Florida Senate
-
2025
CS for CS for SB 592
By
the Committees on Regulated Industries; and Banking and
the Committee on Banking and Insurance; and SenatorSenators Leek and Pizzo
597-02094-25580-02871-25 2025592c12025592c2
1 A bill to be entitled
2 An act relating to the My Safe Florida Condominium
3 Pilot Program; amending s. 215.55871, F.S.; revisinglimiting
4 theparticipation definition ofin the termMy “condominium”;Safe limitingFlorida Condominium Pilot
5 Program to certain structures or buildings; revising
6 the approval requirements to receive a mitigation
7 grant; deleting the amount of grant funding designated
8 for certain projects; revising the improvements for
9 which a grant may be used; requiring that improvements
10 be verified during the final hurricane mitigation
11 inspection to qualify for grant funds; specifying that
512 participationmitigation ingrants themay Mybe Safeawarded Floridaonly Condominiumfor Pilotmitigation
13 improvements that will result in a mitigation credit,
614 Programdiscount, toor certainother condominiumsrate differential; revisingrequiring the approval
15 Department of Financial Services to require that
716 requirementscertain toimprovements receivebe amade mitigationunder grant; deletingcertain
8 the amount of grant funding designated for certain
9 projects; revising the improvements for which a grant
10 may be used; requiring that improvements be verified
11 during the final hurricane mitigation inspection to
12 qualify for grant funds; specifying that mitigation
13 grants may be awarded only for mitigation improvements
14 that will result in a mitigation credit, discount, or
15 other rate differential; requiring the Department of
1617 Financialcircumstances; Servicesproviding toan requireeffective that certaindate.
17 improvements be made under certain circumstances;
18 providing an effective date.
1918
2019 Be It Enacted by the Legislature of the State of Florida:
2120
2221 Section 1. Present paragraphs (a) through (d) of subsection
2322 (2) of section 215.55871, Florida Statutes, are redesignated as
2423 paragraphs (b) through (e), respectively, a new paragraph (a) is
2524 added to that subsection, and present paragraph (db) of subsection (1),
2625 present paragraph (b) of subsection (2), and subsection (5) of that section are amended,
27 that section are amended, to read:
26 to read:
2827 215.55871 My Safe Florida Condominium Pilot Program.—There
2928 is established within the Department of Financial Services the
3029 My Safe Florida Condominium Pilot Program to be implemented
3130 pursuant to appropriations. The department shall provide fiscal
3231 accountability, contract management, and strategic leadership
3332 for the pilot program, consistent with this section. This
3433 section does not create an entitlement for associations or unit
3534 owners or obligate the state in any way to fund the inspection
3635 or retrofitting of condominiums in the state. Implementation of
3736 this pilot program is subject to annual legislative
3837 appropriations. It is the intent of the Legislature that the My
3938 Safe Florida Condominium Pilot Program provide licensed
4039 inspectors to perform inspections for and grants to eligible
4140 associations as funding allows.
4241 (12) DEFINITIONSPARTICIPATION.—As used in this section, the term:
43 (d) “Condominium” has the same meaning as in s. 718.103.
42
(a) Participation in the pilot program is limited to
43
structures or buildings on the condominium property
which
are
44
For purposes of this section, the term does not include detached
three or more stories in height
,
provided that each structure or
45
units on individual parcels of land.
46 (2) PARTICIPATION.—
building that is the subject of the mitigation grant contain
s
46
two or more single-family dwellings.
47
(a) Participation in the pilot program is limited to
48
condominiums that are three stories or more in height
,
and the
49
structure or building that is the subject of the mitigation
50
grant must include at least one residential unit within such
51
structure or building.
52
(c)
(b)
In order to apply for a grant under subsection (5)
5348 which improves one or more units within a condominium, an
5449 association must receive both of the following:
5550 1. Approval by a majority vote of the board of
5651 administration or a majority vote of the total voting interests
5752 of the association to participate in a mitigation inspection.
5853 2.
Approval by at least 75 percent
A unanimous vote
of all
59 unit owners
54
persons with
voting interests
who reside
unit owners
within the
within the 55 structure or building that is the subject of the mitigation
56 grant.
57 (5) MITIGATION GRANTS.—Financial grants may be used by
58 associations to make improvements recommended in a hurricane
59 mitigation inspection report which increase the condominium’s
60 resistance to hurricane damage.
60 the61 (a) An subjectapplication offor thea mitigation grant. must:
61 (5) MITIGATION GRANTS.—Financial grants may be used by
62 associations to make improvements recommended in a hurricane
63 mitigation inspection report which increase the condominium’s
64 resistance to hurricane damage.
62 1. Contain a signed or electronically verified statement
63 made under penalty of perjury by the president of the board of
64 administration that the association has submitted only a single
65 (a) An application for aeach mitigationproperty grantthat must:the association operates or
66 maintains.
6667 12. ContainInclude a signed or electronically verifiednotarized statement from the president of the
68 board of administration containing the name and license number
69 of each contractor the association intends to use for the
70 mitigation project.
67 made71 3. Include undera penaltynotarized ofstatement perjury byfrom the president of the board of
68 administration that the association has submitted only a single
69 application for each property that the association operates or
70 maintains.
72 board of administration which commits to the department that the
73 association will complete the mitigation improvements. If the
74 grant will be used to improve units, the application must also
71 2. Include75 include aan notarizedacknowledged statement from theeach presidentunit ofowner thewho is
72 board of administration containing the name and license number
73 of each contractor the association intends to use for the
74 mitigation project.
75 3. Include a notarized statement from the president of the
76 board of administration which commits to the department that the
77 association will complete the mitigation improvements. If the
78 grant will be used to improve units, the application must also
79 include an acknowledged statement from each unit owner who is
8076 required to provide approval for a grant under paragraph
(2)(c)
81
77
(2)(b)
.
8278 (b) An association may select its own contractors for the
8379 mitigation project as long as each contractor meets all
8480 qualification, certification, or licensing requirements in
8581 general law. A mitigation project must be performed by a
8682 properly licensed contractor who has secured all required local
8783 permits necessary for the project. The department must
8884 electronically verify that the contractor’s state license number
8985 is accurate and up to date before approving a grant application.
9086 (c) An association awarded a grant must complete the entire
9187 mitigation project in order to receive the final grant award and
9288 must agree to make the property available for a final inspection
9389 once the mitigation project is finished to ensure the mitigation
9490 improvements are completed in a manner consistent with the
9591 intent of the pilot program and meet or exceed the applicable
9692 Florida Building Code requirements. Construction must be
9793 completed and the association must submit a request to the
9894 department for a final inspection, or request an extension of
9995 time, within 1 year after receiving grant approval. If the
10096 association fails to comply with this paragraph, the application
10197 is deemed abandoned and the grant money reverts back to the
10298 department.
10399 (d) Grant projects shall be funded as follows:
104100 1. All grants must be matched on the basis of $1 provided
105101 by the association for $2 provided by the state
toward the
106102
actual cost of the project
.
103
2. For roof-related projects, the grant contribution is $11
104
per square foot multiplied by the square footage of the
105
replacement roof, not to exceed $1,000 per unit, with a maximum
106
grant award of 50 percent of the cost of the project.
107
23. For roof-relatedopening protection-related projects, the grant contribution is $11
108
per square foot multiplied by the square footage of the
contribution is a maximum of $750 per replacement window or
109
replacement roofdoor, not to exceed $1,000500 per unit, with a maximum grant award
110
grant award of 50 percent of the cost of the project.
111
3. For opening protection-related projects, the grant
112
contribution is a maximum of $750 per replacement window or
113
door, not to exceed $1,500 per unit, with a maximum grant award
114
of 50 percent of the cost of the project.
115
2.
4.
An association may receive grant funds for both roof
116112 related and opening protection-related projects, but the maximum
117113 total grant award may not exceed $175,000 per association.
118114
3.
5.
The department may not accept grant applications or
119115 maintain a waiting list for grants after the cumulative value of
120116 the grants awarded have fully obligated the appropriation,
121117 unless otherwise expressly authorized by the Legislature.
122118 (e) When recommended by a hurricane mitigation inspection
123119 report, grants for eligible associations may be used for the
124120 following improvements:
125121 1. Opening protection
improvements
, including
all of the
126122
following:
127123
a.
Exterior doors
.
,
128124
b.
Garage doors
.
,
129125
c.
Windows
.
, and
130
126
d.
Skylights.
131
127
e.
Wind-driven rain mitigation devices for sliding glass
128
doors.
129
2. Roof-related improvements,
including all of the
132130
following
:
133131
a.
2.
Reinforcing roof-to-wall connections.
134132
b.
3.
Improving the strength of roof-deck attachments.
135133
c.
4.
Installing
secondary water resistance for roof.
136134
d.
Replacing the roof covering
.
137135 (f)
Improvements must be
verified during
the final
138136
hurricane mitigation inspection to
qualify for
grant funds
139137
Grants may be used for a previously inspected existing structure
140
138
on the property
.
141139 (g)
1.
If improvements to protect the property which
142140 complied with the current applicable building code at the time
143141 have been previously installed, the association must use a
144142 mitigation grant to install improvements that do both of the
145143 following:
146144
1.
a.
Comply with or exceed the applicable building code in
147145 effect at the time the association applied for the grant.
148146
2.
b.
Provide more hurricane protection than the
149147 improvements that the association previously installed.
150
148
(
3 párrafos sin cambios
h
)
2.
The association may not use a mitigation grant to:
151
149
1.
a.
Install the same type of improvements that were
152150 previously installed; or
153151
2.
b.
Pay a deductible for a pending insurance claim for
154152 damage that is part of the property for which grant funds are
155153 being received.
156154
(
3 párrafos sin cambios
i
)
(h)
The department shall develop a process that ensures
157155 the most efficient means to collect and verify inspection and
158156 grant applications to determine eligibility. The department may
159157 direct hurricane mitigation inspectors to collect and verify
160158 inspection and grant application information or use the Internet
161159 or other electronic means to collect information and determine
162160 eligibility.
163161
(
j
)
Grant funds may be awarded only for each mitigation
162
improvement that, when applied to the structure or building,
163
will result in a mitigation credit, discount, or other rate
164
improvement that, when applied to the structure or building,
differential. If necessary for the building or structure to
165
willqualify result infor a mitigation credit, discount, or other rate
166
differential. If necessary for the building or structure to
167
qualify for a mitigation credit, discount, or other rate
168
differential
, the department must require that improvements be
167
made to all openings, including exterior doors, garage doors,
168
windows, and skylights, as a condition of reimbursing a
169
made to all openings, including exterior doors, garage doors,
170
windows, and skylights, as a condition of reimbursing a
171
condominium association approved for a grant.
172170 Section 2. This act shall take effect July 1, 2025.