any basin management action plan adopted pursuant to s. 403.067. 3330 7. The Department of Agriculture and Consumer Services 3331 shall initiate rulemaking requiring entities within the St. 3332 Lucie River watershed which land-apply animal manure to develop 3333 a resource management system level conservation plan, according 3334 to United States Department of Agriculture criteria, which limit 3335 such application. Such rules shall include criteria and 3336 thresholds for the requirement to develop a conservation or 3337 nutrient management plan, requirements for plan approval, site 3338 inspection requirements, and recordkeeping requirements. 3339 8. The district shall initiate rulemaking to provide for a 3340 monitoring program for nonpoint source dischargers required to 3341 monitor water quality pursuant to s. 403.067(7)(b)2.g. or (c)3. 3342 The results of such monitoring must be reported to the 3343 coordinating agencies. 3344 (e) River Watershed Protection Plan implementation.—The 3345 coordinating agencies shall be jointly responsible for 3346 implementing the River Watershed Protection Plans, consistent 3347 with the statutory authority and responsibility of each agency. 3348 Annual funding priorities shall be jointly established, and the 3349 highest priority shall be assigned to programs and projects that 3350 have the greatest potential for achieving the goals and 3351 objectives of the plans. In determining funding priorities, the 3352 coordinating agencies shall also consider the need for 3353 regulatory compliance, the extent to which the program or 3354 project is ready to proceed, and the availability of federal or 3355 local government matching funds. Federal and other nonstate 3356 funding shall be maximized to the greatest extent practicable. 3357 (f) Evaluation.—Beginning March 1, 2020, and every 5 years 3358 thereafter, concurrent with the updates of the basin management 3359 action plans adopted pursuant to s. 403.067, the department, in 3360 cooperation with the other coordinating agencies, shall conduct 3361 an evaluation of any pollutant load reduction goals, as well as 3362 any other specific objectives and goals, as stated in the River 3363 Watershed Protection Programs. The district shall identify 3364 modifications to facilities of the River Watershed Construction 3365 Projects, as appropriate, or any other elements of the River 3366 Watershed Protection Programs. The evaluation shall be included 3367 in the annual progress report submitted pursuant to this 3368 section. 3369 (g) Priorities and implementation schedules.—The 3370 coordinating agencies are authorized and directed to establish 3371 priorities and implementation schedules for the achievement of 3372 total maximum daily loads, the requirements of s. 403.067, and 3373 compliance with applicable water quality standards within the 3374 waters and watersheds subject to this section. 3375 (5) ADOPTION AND IMPLEMENTATION OF TOTAL MAXIMUM DAILY 3376 LOADS AND DEVELOPMENT OF BASIN MANAGEMENT ACTION PLANS.—The 3377 department is directed to expedite development and adoption of 3378 total maximum daily loads for the Caloosahatchee River and 3379 estuary. The department is further directed to propose for final 3380 agency action total maximum daily loads for nutrients in the 3381 tidal portions of the Caloosahatchee River and estuary. The 3382 department shall initiate development of basin management action 3383 plans for Lake Okeechobee, the Caloosahatchee River watershed 3384 and estuary, and the St. Lucie River watershed and estuary as 3385 provided in s. 403.067 as follows: 3386 (a) Basin management action plans shall be developed as 3387 soon as practicable as determined necessary by the department to 3388 achieve the total maximum daily loads established for the Lake 3389 Okeechobee watershed and the estuaries. 3390 (b) The Phase II technical plan development pursuant to 3391 paragraph (3)(a), and the River Watershed Protection Plans 3392 developed pursuant to paragraphs (4)(a) and (c), shall provide 3393 the basis for basin management action plans developed by the 3394 department. 3395 (c) As determined necessary by the department to achieve 3396 the total maximum daily loads, additional or modified projects 3397 or programs that complement those in the legislatively ratified 3398 plans may be included during the development of the basin 3399 management action plan. 3400 (d) As provided in s. 403.067, management strategies and 3401 pollution reduction requirements set forth in a basin management 3402 action plan subject to permitting by the department under 3403 subsection (7) must be completed pursuant to the schedule set 3404 forth in the basin management action plan, as amended. The 3405 implementation schedule may extend beyond the 5-year permit 3406 term. 3407 (e) As provided in s. 403.067, management strategies and 3408 pollution reduction requirements set forth in a basin management 3409 action plan for a specific pollutant of concern are not subject 3410 to challenge under chapter 120 at the time they are 3411 incorporated, in an identical form, into a department or 3412 district issued permit or a permit modification issued in 3413 accordance with subsection (7). 3414 (6) ANNUAL PROGRESS REPORT.—Each March 1, the district, in 3415 cooperation with the other coordinating agencies, shall report 3416 on implementation of this section as part of the consolidated 3417 annual report required in s. 373.036(7). The annual report shall 3418 include a summary of the conditions of the hydrology, water 3419 quality, and aquatic habitat in the northern Everglades based on 3420 the results of the Research and Water Quality Monitoring 3421 Programs, the status of the Lake Okeechobee Watershed 3422 Construction Project, the status of the Caloosahatchee River 3423 Watershed Construction Project, and the status of the St. Lucie 3424 River Watershed Construction Project. In addition, the report 3425 shall contain an annual accounting of the expenditure of funds 3426 from the Save Our Everglades Trust Fund. At a minimum, the 3427 annual report shall provide detail by program and plan, 3428 including specific information concerning the amount and use of 3429 funds from federal, state, or local government sources. In 3430 detailing the use of these funds, the district shall indicate 3431 those designated to meet requirements for matching funds. The 3432 district shall prepare the report in cooperation with the other 3433 coordinating agencies and affected local governments. The 3434 department shall report on the status of the Lake Okeechobee 3435 Basin Management Action Plan, the Caloosahatchee River Watershed 3436 Basin Management Action Plan, and the St. Lucie River Watershed 3437 Basin Management Action Plan. The Department of Agriculture and 3438 Consumer Services shall report on the status of the 3439 implementation of the agricultural nonpoint source best 3440 management practices, including an implementation assurance 3441 report summarizing survey responses and response rates, site 3442 inspections, and other methods used to verify implementation of 3443 and compliance with best management practices in the Lake 3444 Okeechobee, Caloosahatchee River, and St. Lucie River 3445 watersheds. 3446 (7) LAKE OKEECHOBEE PROTECTION PERMITS.— 3447 (a) The Legislature finds that the Lake Okeechobee 3448 Watershed Protection Program will benefit Lake Okeechobee and 3449 downstream receiving waters and is in the public interest. The 3450 Lake Okeechobee Watershed Construction Project and structures 3451 discharging into or from Lake Okeechobee shall be constructed, 3452 operated, and maintained in accordance with this section. 3453 (b) Permits obtained pursuant to this section are in lieu 3454 of all other permits under this chapter or chapter 403, except 3455 those issued under s. 403.0885, if applicable. Additional 3456 permits are not required for the Lake Okeechobee Watershed 3457 Construction Project, or structures discharging into or from 3458 Lake Okeechobee, if such project or structures are permitted 3459 under this section. Construction activities related to 3460 implementation of the Lake Okeechobee Watershed Construction 3461 Project may be initiated before final agency action, or notice 3462 of intended agency action, on any permit from the department 3463 under this section. 3464 (c)1. Owners or operators of existing structures which 3465 discharge into or from Lake Okeechobee that were subject to 3466 Department Consent Orders 91-0694, 91-0705, 91-0706, 91-0707, 3467 and RT50-205564 and that are subject to s. 373.4592(4)(a) do not 3468 require a permit under this section and shall be governed by 3469 permits issued under ss. 373.413 and 373.416 and the Lake 3470 Okeechobee Basin Management Action Plan adopted pursuant to s. 3471 403.067. 3472 2. For the purposes of this paragraph, owners and operators 3473 of existing structures which are subject to s. 373.4592(4)(a) 3474 and which discharge into or from Lake Okeechobee shall be deemed 3475 in compliance with this paragraph if they are in full compliance 3476 with the conditions of permits under chapter 40E-63, Florida 3477 Administrative Code. 3478 3. By January 1, 2017, the district shall submit to the 3479 department a complete application for a permit modification to 3480 the Lake Okeechobee structure permits to incorporate proposed 3481 changes necessary to ensure that discharges through the 3482 structures covered by this permit are consistent with the basin 3483 management action plan adopted pursuant to s. 403.067. 3484 (d) The department shall require permits for district 3485 regional projects that are part of the Lake Okeechobee Watershed 3486 Construction Project. However, projects that qualify as exempt 3487 pursuant to s. 373.406 do not require permits under this 3488 section. Such permits shall be issued for a term of 5 years upon 3489 the demonstration of reasonable assurances that: 3490 1. District regional projects that are part of the Lake 3491 Okeechobee Watershed Construction Project shall achieve the 3492 design objectives for phosphorus required in subparagraph 3493 (3)(a)1.; 3494 2. For water quality standards other than phosphorus, the 3495 quality of water discharged from the facility is of equal or 3496 better quality than the inflows; 3497 3. Discharges from the facility do not pose a serious 3498 danger to public health, safety, or welfare; and 3499 4. Any impacts on wetlands or state-listed species 3500 resulting from implementation of that facility of the Lake 3501 Okeechobee Construction Project are minimized and mitigated, as 3502 appropriate. 3503 (e) At least 60 days before the expiration of any permit 3504 issued under this section, the permittee may apply for a renewal 3505 thereof for a period of 5 years. 3506 (f) Permits issued under this section may include any 3507 standard conditions provided by department rule which are 3508 appropriate and consistent with this section. 3509 (g) Permits issued under this section may be modified, as 3510 appropriate, upon review and approval by the department. 3511 (8) RESTRICTIONS ON WATER DIVERSIONS.—The South Florida 3512 Water Management District shall not divert waters to the St. 3513 Lucie River, the Indian River estuary, the Caloosahatchee River 3514 or its estuary, or the Everglades National Park, in such a way 3515 that the state water quality standards are violated, that the 3516 nutrients in such diverted waters adversely affect indigenous 3517 vegetation communities or wildlife, or that fresh waters 3518 diverted to the St. Lucie River or the Caloosahatchee or Indian 3519 River estuaries adversely affect the estuarine vegetation or 3520 wildlife, unless the receiving waters will biologically benefit 3521 by the diversion. However, diversion is permitted when an 3522 emergency is declared by the water management district, if the 3523 Secretary of Environmental Protection concurs. 3524 (9) PRESERVATION OF PROVISIONS RELATING TO THE EVERGLADES. 3525 Nothing in this section shall be construed to modify any 3526 provision of s. 373.4592. 3527 (10) RIGHTS OF SEMINOLE TRIBE OF FLORIDA.—Nothing in this 3528 section is intended to diminish or alter the governmental 3529 authority and powers of the Seminole Tribe of Florida, or 3530 diminish or alter the rights of that tribe, including, but not 3531 limited to, rights under the water rights compact among the 3532 Seminole Tribe of Florida, the state, and the South Florida 3533 Water Management District as enacted by Pub. L. No. 100-228, 101 3534 Stat. 1556, and chapter 87-292, Laws of Florida, and codified in 3535 s. 285.165, and rights under any other agreement between the 3536 Seminole Tribe of Florida and the state or its agencies. No land 3537 of the Seminole Tribe of Florida shall be used for water storage 3538 or stormwater treatment without the consent of the tribe. 3539 (11) RELATIONSHIP TO STATE WATER QUALITY STANDARDS.—Nothing 3540 in this section shall be construed to modify any existing state 3541 water quality standard or to modify the provisions of s. 3542 403.067(6) and (7)(a). 3543 (12) RULES.—The governing board of the district is 3544 authorized to adopt rules pursuant to ss. 120.536(1) and 120.54 3545 to implement the provisions of this section. 3546 (13) PRESERVATION OF AUTHORITY.—Nothing in this section 3547 shall be construed to restrict the authority otherwise granted 3548 to agencies pursuant to this chapter and chapter 403, and 3549 provisions of this section shall be deemed supplemental to the 3550 authority granted to agencies pursuant to this chapter and 3551 chapter 403. 3552 Section 38. For the purpose of incorporating the amendment 3553 made by this act to section 403.0872, Florida Statutes, in a 3554 reference thereto, section 403.0873, Florida Statutes, is 3555 reenacted to read: 3556 403.0873 Florida Air-Operation License Fee Account.—The 3557 “Florida Air-Operation License Fee Account” is established as a 3558 nonlapsing account within the Department of Environmental 3559 Protection’s Air Pollution Control Trust Fund. All license fees 3560 paid pursuant to s. 403.0872(11) shall be deposited in such 3561 account and must be used solely by the department and approved 3562 local programs under the advice and consent of the Legislature 3563 to pay the direct and indirect costs required to develop and 3564 administer the major stationary source air-operation permit 3565 program. Any approved local pollution control program that 3566 accepts funds from the department as reimbursement for services 3567 it performs in the implementation of the major source air 3568 operation permit program, receives delegation from the 3569 department or the United States Environmental Protection Agency 3570 for implementation of the major source air-operation permit 3571 program, or performs functions, duties, or activities 3572 substantially similar to or duplicative of the services 3573 performed by the department or the United States Environmental 3574 Protection Agency in the implementation of the major source air 3575 operation permit program is prohibited from collecting 3576 additional fees attributable to such services from any source 3577 permitted under s. 403.0872. 3578 Section 39. For the purpose of incorporating the amendment 3579 made by this act to section 403.1838, Florida Statutes, in a 3580 reference thereto, paragraph (d) of subsection (3) of section 3581 403.1835, Florida Statutes, is reenacted to read: 3582 403.1835 Water pollution control financial assistance.— 3583 (3) The department may provide financial assistance through 3584 any program authorized under 33 U.S.C. s. 1383, as amended, 3585 including, but not limited to, making grants and loans, 3586 providing loan guarantees, purchasing loan insurance or other 3587 credit enhancements, and buying or refinancing local debt. This 3588 financial assistance must be administered in accordance with 3589 this section and applicable federal authorities. 3590 (d) The department may make grants to financially 3591 disadvantaged small communities, as defined in s. 403.1838, 3592 using funds made available from grant allocations on loans 3593 authorized under subsection (4). The grants must be administered 3594 in accordance with s. 403.1838. 3595 Section 40. This act shall take effect July 1, 2026.

Texto oficial de la Legislatura de Florida. El formato se adaptó para leerlo en Ratifi.