1 A bill to be entitled

2 An act relating to localimpact governmentfees; amending s. 163.3164,

3 F.S.; defining the term “plan-based methodology”;

4 amending s. 163.31801, F.S.; defining the term

35 125.022,“extraordinary F.S.circumstances”; prohibiting a county from requiring anthe

6 completion of a demonstrated-need study using plan

7 based methodology before the adoption of an impact fee

8 increase which expressly demonstrates certain

9 extraordinary circumstances; prohibiting increases in

410 applicant to take certain actionsimpact asfees aunless conditionspecified ofextraordinary

11 circumstances are demonstrated; prohibiting a local

512 processinggovernment afrom developmentincreasing permitan orimpact developmentfee order;rate under

613 certain circumstances; amending s. 163212.31801055, F.S.; defining the term

7 “extraordinary circumstances”; requiring that a

8 demonstrated-need study include certain information;

9 amending s. 166.033, F.S.; prohibiting a municipality

10 from requiring an applicant to take certain actions as

11 a condition of processing a development permit or

1214 developmentconforming ordera cross-reference; providing an effective date.

15 date.

1316

1417 Be It Enacted by the Legislature of the State of Florida:

1518

1619 Section 1. SubsectionPresent subsections (839) isthrough added(54) toof section 125.022,

20 163.3164, Florida Statutes, are redesignated as subsections (40)

21 through (55), respectively, and a new subsection (39) is added

1722 Floridato Statutesthat section, to read:

18 125.022 Development permits and orders.—

19

(8) A county may not as a condition of processing or

23 163.3164 Community Planning Act; definitions.—As used in

24 this act:

2025

issuing a development permit or development order require an

(39)

“Plan-based methodology” means the use of

the most

2126

applicant to install a work of art, pay a fee for a work of art,

recent and localized data to project growth within a

2227

or reimburse the county for any costs that the county may incur

jurisdiction over a

6

-year period

and

the anticipated capacity

2328

related to a work of art

impacts created by that projected growth, and

the creation of

a

29

list of capital improvements or infrastructure as defined in s.

30

163.31801(3) to be constructed in a defined time period to

31

mitigate th

ose

impact

s

as part of a new or updated impact fee

32

study

.

2433 Section 2. Present paragraphs (a) and (b) of subsection (3)

2534 of section 163.31801, Florida Statutes, are redesignated as

2635 paragraphs (b) and (c), respectively, a new paragraph (a) is

2736 added to that subsection, and paragraph (g) of subsection (6) of

2837 that section is amended, to read:

2938 163.31801 Impact fees; short title; intent; minimum

3039 requirements; audits; challenges.—

3140 (3) For purposes of this section, the term:

32

41

(a)

“Extraordinary circumstances” means

the

measurable

42

effects of development

which

will require mitigation by the

43

affected local government

and which

exceed the total of the

44

current adopted impact fee amount

combined

with any increase as

45

provided in paragraphs (6)(c), (d),

and

(e) in less than

4

46

years.

47 (6) A local government, school district, or special

48 district may increase an impact fee only as provided in this

49 subsection.

50 (g) A local government, school district, or special

51 district may increase an impact fee rate beyond the phase-in

52 limitations established under paragraph (b), paragraph (c),

53 paragraph (d), or paragraph (e) by establishing the need for

54 such increase in full compliance with the requirements of

55 subsection (4), provided the following criteria are met:

56 1. A demonstrated-need study

using plan-based methodology

57 justifying any increase in excess of those authorized in

58 paragraph (b), paragraph (c), paragraph (d), or paragraph (e)

59 has been completed within the 12 months before the adoption of

60 the impact fee increase and expressly demonstrates the

61 extraordinary circumstances necessitating the need to exceed the

62 phase-in limitations.

63

a. An increase in a

nontransportation impact fee

may not be

64

adopted unless the extraordinary circumstances demonstrated in

65

the demonstrated-need study include at least t

wo

of the

66

following

:

33

1. For a county, that

67

(I) The p

opulation

of

the permanentlocal populationgovernment’s estimatejurisdiction

34

determined for

68

over the past 5 years exceeds

,

by at least 10

percent,

the

county by the University of Florida Bureau of

35

Economic and Business Research

is at

least 1.25 times the

69

population estimates and projections used to justify the most

70

recent impact fee increase

.

71

(II)

The average number of building permits issued by the

72

local government over the past

5

-year

years exceeds

,

by at least 10

3673

percent,

high-seriesbuilding populationpermit projectionestimates forand thprojections used to

e

county as published by

3774

the University of Florida Bureau of Economic and Business

38

Research immediately

before

justify the most recent impact fee increase

.

75

(III)

The employment base within the local jurisdiction

76

the year ofover the population estimatepast

;

39

or

40

2. For a municipality, that the municipality is

located

41

within a county

with such a permanent population estimate and

42

the municipality demonstrates that

it has maintained a

43

proportionate share of the

c

ounty’s population growth during the

44

preceding

5

-year period

years exceeds the employment estimates and

77

projections used to justify the most recent impact fee

.

45 (6) A local government, school district, or special

78

(IV) T

he existing level of service grade

will

be lowered

79

46 districtwithout mayan increase anin the impact fee only as provided in thisrate

47 subsection.

48 (g) A local government, school district, or special

49 district may increase an impact fee rate beyond the phase-in

50 limitations established under paragraph (b), paragraph (c),

51 paragraph (d), or paragraph (e) by establishing the need for

52 such increase in full compliance with the requirements of

53 subsection (4), provided the following criteria are met:

54 1. A demonstrated-need study justifying any increase in

55 excess of those authorized in paragraph (b), paragraph (c),

56 paragraph (d), or paragraph (e) has been completed within the 12

57 months before the adoption of the impact fee increase and

58 expressly demonstrates the extraordinary circumstances

59 necessitating the need to exceed the phase-in limitations.

The

60

demonstrated-need study must identify the specific projects that

61

will benefit, and how such projects will benefit, from exceeding

62

the phase-in limitations.

63 2. The local government jurisdiction has held not less than

64 two publicly noticed workshops dedicated to the extraordinary

65 circumstances necessitating the need to exceed the phase-in

66 limitations set forth in paragraph (b), paragraph (c), paragraph

67 (d), or paragraph (e).

68 3. The impact fee increase ordinance is approved by at

69 least a two-thirds vote of the governing body.

70 Section 3. Subsection (8) is added to section 166.033,

71 Florida Statutes, to read:

72 166.033 Development permits and orders.—

73

(8) A

municipality

may no

t

as a condition of processing or

74

issuing a development permit or development order require an

75

applicant to install a work of art, pay a fee for a work of art,

76

or reimburse the

municipality

for any costs that the

77

municipality

may incur related to a work of art

.

78 Section 4. This act shall take effect July 1, 2025.

80

b. An increase in

a

transportation impact fee

may not be

81

adopted unless

the

extraordinary circumstances demonstrated in

82

the demonstrated-need study include at least three of the

83

following:

84

(I)

Any condition provided in

sub-subparagraph a.

85

(II)

Cost growth over the past 5 years

which

exceeds

,

by an

86

average of at least 10

percent,

the

Federal Highway

87

Administration’s

National Highway Construction Cost index

88

average

used to justify the previous impact fee increase

.

89

(III)

The vehicle miles traveled in the

past 5

years

90

exceed

,

by

at least

10

percent,

the

Department of

91

Transportation’s vehicle miles traveled

index average

used to

92

justify the most recent impact fee

.

93

(IV)

The per

-

lane mile cost estimates for construction for

94

the past 5 years exceed

,

by at least 10 percent

,

the

Department

95

of Transportation average used to justify the most recent impact

96

fee.

97

c. An increase in

an

impact fee

for an

independent special

98

district

may not be adopted unless

the

extraordinary

99

circumstances

demonstrated in the demonstrated-need study

100

include

all of the following

:

101

(I)

The amount of growth experienced in the

past 5

years

102

and anticipated within the district require

s

a significant

103

immediate infrastructure investment to serve such growth

which

104

will need to be financed by the

special d

istrict with impact

105

fees

.

106

(II)

The cost of infrastructure investment required to be

107

financed by the district in the next

5

years is increasing the

108

need for public facilities and has a direct impact on the fee

109

amount needed to finance the additional infrastructure for the

110

benefit of the growth

.

111

(III)

The existing level of service

will

be impacted

112

without an increase in the impact fee rate.

113 2. The local government jurisdiction has held not

fewer

114

less

than two publicly noticed workshops dedicated to the

115 extraordinary circumstances necessitating the need to exceed the

116 phase-in limitations set forth in paragraph (b), paragraph (c),

117 paragraph (d), or paragraph (e).

118 3. The impact fee increase ordinance is approved by at

119 least a two-thirds vote of the governing body.

120

121

A

local government may not

increase an impact fee rate beyond

122

the phase-in limitations

under this paragraph if the local

123

government

has not

increased

the impact fee within the past 5

124

years.

Any year in which

the

local

government

is pr

ohibited

from

125

increasing an impact

fee

because the

jurisdiction

is in a

126

hurricane disaster area

is not

included in the 5-year

period.

127 Section 3. Paragraph (d) of subsection (2) of section

128 212.055, Florida Statutes, is amended to read:

129 212.055 Discretionary sales surtaxes; legislative intent;

130 authorization and use of proceeds.—It is the legislative intent

131 that any authorization for imposition of a discretionary sales

132 surtax shall be published in the Florida Statutes as a

133 subsection of this section, irrespective of the duration of the

134 levy. Each enactment shall specify the types of counties

135 authorized to levy; the rate or rates which may be imposed; the

136 maximum length of time the surtax may be imposed, if any; the

137 procedure which must be followed to secure voter approval, if

138 required; the purpose for which the proceeds may be expended;

139 and such other requirements as the Legislature may provide.

140 Taxable transactions and administrative procedures shall be as

141 provided in s. 212.054.

142 (2) LOCAL GOVERNMENT INFRASTRUCTURE SURTAX.—

143 (d) The proceeds of the surtax authorized by this

144 subsection and any accrued interest shall be expended by the

145 school district, within the county and municipalities within the

146 county, or, in the case of a negotiated joint county agreement,

147 within another county, to finance, plan, and construct

148 infrastructure; to acquire any interest in land for public

149 recreation, conservation, or protection of natural resources or

150 to prevent or satisfy private property rights claims resulting

151 from limitations imposed by the designation of an area of

152 critical state concern; to provide loans, grants, or rebates to

153 residential or commercial property owners who make energy

154 efficiency improvements to their residential or commercial

155 property, if a local government ordinance authorizing such use

156 is approved by referendum; or to finance the closure of county

157 owned or municipally owned solid waste landfills that have been

158 closed or are required to be closed by order of the Department

159 of Environmental Protection. Any use of the proceeds or interest

160 for purposes of landfill closure before July 1, 1993, is

161 ratified. The proceeds and any interest may not be used for the

162 operational expenses of infrastructure, except that a county

163 that has a population of fewer than 75,000 and that is required

164 to close a landfill may use the proceeds or interest for long

165 term maintenance costs associated with landfill closure.

166 Counties, as defined in s. 125.011, and charter counties may, in

167 addition, use the proceeds or interest to retire or service

168 indebtedness incurred for bonds issued before July 1, 1987, for

169 infrastructure purposes, and for bonds subsequently issued to

170 refund such bonds. Any use of the proceeds or interest for

171 purposes of retiring or servicing indebtedness incurred for

172 refunding bonds before July 1, 1999, is ratified.

173 1. For the purposes of this paragraph, the term

174 “infrastructure” means:

175 a. Any fixed capital expenditure or fixed capital outlay

176 associated with the construction, reconstruction, or improvement

177 of public facilities that have a life expectancy of 5 or more

178 years, any related land acquisition, land improvement, design,

179 and engineering costs, and all other professional and related

180 costs required to bring the public facilities into service. For

181 purposes of this sub-subparagraph, the term “public facilities”

182 means facilities as defined in

s. 163.3164

s. 163.3164(41)

, s.

183 163.3221(13), or s. 189.012(5), and includes facilities that are

184 necessary to carry out governmental purposes, including, but not

185 limited to, fire stations, general governmental office

186 buildings, and animal shelters, regardless of whether the

187 facilities are owned by the local taxing authority or another

188 governmental entity.

189 b. A fire department vehicle, an emergency medical service

190 vehicle, a sheriff’s office vehicle, a police department

191 vehicle, or any other vehicle, and the equipment necessary to

192 outfit the vehicle for its official use or equipment that has a

193 life expectancy of at least 5 years.

194 c. Any expenditure for the construction, lease, or

195 maintenance of, or provision of utilities or security for,

196 facilities, as defined in s. 29.008.

197 d. Any fixed capital expenditure or fixed capital outlay

198 associated with the improvement of private facilities that have

199 a life expectancy of 5 or more years and that the owner agrees

200 to make available for use on a temporary basis as needed by a

201 local government as a public emergency shelter or a staging area

202 for emergency response equipment during an emergency officially

203 declared by the state or by the local government under s.

204 252.38. Such improvements are limited to those necessary to

205 comply with current standards for public emergency evacuation

206 shelters. The owner must enter into a written contract with the

207 local government providing the improvement funding to make the

208 private facility available to the public for purposes of

209 emergency shelter at no cost to the local government for a

210 minimum of 10 years after completion of the improvement, with

211 the provision that the obligation will transfer to any

212 subsequent owner until the end of the minimum period.

213 e. Any land acquisition expenditure for a residential

214 housing project in which at least 30 percent of the units are

215 affordable to individuals or families whose total annual

216 household income does not exceed 120 percent of the area median

217 income adjusted for household size, if the land is owned by a

218 local government or by a special district that enters into a

219 written agreement with the local government to provide such

220 housing. The local government or special district may enter into

221 a ground lease with a public or private person or entity for

222 nominal or other consideration for the construction of the

223 residential housing project on land acquired pursuant to this

224 sub-subparagraph.

225 f. Instructional technology used solely in a school

226 district’s classrooms. As used in this sub-subparagraph, the

227 term “instructional technology” means an interactive device that

228 assists a teacher in instructing a class or a group of students

229 and includes the necessary hardware and software to operate the

230 interactive device. The term also includes support systems in

231 which an interactive device may mount and is not required to be

232 affixed to the facilities.

233 2. For the purposes of this paragraph, the term “energy

234 efficiency improvement” means any energy conservation and

235 efficiency improvement that reduces consumption through

236 conservation or a more efficient use of electricity, natural

237 gas, propane, or other forms of energy on the property,

238 including, but not limited to, air sealing; installation of

239 insulation; installation of energy-efficient heating, cooling,

240 or ventilation systems; installation of solar panels; building

241 modifications to increase the use of daylight or shade;

242 replacement of windows; installation of energy controls or

243 energy recovery systems; installation of electric vehicle

244 charging equipment; installation of systems for natural gas fuel

245 as defined in s. 206.9951; and installation of efficient

246 lighting equipment.

247 3. Notwithstanding any other provision of this subsection,

248 a local government infrastructure surtax imposed or extended

249 after July 1, 1998, may allocate up to 15 percent of the surtax

250 proceeds for deposit into a trust fund within the county’s

251 accounts created for the purpose of funding economic development

252 projects having a general public purpose of improving local

253 economies, including the funding of operational costs and

254 incentives related to economic development. The ballot statement

255 must indicate the intention to make an allocation under the

256 authority of this subparagraph.

257 Section 4. This act shall take effect July 1, 2025.

Volver al texto completo