Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

SB 126Sesión 2026

Qué cambió entre versiones

828 párrafos cambiaron+3494 palabras agregadas−652 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

Florida Senate

-

2026

CS for SB 126

By

Senator Gaetz

the Committee on Regulated Industries; and Senators Gaetz and

Bradley

1-00126A-26 2026126__580-01755A-26 2026126c1

1 A bill to be entitled

2 An act relating to the Florida Public Service

3 Commission; amending s. 350.01, F.S.; revising the

4 membership of the Florida Public Service Commission;

5 creating s. 350.1290615, F.S.; requiring thata ordersgroup of

6 parties to certain proceedings to negotiate the terms

7 of a settlement with the Public Counsel before

8 presenting such settlement to the commission; creating

9 s. 350.129, F.S.; requiring that orders issued by the

610 issued by the commission contain adequate support and rationale for

711 rationale for any conclusions made by the commission; requiring the

812 requiring the commission to provide an explanation and a discussion

913 a discussion of major elements and the rationale of the settlement when

1014 issuingwhen the commission issues an order accepting or denying certain

1115 denying certain settlement agreements; amendingproviding s. 366.06, F.S.;that

16 the Public Counsel is not a required party to any such

17 settlements; prohibiting the commission from approving

18 certain settlements that are not negotiated with the

19 Public Counsel; creating s. 350.130, F.S.; authorizing

20 certain persons to make a motion to intervene in a

21 pending commission proceeding; providing requirements

22 for an association’s motion to intervene in certain

1223 commission proceedings; requiring the commission to ensure that the allowable

24 make certain rulings in a specified timeframe to avoid

25 certain expenses; creating s. 350.131, F.S.; requiring

26 the commission to consider and address the

1327 returnaffordability onof equityproceedings doesthat nothave exceed the national averagecertain

28 potential impacts; amending s. 366.06, F.S.;

29 authorizing the commission to fix affordable, in

30 addition to fair, just, and reasonable, rates;

31 requiring that certain applications for changes in

32 rates be made according to a certain schedule and

33 procedure; requiring that certain requests for a

1434 authorizedchange in return on equity forbe comparablemade publicaccording to a

35 certain schedule and procedure; conforming provisions

36 to changes made by the act; providing requirements for

37 any financial model used by the commission to set and

38 evaluate the return on equity for a public utility;

39 requiring the commission to consider and address

40 certain financial benefits and reductions of certain

41 risks provided by specified cost financing systems or

1542 utilities;other amendingprocesses s.when 366.07,setting F.S.;and requiringevaluating the return

43 on equity for a public utility; amending s. 366.07,

44 F.S.; conforming provisions to changes made by the

1645 act; requiring the commission to establish a schedule by which rate

46 by which requests for changes to a public utility’s

1747 changereturn requestson equity may be submitted to the commission by

1848 each public utility company; creatingprohibiting s. 366.077,the

49 commission from accepting certain requests from a

50 public utility to modify its return on equity outside

51 of its schedule; providing an exception; authorizing a

52 public utility to petition the commission to deviate

53 from the return on equity revision schedule; requiring

54 the commission to grant the petition under certain

1955 F.S.circumstances; requiring the commission to provide a report toadopt

56 rules; creating s. 366.077, F.S.; requiring the

57 commission to provide a report to the Governor and the

2058 the Governor and the Legislature by a specified date annually; providing

2159 annually; providing requirements for the report; creating s. 366.8261,

22 amending s. 377.814, F.S.; conforming a cross

60 F.S.; defining terms; requiring the commission to

2361 reference; providingpermit an effectiveelectric date.utility to implement a certain

24

25 Be It Enacted by the Legislature of the State of Florida:

26

62 charge within a specified timeframe after the electric

2763 Sectionutility 1. Subsectionfiles (1)a ofcertain section 350.01petition, Floridasubject to specified

28 Statutes, is amended to read:

64 conditions; requiring the commission to establish a

65 recovery period for interim storm-recovery costs,

66 based upon a reasonable balancing of certain factors;

67 subjecting certain funds to true-up; providing

68 construction; requiring the commission to adopt rules;

69 amending s. 367.081, F.S.; providing requirements for

2970 350.01 Floridafinancial Publicmodels Serviceused Commission;by termsthe ofcommission in setting and

30 commissioners; vacancies; election and duties of chair; quorum;

31 proceedings; public records and public meetings exemptions.—

32 (1) The Florida Public Service Commission shall

71 evaluating the return on equity for a utility;

72 conforming provisions to changes made by the act;

73 amending s. 377.814, F.S.; conforming a cross

74 reference; providing an effective date.

75

76 Be It Enacted by the Legislature of the State of Florida:

77

78 Section 1. Subsection (1) of section 350.01, Florida

79 Statutes, is amended to read:

80 350.01 Florida Public Service Commission; terms of

81 commissioners; vacancies; election and duties of chair; quorum;

82 proceedings; public records and public meetings exemptions.—

83 (1) The Florida Public Service Commission shall

be composed

33

84

consist

3 párrafos sin cambios

of

seven

five

commissioners appointed pursuant to s.

3485 350.031.

One member must be a certified public accountant, and

35

86

one member must be a chartered financial analyst.

3687 Section 2. Section 350.1290615, Florida Statutes, is created to

3788 to read:

3889

350.129

Orders of the Florida Public Service Commission

.—

350.0615 Public Counsel; requirement to negotiate.—For

3990

proceedings before the commission in which the Public Counsel is

91

participating as a party, any other group of parties to the

92

proceeding, before presenting a settlement of the proceeding to

93

the commission, must negotiate in good faith with the Public

94

Counsel the terms of such settlement.

95 Section 3. Section 350.129, Florida Statutes, is created to

96 read:

97

350.129 Orders of the Florida Public Service Commission.—

98

(1) All orders issued by the commission must contain

40

99

adequate support and rationale for the commission’s conclusions,

41

100

including the specific facts and factors on which the

42

101

conclusions are based. While the commission may make conclusions

43

102

based upon the public interest, asit providedshall specify in chaptersits 350-368,orders a

44

103

it shall specify in its orders a rationale for such conclusions.

45

104

(2) For commission orders that affect substantial interests

46

105

pursuant to s. 120.569, when issuing an order accepting or

47

106

denying a settlement agreement reached by any of the parties to

48

107

a proceeding, all of the following requirements apply:

108

(a)

a proceeding, theThe commission shall provide a reasoned explanation,

49

109

explanation, citing the specific facts and factors on which it relied.

50

The

110

relied. In addition, the commission shall provide in its order a discussion of the major

51

111

discussion of the major elements of the settlement and a rationale for its conclusions.

52

rationale for its conclusions.

53 Section 3. Present subsection (4) of section 366.06,

54 Florida Statutes, is redesignated as subsection (5), and a new

55 subsection (4) is added to that section, to read:

56 366.06 Rates; procedure for fixing and changing.—

57

(4) In order to best meet the needs of Florida households,

58

the commission shall

ensure that the

allowable return on equity

59

for public utilities does not exceed the national average

60

authorized return on equity for comparable public utilities

61

across the country

.

62 Section 4. Section 366.07, Florida Statutes, is amended to

63 read:

64 366.07 Rates; adjustment.—

65

112

(b)

The Public Counsel is not a required party to such a

113

settlement. However, the commission may not approve a settlement

114

presented by parties that have not negotiated the terms of such

115

settlement in good faith with the Public Counsel.

116 Section 4. Section 350.130, Florida Statutes, is created to

117 read:

118

350.130 Intervention into commission proceedings.—Persons

119

other than the original parties to a pending commission

120

proceeding, whose substantial interest will be affected by the

121

commission proceeding

and who desire to become parties to the

122

proceeding, may make a motion to the commission for leave to

123

intervene in the proceeding pursuant to chapter 120.

124

(1) Any trade, professional, or similar association seeking

125

to intervene in a commission proceeding on the basis of the

126

impact of such proceeding on the association’s membership must

127

include in such motion the nature of the association’s

128

membership, the manner in which such membership will be

129

substantially impacted by the proceeding, and the number and

130

percentage of total members who will be substantially impacted

131

by the proceeding.

132

(2) In order to avoid any unnecessary rate case expense

133

resulting from a party participating in a proceeding in which it

134

does not have standing, the commission shall rule on any

135

challenge to a party’s intervention in a proceeding on the basis

136

of standing on a timely basis and, at

a

minimum, within 30 days

137

after receiving such challenge.

138 Section 5. Section 350.131, Florida Statutes, is created to

139 read:

140

350.131

Affordability.—The commission must consider and

141

address affordability in any proceeding before it that has the

142

potential to impact utility rates.

143 Section 6. Present subsection (4) of section 366.06,

144 Florida Statutes, is redesignated as subsection (5), a new

145 subsection (4) is added to that section, and subsections (1) and

146 (2) of that section are amended, to read:

147 366.06 Rates; procedure for fixing and changing.—

148 (1) A public utility shall not, directly or indirectly,

149 charge or receive any rate not on file with the commission for

150 the particular class of service involved, and no change shall be

151 made in any schedule. All applications for changes in rates

152 shall be made to the commission in writing under rules and

153 regulations prescribed, and the commission shall have the

154 authority to determine and fix

affordable,

fair, just, and

155 reasonable rates that may be requested, demanded, charged, or

156 collected by any public utility for its service.

Any application

157

for a change in rates which also includes a request for a change

158

in return on equity must be made according to the schedule and

159

procedure established by the commission pursuant to s. 366.07.

160 The commission shall investigate and determine the actual

161 legitimate costs of the property of each utility company,

162 actually used and useful in the public service, and shall keep a

163 current record of the net investment of each public utility

164 company in such property which value, as determined by the

165 commission, shall be used for ratemaking purposes and shall be

166 the money honestly and prudently invested by the public utility

167 company in such property used and useful in serving the public,

168 less accrued depreciation, and shall not include any goodwill or

169 going-concern value or franchise value in excess of payment made

170 therefor. In fixing

affordable,

fair, just, and reasonable rates

171 for each customer class, the commission shall, to the extent

172 practicable, consider the cost of providing service to the

173 class, as well as the rate history, value of service, and

174 experience of the public utility; the consumption and load

175 characteristics of the various classes of customers; and public

176 acceptance of rate structures.

177 (2) Whenever the commission finds, upon request made or

178 upon its own motion, that the rates demanded, charged, or

179 collected by any public utility for public utility service, or

180 that the rules, regulations, or practices of any public utility

181 affecting such rates, are

unaffordable,

unjust, unreasonable,

182 unjustly discriminatory, or in violation of law; that such rates

183 are insufficient to yield reasonable compensation for the

184 services rendered; that such rates yield excessive compensation

185 for services rendered; or that such service is inadequate or

186 cannot be obtained, the commission shall order and hold a public

187 hearing, giving notice to the public and to the public utility,

188 and shall thereafter determine

affordable,

just

,

and reasonable

189 rates to be thereafter charged for such service and promulgate

190 rules and regulations affecting equipment, facilities, and

191 service to be thereafter installed, furnished, and used.

Any

192

request made by a public utility pursuant to this section which

193

involves a request for a change in return on equity must be made

194

according to the schedule and procedure established by the

195

commission pursuant to s. 366.07.

196

(4) In setting and evaluating the return on equity for a

197

public utility as part of a rate proceeding:

198

(a) Any financial model used by the commission must be:

199

1. Financially logical; and

200

2. Generally used and accepted by finance practitioners

201

both within and outside of the regulated utility industry; and

202

(b) The commission shall specifically consider and address

203

the financial benefits and the reduction in regulatory, weather,

204

disaster, and general financial risk to the public utility

205

provided by all of the following which are relevant to the

206

public utility:

207

1. Environmental cost recovery under s. 366.8255.

208

2. Storm-recovery financing under s. 366.8260.

209

3. Interim storm-recovery cost recovery under s. 366.8261.

210

4. Cost recovery for the siting, design, licensing, and

211

construction of nuclear and integrated gasification combined

212

cycle power plants under s. 366.93.

213

5. Financing for certain nuclear generating asset

214

retirement or abandonment costs under s. 366.95.

215

6. Storm protection plan cost recovery under s. 366.96.

216

7. Public utility liability arising out of emergencies and

217

disasters under s. 366.98.

218

8. Natural gas facilities relocation costs under s. 366.99.

219 Section 7. Section 366.07, Florida Statutes, is amended to

220 read:

221 366.07 Rates; adjustment.—

222

(1)

Whenever the commission, after public hearing either

66223 upon its own motion or upon complaint, shall find the rates,

67224 rentals, charges or classifications, or any of them, proposed,

68225 demanded, observed, charged or collected by any public utility

69226 for any service, or in connection therewith, or the rules,

70227 regulations, measurements, practices or contracts, or any of

71228 them, relating thereto, are unjust, unreasonable, insufficient,

unaffordable

,

unjust, unreasonable,

72229 insufficient, excessive, or unjustly discriminatory or preferential, or in

73230 preferential, or in anywise in violation of law, or any service is inadequate or

74231 is inadequate or cannot be obtained, the commission shall determine and by order

232 determine and by order fix the

affordable,

fair

,

and reasonable

75233 fix the fair and reasonable rates, rentals, charges or classifications, and reasonable

76 classifications, and reasonable rules, regulations,

77234 rules, regulations, measurements, practices, contracts or service, to be imposed,

78235 service, to be imposed, observed, furnished or followed in the future.

79

236 future.

237

(2)

The

commission

The commission shall establish a schedule by which

a schedule

by which

rate

80

change requests

may

be submitted

238

requests for changes to a public utility’s return on equity may

239

be submitted to the commission by each public utility. The

by each

81

public utility company.

82 Section 5. Section 366.077, Florida Statutes, is created to

83 read:

84

366.077 Report on rates.—The commission shall

submit

an

85

annual report

to

the Governor and the Legislature by March 1.

86

240

commission may not accept a request from a public utility to

241

modify its return on equity outside of this established

242

schedule, except as provided in subsection (3).

243

(3)

A public utility may petition the commission to deviate

244

from the return on equity revision schedule established by the

245

commission under subsection (2). The commission shall grant such

246

petition if:

247

(a)

The public utility’s

rates are insufficient to yield

248

reasonable compensation for the services it is rendering;

249

(b)

This insufficiency is due to circumstances that are

250

outside of the control of the public utility; and

251

(c)

Such circumstances were not reasonably foreseeable by

252

the public utility during the last proceeding in which its

253

return on equity was approved by the commission.

254

(4)

The commission shall adopt rules to implement this

255

section.

256 Section 8. Section 366.077, Florida Statutes, is created to

257 read:

258

366.077 Report on rates.—The commission shall submit an

259

annual report to the Governor and the Legislature by March 1.

260

(1)

The report must include all of the following:

87

261

(a)

An investigation of contemporary economic analyses

economic analys

e

s

88

related to

262

related to rate changes in this state.

.

89

263

(b)

An analysis of potential cost impacts to utility

cost impact

s

to utility

90

customers

in this state

264

customers in this state if excess returns on equity have

91

occurred and

265

occurred and, if such excess returns have not occurred at a

92

significant rate,

any resulting

cost savings to

such

customers.

93

266

significant rate, any resulting cost savings to such customers.

267

(c)

An analysis of returns on equity models presented by

94

268

public utilities and used by the commission to determine

95

269

approved returns on equity for public utilities in this state.

96

270

Such analysis must:

97

271

1.

Compare models used by federal agencies and other state

98

272

utility regulatory bodies with those used by the commission;

99

273

2.

Determine whether the models used are generally

100

274

financially logical; and

101

275

3.

Determine whether the models used comport with generally

102

276

accepted economic theory both inside and outside of the utility

103

277

industry.

104

278

(d)

An assessment

of

An assessment of long-term impacts, including the

, including the

105

279

economic repercussions of rising rates of returns on equity, to

of

rising rates of returns on equity

,

to

106

280

utilities and their future customers.

in the future

.

107

281

(e)

A summary

A summary providing detailed information regarding the

108

282

compensation of the executive officers of each public utility

109

283

providing service to the residents of this state, or the

110

284

executive officers of a public utility’s affiliated companies or

111

285

parent company. Such information must include, but need not be

112

limited to,

286

limited to, salaries, benefits, stock options, bonuses, stock

113

buybacks

,

287

buybacks, and other taxable payments, expressed both as dollar

expressed both

as dollar

114

amounts and as a

288

amounts and as a percentage of the entity’s total revenue. The

. The

115

summary

must include

the

289

summary must include the profits and losses of each entity as

of each entity as

116

290

reported in its financial statements and highlight any

a

nd

highlight any

117

compensation

that exceeds the

industry average

. The commission

118

291

compensation that exceeds the industry average. The commission

292

shall also include any rationale provided by a public utility

119

293

justifying compensation exceeding the industry average and, for

120

294

each public utility, an explanation as to howthe specificmanner datain which

121

295

specific data gathered during the compiling of information

inform

ed

the

122

commission’s

decisions

296

informed the commission’s decisions on the public utility’s rate

297

change requests.

123

requests.

124

298

(2)

The report

must

The report must provide benchmarking, comparing public

,

comparing

public

125

utilities

299

utilities providing service to the residents of this state with

126

300

public utilities providing service to the residents of other

other

127

states

, and include

commentary

301

states, and include commentary on all findings.

.

128302 Section 69. ParagraphSection (b)366.8261, ofFlorida subsectionStatutes, (5)is of sectioncreated

129 377.814, Florida Statutes, is amended to read:

130 377.814 Municipal Solid Waste-to-Energy Program.—

131 (5) FUNDING.—

132 (b) Funds awarded under the grant programs set forth in

133 this section may not be used to support, subsidize, or enable

134 the sale of electric power generated by a municipal solid waste

135 to-energy facility to any small electric utility eligible to

136 petition the commission under

303 to read:

304

366.8261

Interim storm-recovery cost.—

305

(1) As used in this section, the term:

306

(a) “Electric utility” has the same meaning as in s.

307

366.8255.

308

(b) “Storm” has the same meaning as in s. 366.8260.

309

(c) “Storm-recovery charge” has the same meaning as in s.

310

366.8260.

311

(d) “Storm-recovery costs” has the same meaning as in s.

312

366.8260.

313

(2) The commission shall permit an electric utility to

314

implement a storm-recovery charge to recover reasonably

315

estimated storm-recovery costs within 60 days after filing a

316

petition with the commission for the recovery from one or more

317

storms, subject to all of the following conditions:

318

(a)

Such charge must be on an interim basis. The

319

commission’s approval of interim storm-recovery costs and a

320

related storm-recovery charge must be on a preliminary basis and

321

is subject to refund pending further review once the total

322

actual storm-recovery costs are known. After the actual costs

323

are reviewed for prudence and reasonableness and are compared to

324

the actual amount recovered through the interim storm-recovery

325

charge, the commission shall determine whether any over or under

326

recovery has occurred. The disposition of any over or under

327

recovery, and associated interest, must be considered by the

328

commission at a separate true-up proceeding.

329

(b) Storm-recovery costs may not include any expenses

330

already being recovered by the utility in its base rates.

331

(c)

The commission may require a utility to secure funds

332

collected pursuant to this section to ensure timely refund to

333

customers in the event of over recovery.

334

(3) In approving an application for interim storm-recovery

335

costs pursuant to subsection (2), the commission shall also

336

establish a recovery period for such interim costs. This

337

recovery period shall be based upon a reasonable balancing of

338

all of the following factors:

339

(a) The financial impact of the length of the recovery

340

period on the utility.

341

(b)

Timeliness of recovery.

342

(c) Affordability to ratepayers.

343

(d)

Avoiding sudden substantial bill increases to

344

ratepayers.

345

(4) Funds collected pursuant to this section are subject to

346

true-up. The commission shall require that any refund to or

347

additional collection from ratepayers made as a part of the

348

true-up include interest.

349

(5) Nothing in this section shall be construed to prevent a

350

public utility from applying for, or the commission approving,

351

storm-recovery financing pursuant to s. 366.8260.

352

(6) The commission shall adopt rules to implement this

353

section as soon as practicable, but no later than January 1,

354

2027.

355 Section 10. Paragraph (a) of subsection (2) and subsection

356 (3) of section 367.081, Florida Statutes, are amended to read:

357 367.081 Rates; procedure for fixing and changing.—

358 (2)(a)1. The commission shall, either upon request or upon

359 its own motion, fix rates which are

affordable,

just,

360 reasonable, compensatory, and not unfairly discriminatory. In

361 every such proceeding, the commission shall consider the value

362 and quality of the service and the cost of providing the

363 service, which shall include, but not be limited to, debt

364 interest; the requirements of the utility for working capital;

365 maintenance, depreciation, tax, and operating expenses incurred

366 in the operation of all property used and useful in the public

367 service; and a fair return on the investment of the utility in

368 property used and useful in the public service. However, the

369 commission shall not allow the inclusion of contributions-in

370 aid-of-construction in the rate base of any utility during a

371 rate proceeding, nor shall the commission impute prospective

372 future contributions-in-aid-of-construction against the

373 utility’s investment in property used and useful in the public

374 service; and accumulated depreciation on such contributions-in

375 aid-of-construction shall not be used to reduce the rate base,

376 nor shall depreciation on such contributed assets be considered

377 a cost of providing utility service.

378 2. For purposes of such proceedings, the commission shall

379 consider utility property, including land acquired or facilities

380 constructed or to be constructed within a reasonable time in the

381 future, not to exceed 24 months after the end of the historic

382 base year used to set final rates unless a longer period is

383 approved by the commission, to be used and useful in the public

384 service, if:

385 a. Such property is needed to serve current customers;

386 b. Such property is needed to serve customers 5 years after

387 the end of the test year used in the commission’s final order on

388 a rate request as provided in subsection (6) at a growth rate

389 for equivalent residential connections not to exceed 5 percent

390 per year; or

391 c. Such property is needed to serve customers more than 5

392 full years after the end of the test year used in the

393 commission’s final order on a rate request as provided in

394 subsection (6) only to the extent that the utility presents

395 clear and convincing evidence to justify such consideration.

396

397 Notwithstanding the provisions of this paragraph, the commission

398 shall approve rates for service which allow a utility to recover

399 from customers the full amount of environmental compliance

400 costs. Such rates may not include charges for allowances for

401 funds prudently invested or similar charges. For purposes of

402 this requirement, the term “environmental compliance costs”

403 includes all reasonable expenses and fair return on any prudent

404 investment incurred by a utility in complying with the

405 requirements or conditions contained in any permitting,

406 enforcement, or similar decisions of the United States

407 Environmental Protection Agency, the Department of Environmental

408 Protection, a water management district, or any other

409 governmental entity with similar regulatory jurisdiction.

410 (3) The commission, in fixing rates, may determine the

411 prudent cost of providing service during the period of time the

412 rates will be in effect following the entry of a final order

413 relating to the rate request of the utility and may use such

414 costs to determine the revenue requirements that will allow the

415 utility to earn a fair rate of return on its rate base.

Any

416

financial model used by the commission in setting and evaluating

417

the return on equity for a utility as part of a proceeding

418

fixing rates must be:

419

(a) Financially logical; and

420

(b) Generally used and accepted by finance practitioners

421

both within and outside of the regulated utility industry.

422 Section 11. Paragraph (b) of subsection (5) of section

423 377.814, Florida Statutes, is amended to read:

424 377.814 Municipal Solid Waste-to-Energy Program.—

425 (5) FUNDING.—

426 (b) Funds awarded under the grant programs set forth in

427 this section may not be used to support, subsidize, or enable

428 the sale of electric power generated by a municipal solid waste

429 to-energy facility to any small electric utility eligible to

430 petition the commission under

s. 366.06(5)

s. 366.06(4)

.

137431 Section 712. This act shall take effect July 1, 2026.

Volver al texto completo