Ratifi English Iniciar sesión
Ratifi

Proyectos federales de Congress.gov. Proyectos estatales de Open States.

SB 354Sesión 2025

Qué cambió entre versiones

1264 párrafos cambiaron+3652 palabras agregadas−4814 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

Florida Senate

-

2025

CS for SB 354

By

Senator Gaetz

the Committee on Regulated Industries; and Senator Gaetz

1-00565-25 2025354__580-02348-25 2025354c1

1 A bill to be entitled

2 An act relating to the Florida Public Service Commission;

3 Commission; amending s. 350.01, F.S.; revising the membership of

4 membership of the Florida Public Service Commission; amending s. 366.06,

5 creating s. 350.129, F.S.; requiring thethat commission to establish a certainorders

6 issued by the commission contain adequate support for

7 any conclusions made by the commission; requiring the

8 commission to provide an explanation and a discussion

9 of major elements of the settlement when issuing an

10 order accepting or denying certain settlement

611 scheduleagreements; amending s. 366.8106, F.S.; revisingrequiring the

12 commission to keep the allowable return on equity for

13 public utilities close to the risk-free rate of return

14 and require that upward deviations away from the risk

15 free rate be specifically justified by the public

716 legislativeutility findingsseeking anda intenttariff modification; amending s. 366.82,

17 366.07, F.S.; requiring the commission to establish a

18 schedule by which rate change requests may be

19 submitted to the commission by each public utility

20 company; creating s. 366.077, F.S.; requiring the

21 commission to provide a report to the Governor and the

22 Legislature by a specified date each year; providing

23 requirements for such report; amending s. 366.96,

824 F.S.; revisingrequiring thethat requirementsimprovements forincluded thein annual reportcertain

25 transmission and distribution storm protection plans

26 have forecasted customer benefits exceeding their

27 forecasted cost; revising the factors that the Public

928 providedService byCommission themust commissionconsider toin thereviewing Governor and thesuch

29 plans; deleting obsolete language; amending s.

1030 Legislature367.021, F.S.; reenactingdefining ssterms; amending s. 366367.8255(4)022,

31 F.S.; revising the types of nonprofit organizations

32 which are exempt from commission jurisdiction;

1133 366creating s.8260(2)(b), and 366367.95(2)(c)24, F.S.,; relatingauthorizing tothe commission

12 environmental cost recovery, storm-recovery financing,

34 to initiate a proceeding to determine whether an

35 organization is a qualifying nonprofit organization;

36 requiring a person to notify an organization before

1337 andfiling financinga petition for certainsuch nuclearproceeding; generating assetproviding

38 requirements for such notification; authorizing an

39 organization to respond to such notice in a certain

40 manner and in a specified timeframe after receipt;

41 authorizing a person to file a petition to initiate a

42 proceeding to determine whether an organization is a

43 qualifying nonprofit organization after a specified

44 timeframe under certain circumstances; providing

1445 retirementrequirements orfor abandonmentsuch costs,petition; respectively,requiring tothe

46 commission to consider certain information in making

47 its determination of whether an organization is a

48 qualifying nonprofit organization; requiring the

49 commission to provide its reasoning for a

50 determination that an organization is not a qualifying

51 nonprofit organization; requiring the commission to

52 allow such organization a certain period of time in

1553 incorporatewhich to address the amendmentcommission’s made to s. 366.06, F.S., indetermination;

16 references thereto; reenacting s. 553.975, F.S.,

54 requiring the commission, under certain circumstances,

55 to issue an order stating that the organization is not

1756 relatingexempt tofrom the reportjurisdiction toof the Governorcommission and

18 Legislature, to incorporate the amendment made to s.

19 366.82, F.S., in a reference thereto; providing an

20 effective date.

21

22 Be It Enacted by the Legislature of the State of Florida:

23

24 Section 1. Subsection (1) of section 350.01, Florida

25 Statutes, is amended to read:

57 must be regulated as a utility; requiring the

58 commission to follow specified procedures for an

2659 350.01 Floridaorganization Publicnot Serviceexempt Commission;from termsthe ofcommission’s

60 jurisdiction; authorizing an organization to petition

61 the commission to regain qualifying nonprofit

62 organization status under certain circumstances;

63 requiring a specified waiting period before certain

64 organizations may petition to regain qualifying

65 nonprofit organization status; requiring the

27 commissioners66 commission to adopt rules for a certain purpose; vacancies; election and duties of chair; quorum;

28 proceedings; public records and public meetings exemptions.—

29 (1) The Florida Public Service Commission shall

67 requiring the commission to submit a proposed rule by

68 a specified date; amending ss. 288.0655, 377.814, and

69 624.105, F.S.; conforming cross-references; providing

70 an effective date.

71

72 Be It Enacted by the Legislature of the State of Florida:

73

74 Section 1. Subsection (1) of section 350.01, Florida

75 Statutes, is amended to read:

76 350.01 Florida Public Service Commission; terms of

77 commissioners; vacancies; election and duties of chair; quorum;

78 proceedings; public records and public meetings exemptions.—

79 (1) The Florida Public Service Commission shall

be composed

3080

consist

3 párrafos sin cambios

of

seven

five

commissioners appointed pursuant to s.

3181 350.031.

One member must be a certified public accountant, and

3282

one member must be a chartered financial analyst.

3383 Section 2. SubsectionSection (1) of section 366350.06129, Florida Statutes, is created to

34 Statutes, is amended to read:

35 366.06 Rates; procedure for fixing and changing.—

36 (1) A public utility

may

shall

not, directly or indirectly,

37 charge or receive any rate not on file with the commission for

38 the particular class of service involved

, and no change shall be

39

made in any schedule

. All applications for changes in rates

must

40

shall

be made to the commission in writing under rules and

84 read:

85

350.129

Orders of the Florida Public Service Commission

.—

86

41 regulations(1) All prescribed,orders andissued by the commission must contain

has

shall have

the

42 authority to determine and fix fair, just, and reasonable rates

43 that may be requested, demanded, charged, or collected by any

44 public utility for its service. The commission shall investigate

45 and determine the actual legitimate costs of the property of

46 each utility company,

of what is

actually used and useful in the

47 public service, and shall keep a current record of the net

48 investment of each public utility company in such property

of

87

adequate support for the commission’s conclusions, including the

88

specific facts and factors on which the conclusions are based.

89

While the commission may make conclusions based upon the public

90

49 which valueinterest, as determinedprovided byin chapters 350-368, the commission, shall

must

shall

be used

50 for ratemaking purposes and

shall

be the money honestly and

51 prudently invested by the public utility company in such

52 property used and useful in serving the public, less accrued

53 depreciation, and

may

shall

not include any goodwill or going

54 concern value or franchise value in excess of payment made

55 therefor. In fixing fair, just, and reasonable rates for each

56 customer class, the commission shall, to the extent practicable,

57 consider the cost of providing service to the class, as well as

58 the rate history, value of service, and experience of the public

59 utility; the consumption and load characteristics of the various

60 classes of customers; and public acceptance of rate structures.

6191

specify in its orders a rationale for its conclusions.

92

(2) For commission orders that affect substantial interests

93

pursuant to s. 120.569, when issuing an order accepting or

94

denying a settlement agreement reached by any of the parties to

95

a proceeding, the commission shall provide a reasoned

96

explanation, citing the specific facts and factors on which it

97

relied. In addition, the commission shall provide in its order a

98

discussion of the major elements of the settlement and a

99

rationale for its conclusions.

100 Section 3. Present subsection (4) of section 366.06,

101 Florida Statutes, is redesignated as subsection (5), and a new

102 subsection (4) is added to that section, to read:

103 366.06 Rates; procedure for fixing and changing.—

104

(4) In order to best meet the needs of Florida households,

105

the commission shall work to keep the allowable return on equity

106

for public utilities

close to the risk-free rate of return and

107

shall require that upward deviations from the risk-free rate be

108

specifically justified by the

public

utility seeking a tariff

109

modification.

110 Section 4. Section 366.07, Florida Statutes, is amended to

111 read:

112 366.07 Rates; adjustment.—

113

(1)

Whenever the commission, after public hearing either

114 upon its own motion or upon complaint, shall find the rates,

115 rentals, charges or classifications, or any of them, proposed,

116 demanded, observed, charged or collected by any public utility

117 for any service, or in connection therewith, or the rules,

118 regulations, measurements, practices or contracts, or any of

119 them, relating thereto, are unjust, unreasonable, insufficient,

120 excessive, or unjustly discriminatory or preferential, or in

121 anywise in violation of law, or any service is inadequate or

122 cannot be obtained, the commission shall determine and by order

123 fix the fair and reasonable rates, rentals, charges or

124 classifications, and reasonable rules, regulations,

125 measurements, practices, contracts or service, to be imposed,

126 observed, furnished or followed in the future.

127

(2)

The

3 párrafos sin cambios

commission

shall establish

a schedule

by which

rate change

62

128

change requests

may

be submitted

to the commission

by each

129

public utility company.

130 Section 5. Section 366.077, Florida Statutes, is created to

131 read:

132

366.077 Report on rates.—The commission shall

publicsubmit

63

utility company.

64 Section 3. Section 366.81, Florida Statutes, is amended to

65 read:

an

133

annual report

to

66 366.81 Legislativethe findingsGovernor and intent.—Thethe Legislature by

67 finds and declares that it is critical to

use

utilize

the most

68 efficient and cost-effective demand-side renewable energy

69 systems and conservation systems in order to protect the health,

70 prosperity, and general welfare of the state and its citizens.

71 Reduction in, and control of, the growth rates of electric

72 consumption and of weather-sensitive peak demand are of

73 particular importance. The Legislature further finds that the

74 Florida Public Service Commission is the appropriate agency to

75 adopt goals and approve plans related to the promotion of

76 demand-side renewable energy systems and the conservation of

77 electric energy and natural gas usage. The Legislature directs

78 the commission to develop and adopt overall goals and authorizes

79 the commission to require each utility to develop plans and

80 implement programs for increasing energy efficiency and

81 conservation and demand-side renewable energy systems within its

82 service area, subject to the approval of the commission.

In

83

order to best meet the needs of Florida households, the

84

commission

shall work to keep the allowable return on equity

85

close to the risk-free rate of return and shall require that

86

upward deviations away from the risk-free rate be specifically

87

justified by the utility seeking a tariff modification

each

March

134

1.

Since

88 solutions to our energy problems are complex, the Legislature

89 intends that the use of solar energy, renewable energy sources,

90 highly efficient systems, cogeneration, and load-control systems

91 be encouraged. Accordingly, in exercising its jurisdiction, the

92 commission

may

shall

not approve any rate or rate structure

93 which discriminates against any class of customers on account of

94 the use of such facilities, systems, or devices. This expression

95 of legislative intent

may

shall

not be construed to preclude

96 experimental rates, rate structures, or programs. The

97 Legislature further finds and declares that ss. 366.80-366.83

98 and 403.519 are to be liberally construed in order to meet the

99 complex problems of reducing and controlling the growth rates of

100 electric consumption and reducing the growth rates of weather

101 sensitive peak demand; increasing the overall efficiency and

102 cost-effectiveness of electricity and natural gas production and

103 use; encouraging further development of demand-side renewable

104 energy systems; and conserving expensive resources, particularly

105 petroleum fuels.

106 Section 4. Subsection (10) of section 366.82, Florida

107 Statutes, is amended to read:

108 366.82 Definition; goals; plans; programs; annual reports;

109 energy audits.—

110 (10) The commission shall require periodic reports from

111 each utility and shall provide the

Governor and the

Legislature

112

and the Governor

with an annual report by March 1 of the goals

113 it has adopted and its progress toward meeting those goals. The

114 commission shall also consider the performance of each utility

115 pursuant to ss. 366.80-366.83 and 403.519 when establishing

116 rates for those utilities over which the commission has

117 ratesetting authority.

118

135

(1)

The report must include all of the following:

136

(a)

The annual report must include all of the following:

119

1.

An investigation of contemporary

economic analysis

120

137

related to

rate changes in this state

.

121

2.

138

(b)

An analysis of potential

cost impact

s

to utility

122

139

customers

ofin this state

if excess returns on equity have

123

140

occurred, and

potential

, if such excess returns have not occurred at a

141

significant rate,

any resulting

cost savings, if any, to customers if

such

customers.

124142

(c)

theAn excessanalysis of returns toon equity models presented by

have

not occurred

at a significant

143

public utilities and used by the commission to determine

144

approved returns on equity for public utilities in this state.

125145

rate

Such analysis must:

146

1.

126

Compare models used by federal agencies and other state

147

utility regulatory bodies with those used by the commission;

148

2.

Determine whether the models used are generally

149

financially logical; and

150

3.

An analysis of a

lternative rate

-

of

-

return scenarios

,

Determine whether the models used comport with generally

151

accepted economic theory both inside and outside of the utility

127152

including an investigation of

the rationale for

why

such

128

scenarios

were not chosen in the past,

and an investigation of

129

the applicability of such scenarios

for the future.

industry.

130153

4.

(d)

An assessment

of

long-term impacts and economic

131

, including the

154

economic repercussions

of

rising rates of regulated returns on equity

,

to

132

155

utilities and their customers

in the future

.

133

5.

156

(e)

A summary

providing detailed information regarding the

157

detailing the compensation of the executive officers of each public utility

134

158

officersproviding service to the residents of all public utilities servicing this state, or the

135159

executive officers of theirpublic utility’s affiliated companies or parent

136160

company,

includin

parent company. Such information must include, but need not be

161

g, but not limited to,

salaries, benefits, stock options, bonuses, stock

137

stock options, bonuses, stock buybacks

162

buybacks

,

and other taxable payments,

138

payments,

expressed both

as dollar

163

as dollar amounts and as a

percentage

139

percentage of the entity’s total revenue

. The

164

summary

must include

the

140

profits and losses

of each entity as

165

of each entity as reported in its financial statements

141

statements

a

nd

must highlight any

166

highlight any compensation

exceedingthat exceeds the

industry average

142

average

. The office shall also include in the report any

143

. The commission

167

shall also include any rationale provided by thea insurerpublic justifying compensationutility

144

168

justifying compensation exceeding the industry average and, for each insurer, an

145

169

each public utility, an explanation ofas to how specific data gathered during the creation of

146

the report

170

gathered during the compiling of information

inform

ed

the office’s

the

171

commission’s

decisions

on that insurer’s

on the public utility’s rate

change

147172

rate

change requests.

148

173

(b2)

The report

4 párrafos sin cambios

must

provide benchmarking

,

comparing

public

149174

utilities

providing service to the residents of this state with

175

servicing this state with public utilities servicingproviding service to the residents of

150

other

176

other states

, including

commentary

on all findings

.

151177 Section 56. ForSubsections the(4) purposeand (11) of incorporatingsection the amendment366.96,

152 made by this act to section 366.06, Florida Statutes, in a

153 reference thereto, subsection (4) of section 366.8255, Florida

154178 Florida Statutes, isare reenactedamended to read:

155179 366.825596 EnvironmentalStorm protection plan cost recovery.—

156 (4) Environmental compliance costs recovered through the

157 environmental cost-recovery factor shall be allocated to the

158 customer classes using the criteria set out in s. 366.06(1),

159 taking into account the manner in which similar types of

160 investment or expense were allocated in the company’s last rate

161 case.

162 Section 6. For the purpose of incorporating the amendment

163 made by this act to section 366.06, Florida Statutes, in a

164 reference thereto, paragraph (b) of subsection (2) of section

165 366.8260, Florida Statutes, is reenacted to read:

166 366.8260 Storm-recovery financing.—

167180 (24) FINANCING ORDERS.—

168 (b)1. Proceedings on a petition submitted pursuant to

169 paragraph (a) shall begin with a petition by an electric utility

170 and shall be disposed of in accordance with the provisions of

171 chapter 120 and applicable rules, except that the provisions of

172 this section, to the extent applicable, shall control.

173 a. Within 7 days after the filing of a petition, the

174 commission shall publish a case schedule, which schedule shall

175 place the matter before the commission on an agenda that will

176 permit a commission decision no later than 120 days after the

177 date the petition is filed.

178 b. No later than 135 days after the date the petition is

179 filed, the commission shall issue a financing order or an order

180 rejecting the petition. A party to the commission proceeding may

181 petition the commission for reconsideration of the financing

182 order within 5 days after the date of its issuance. The

183 commission shall issue a financing order authorizing financing

184 of reasonable and prudent storm-recovery costs, the storm

185 recovery reserve amount determined appropriate by the

186 commission, and financing costs if the commission finds that the

187 issuance of the storm-recovery bonds and the imposition of

188 storm-recovery charges authorized by the order are reasonably

189 expected to result in lower overall costs or would avoid or

190 significantly mitigate rate impacts to customers as compared

191 with alternative methods of financing or recovering storm

192 recovery costs and storm-recovery reserve. Any determination of

193 whether storm-recovery costs are reasonable and prudent shall be

194 made with reference to the general public interest in, and the

195 scope of effort required to provide, the safe and expeditious

196 restoration of electric service.

197 2. In a financing order issued to an electric utility, the

198 commission shall:

199 a. Except as provided in sub-subparagraph f. and in

200 subparagraph 4., specify the amount of storm-recovery costs and

201 the level of storm-recovery reserves, taking into consideration,

202 to the extent the commission deems appropriate, any other

203 methods used to recover these costs, and describe and estimate

204 the amount of financing costs which may be recovered through

205 storm-recovery charges; and specify the period over which such

206 costs may be recovered.

207 b. Determine that the proposed structuring, expected

208 pricing, and financing costs of the storm-recovery bonds are

209 reasonably expected to result in lower overall costs or would

210 avoid or significantly mitigate rate impacts to customers as

211 compared with alternative methods of financing or recovering

212 storm-recovery costs.

213 c. Provide that, for the period specified pursuant to sub

214 subparagraph a., the imposition and collection of storm-recovery

215 charges authorized in the financing order shall be paid by all

At a minimum, any improvement included in a

181

216 customers receiving transmission orand distribution service fromstorm

217 the electric utility or its successors or assignees under

218 commission-approved rate schedules or under special contracts,

219 even if the customer elects to purchase electricity from an

220 alternative electric supplier following a fundamental change in

221 regulation of public utilities in the state.

222 d. Determine what portion, if any, of the storm-recovery

223 reserves must be held in a funded reserve and any limitations on

224 how the reserve may be held, accessed, or used.

225 e. Include a formula-based mechanism for making expeditious

226 periodic adjustments in the storm-recovery charges that

227 customers are required to pay under the financing order and for

228 making any adjustments that are necessary to correct for any

229 overcollection or undercollection of the charges or to otherwise

230 ensure the timely payment of storm-recovery bonds and financing

231 costs and other required amounts and charges payable in

232 connection with the storm-recovery bonds.

233 f. Specify the storm-recovery property that is, or shall

234 be, created in favor of an electric utility or its successors or

235 assignees and that shall be used to pay or secure storm-recovery

236 bonds and financing costs.

237 g. Specify the degree of flexibility to be afforded to the

238 electric utility in establishing the terms and conditions of the

239 storm-recovery bonds, including, but not limited to, repayment

240 schedules, interest rates, and other financing costs.

241 h. Provide that storm-recovery charges be allocated to the

242 customer classes using the criteria set out in s. 366.06(1), in

243 the manner in which these costs or their equivalent were

244 allocated in the cost-of-service study approved in connection

245 with the electric utility’s last rate case. If the electric

246 utility’s last rate case was resolved by a settlement agreement,

247 the cost-of-service methodology filed by the electric utility in

248 that case shall be used.

249 i. Provide that, after the final terms of an issuance of

250 storm-recovery bonds have been established and prior to the

251 issuance of storm-recovery bonds, the electric utility shall

252 determine the resulting initial storm-recovery charge in

253 accordance with the financing order and such initial storm

254 recovery charge shall be final and effective upon the issuance

255 of such storm-recovery bonds without further commission action.

256 j. Include any other conditions that the commission

257 considers appropriate and that are not otherwise inconsistent

258 with this section.

protection plan

filed

182

pursuant to this section must have a forecasted customer benefit

183

exceeding its forecasted cost. In addition,

in its review of

184 each

transmission and distribution storm protection

plan filed

185 pursuant to this section, the commission shall consider:

186 (a) The extent to which the plan is expected to reduce

187 restoration costs and outage times associated with extreme

188 weather events and enhance reliability, including whether the

189 plan prioritizes areas of lower reliability performance

and

190

whether the cost of implementing the plan is reasonable and

191

prudent given the expected benefit

.

192 (b) The extent to which storm protection of transmission

193 and distribution infrastructure is feasible, reasonable, or

194 practical in certain areas of the utility’s service territory,

195 including, but not limited to, flood zones and rural areas.

196 (c) The estimated costs and benefits to the utility and its

197 customers of making the improvements proposed in the plan.

198 (d) The estimated annual rate impact resulting from

199 implementation of the plan during the first 3 years addressed in

200 the plan.

201

(e) The performance of previously approved plan

202

improvements in reducing outage times and storm restoration

203

costs.

204 (11) The commission shall adopt rules to implement and

205 administer this section

and shall propose a rule for adoption as

206

soon as practicable after the effective date of this act, but

207

not later than October 31, 2019

.

208 Section 7. Present subsections (7), (8), and (9) and (10)

209 through (13) of section 367.021, Florida Statutes, are

210 redesignated as subsections (8), (9), and (10) and (12) through

211 (15), respectively, and new subsections (7) and (11) are added

212 to that section, to read:

213 367.021 Definitions.—As used in this chapter, the following

214 words or terms shall have the meanings indicated:

215

(7) “Governing board” means a board of directors, nonprofit

216

board, board of trustees, corporate governing body as

217

established in the in the bylaws or articles of incorporation of

218

an organization, or similar body overseeing the operations of an

219

organization.

220

(11)

“Qualifying nonprofit organization” means an

221

organization that meets all of the following criteria:

222

(a)

The organization is a nonprofit corporation,

223

association, or cooperative providing service solely to members

224

who own and control such nonprofit corporation, association, or

225

cooperative.

226

(b)

The organization conducts open and fair elections to

227

its governing board at an annual meeting of its members. The

228

term of any one governing board member may not exceed 36 months;

229

however, a candidate may run for reelection without any limit on

230

the number of terms they may serve.

231

(c)

At least 75 percent of the governing board of the

232

organization is made up of the organization’s members.

233

(d)

The organization provides a mechanism for members of

234

the organization to directly nominate candidates directly for

235

the governing board. At a minimum, any member or candidate who

236

obtains the signatures of at least 1 percent of members of the

237

organization on a petition for nomination for a particular board

238

position or election must, as established by that organization’s

239

bylaws, be allowed to stand for election in the same manner as

240

if that member had been nominated by the existing governing

241

board, a committee on nominations established by the board, or

242

other nomination mechanism or procedure as established by the

243

organization’s governing documents. Such candidate must meet all

244

other requirements established by law or by the organization’s

245

governing documents to serve on the board.

246

(e) The organization is not subject to disqualification

247

pursuant to s. 367.24.

248 Section 8. Subsection (7) of section 367.022, Florida

249 Statutes, is amended to read:

250 367.022 Exemptions.—The following are not subject to

251 regulation by the commission as a utility nor are they subject

252 to the provisions of this chapter, except as expressly provided:

253 (7)

Qualifying nonprofit organizations

Nonprofit

254

corporations, associations, or cooperatives providing service

255

solely to members who own and control such nonprofit

256

corporations, associations, or cooperatives

.

257 Section 9. Section 367.24, Florida Statutes, is created to

258 read:

259

260 In performing the responsibilities of this subparagraph and

261 subparagraph 5., the commission may engage outside consultants

262 or counsel. Any expenses associated with such services shall be

263 included as part of financing costs and included in storm

264 recovery charges.

265 3. A financing order issued to an electric utility may

266 provide that creation of the electric utility’s storm-recovery

267 property pursuant to sub-subparagraph 2.f. is conditioned upon,

268 and shall be simultaneous with, the sale or other transfer of

269 the storm-recovery property to an assignee and the pledge of the

270 storm-recovery property to secure storm-recovery bonds.

271 4. If the commission issues a financing order, the electric

272 utility shall file with the commission at least biannually a

273 petition or a letter applying the formula-based mechanism

274 pursuant to sub-subparagraph 2.e. and, based on estimates of

275 consumption for each rate class and other mathematical factors,

276 requesting administrative approval to make the adjustments

277 described in sub-subparagraph 2.e. The review of such a request

367.24 Disqualification from exempt status.—

260

(1)

The commission may, upon its own motion or petition by

261

278 shallany beperson, limitedinitiate a proceeding to determiningdetermine whether there is anyan

279 mathematical error in the application of the formula-based

280 mechanism relating to the appropriate amount of any

281 overcollection or undercollection of storm-recovery charges and

282 the amount of an adjustment. Such adjustments shall ensure the

283 recovery of revenues sufficient to provide for the payment of

284 principal, interest, acquisition, defeasance, financing costs,

285 or redemption premium and other fees, costs, and charges in

286 respect of storm-recovery bonds approved under the financing

287 order. Within 60 days after receiving an electric utility’s

288 request pursuant to this paragraph, the commission shall either

289 approve the request or inform the electric utility of any

290 mathematical errors in its calculation. If the commission

291 informs the utility of mathematical errors in its calculation,

292 the utility may correct its error and refile its request. The

293 timeframes previously described in this paragraph shall apply to

294 a refiled request.

295 5. Within 120 days after the issuance of storm-recovery

296 bonds, the electric utility shall file with the commission

297 information on the actual costs of the storm-recovery bond

298 issuance. The commission shall review such information to

299 determine if such costs incurred in the issuance of the bonds

300 resulted in the lowest overall costs that were reasonably

301 consistent with market conditions at the time of the issuance

302 and the terms of the financing order. The commission may

303 disallow any incremental issuance costs in excess of the lowest

304 overall costs by requiring the utility to make a contribution to

305 the storm reserve in an amount equal to the excess of actual

306 issuance costs incurred, and paid for out of storm-recovery bond

307 proceeds, and the lowest overall issuance costs as determined by

308 the commission. The commission may not make adjustments to the

309 storm-recovery charges for any such excess issuance costs.

310 6. Subsequent to the earlier of the transfer of storm

311 recovery property to an assignee or the issuance of storm

312 recovery bonds authorized thereby, a financing order is

313 irrevocable and, except as provided in subparagraph 4. and

314 paragraph (c), the commission may not amend, modify, or

315 terminate the financing order by any subsequent action or

316 reduce, impair, postpone, terminate, or otherwise adjust storm

317 recovery charges approved in the financing order. After the

318 issuance of a financing order, the electric utility retains sole

319 discretion regarding whether to assign, sell, or otherwise

320 transfer storm-recovery property or to cause the storm-recovery

321 bonds to be issued, including the right to defer or postpone

322 such assignment, sale, transfer, or issuance.

323 Section 7. For the purpose of incorporating the amendment

324 made by this act to section 366.06, Florida Statutes, in a

325 reference thereto, paragraph (c) of subsection (2) of section

326 366.95, Florida Statutes, is reenacted to read:

327 366.95 Financing for certain nuclear generating asset

328 retirement or abandonment costs.—

329 (2) FINANCING ORDERS.—

330 (c)1. Proceedings on a petition submitted pursuant to

331 paragraph (a) begin with the petition by an electric utility,

332 filed subject to the timeframe specified in paragraph (b), if

333 applicable, and shall be disposed of in accordance with chapter

334 120 and applicable rules, except that this section, to the

335 extent applicable, controls.

262

organization meets the definition of a qualifying nonprofit

263

organization under s. 367.021.

264

(a)

336 a. WithinA 7person daysmust, after thebefore filing ofsuch a petition, thenotify

337 commission shall publish a case schedule, which must place the

338 matter before the commission on an agenda that permits a

339 commission decision no later than 120 days after the date the

340 petition is filed.

341 b. No later than 135 days after the date the petition is

342 filed, the commission shall issue a financing order or an order

343 rejecting the petition. A party to the commission proceeding may

344 petition the commission for reconsideration of the financing

345 order within 5 days after the date of its issuance. The

346 commission shall issue a financing order authorizing the

347 financing of reasonable and prudent nuclear asset-recovery costs

348 and financing costs if the commission finds that the issuance of

349 the nuclear asset-recovery bonds and the imposition of nuclear

350 asset-recovery charges authorized by the financing order have a

351 significant likelihood of resulting in lower overall costs or

352 would avoid or significantly mitigate rate impacts to customers

353 as compared with the traditional method of financing and

354 recovering nuclear asset-recovery costs. Any determination of

355 whether nuclear asset-recovery costs are reasonable and prudent

356 shall be made with reference to the general public interest and

357 in accordance with paragraph (b), if applicable.

358 2. In a financing order issued to an electric utility, the

359 commission shall:

360 a. Except as provided in sub-subparagraph d. and

361 subparagraph 4., specify the amount of nuclear asset-recovery

362 costs to be financed using nuclear asset-recovery bonds, taking

363 into consideration, to the extent the commission deems

364 appropriate, any other methods used to recover these costs. The

365 commission shall describe and estimate the amount of financing

366 costs which may be recovered through nuclear asset-recovery

367 charges and specify the period over which such costs may be

368 recovered. Any such determination as to the overall time period

369 for cost recovery must be consistent with a settlement

370 agreement, if any, under paragraph (b);

371 b. Determine if the proposed structuring, expected pricing,

372 and financing costs of the nuclear asset-recovery bonds have a

373 significant likelihood of resulting in lower overall costs or

374 would avoid or significantly mitigate rate impacts to customers

375 as compared with the traditional method of financing and

376 recovering nuclear asset-recovery costs. A financing order must

377 provide detailed findings of fact addressing cost-effectiveness

378 and associated rate impacts upon retail customers and retail

379 customer classes;

380 c. Require, for the period specified pursuant to sub

381 subparagraph a., that the imposition and collection of nuclear

382 asset-recovery charges authorized under a financing order be

383 nonbypassable and paid by all existing and future customers

384 receiving transmission or distribution service from the electric

385 utility or its successors or assignees under commission-approved

386 rate schedules or under special contracts, even if a customer

387 elects to purchase electricity from an alternative electric

388 supplier following a fundamental change in regulation of public

389 utilities in this state;

390 d. Include a formula-based true-up mechanism for making

391 expeditious periodic adjustments in the nuclear asset-recovery

392 charges that customers are required to pay pursuant to the

393 financing order and for making any adjustments that are

394 necessary to correct for any overcollection or undercollection

395 of the charges or to otherwise ensure the timely payment of

396 nuclear asset-recovery bonds and financing costs and other

397 required amounts and charges payable in connection with the

398 nuclear asset-recovery bonds;

399 e. Specify the nuclear asset-recovery property that is, or

400 shall be, created in favor of an electric utility or its

401 successors or assignees and that shall be used to pay or secure

402 nuclear asset-recovery bonds and all financing costs;

403 f. Specify the degree of flexibility to be afforded to the

404 electric utility in establishing the terms and conditions of the

405 nuclear asset-recovery bonds, including, but not limited to,

406 repayment schedules, expected interest rates, and other

407 financing costs consistent with sub-subparagraphs a.-e.;

408 g. Require nuclear asset-recovery charges to be allocated

409 to the customer classes using the criteria set out in s.

410 366.06(1), in the manner in which these costs or their

411 equivalent was allocated in the cost-of-service study that was

412 approved in connection with the electric utility’s last rate

413 case and that is in effect during the nuclear asset-recovery

414 charge annual billing period. If the electric utility’s last

415 rate case was resolved by a settlement agreement, the cost-of

416 service methodology that was adopted in the settlement agreement

417 in that case and that is in effect during the nuclear asset

418 recovery charge annual billing period shall be used;

419 h. Require, after the final terms of an issuance of nuclear

420 asset-recovery bonds have been established and before the

421 issuance of nuclear asset-recovery bonds, that the electric

422 utility determine the resulting initial nuclear asset-recovery

423 charge in accordance with the financing order and that such

424 initial nuclear asset-recovery charge be final and effective

425 upon the issuance of such nuclear asset-recovery bonds without

426 further commission action so long as the nuclear asset-recovery

427 charge is consistent with the financing order; and

428 i. Include any other conditions that the commission

429 considers appropriate and that are authorized by this section.

430

431 In performing the responsibilities of this subparagraph and

432 subparagraph 5., the commission may engage outside consultants

433 and counsel. All expenses associated with such services shall be

434 included as part of financing costs and included in the nuclear

435 asset-recovery charge.

436 3. A financing order issued to an electric utility may

437 provide that creation of the electric utility’s nuclear asset

438 recovery property pursuant to sub-subparagraph 2.e. is

439 conditioned upon, and simultaneous with, the sale or other

440 transfer of the nuclear asset-recovery property to an assignee

441 and the pledge of the nuclear asset-recovery property to secure

442 nuclear asset-recovery bonds.

443 4. If the commission issues a financing order and nuclear

444 asset-recovery bonds are issued, the electric utility or

445 assignee must file with the commission at least biannually a

446 petition or a letter applying the formula-based true-up

447 mechanism pursuant to sub-subparagraph 2.d. and, based on

448 estimates of consumption for each rate class and other

449 mathematical factors, requesting administrative approval to make

450 the adjustments described in sub-subparagraph 2.d. The review of

451 such a request is limited to determining whether there is any

452 mathematical error in the application of the formula-based

453 mechanism relating to the amount of any overcollection or

454 undercollection of nuclear asset-recovery charges and the amount

455 of any adjustment. Such adjustments shall ensure the recovery of

456 revenues sufficient to provide for the timely payment of

457 principal, interest, acquisition, defeasance, financing costs,

458 or redemption premium and other fees, costs, and charges

459 relating to nuclear asset-recovery bonds approved under the

460 financing order. Within 60 days after receiving an electric

461 utility’s request pursuant to this paragraph, the commission

462 must approve the request or inform the electric utility of any

463 mathematical errors in its calculation. If the commission

464 informs the utility of mathematical errors in its calculation,

465 the utility may correct the error and refile the request. The

466 timeframes previously described in this paragraph apply to a

467 refiled request.

468 5. Within 120 days after the issuance of nuclear asset

469 recovery bonds, the electric utility shall file with the

470 commission information on the actual costs of the nuclear asset

471 recovery bonds issuance. The commission shall review, on a

472 reasonably comparable basis, such information to determine if

473 such costs incurred in the issuance of the bonds resulted in the

474 lowest overall costs that were reasonably consistent with market

475 conditions at the time of the issuance and the terms of the

476 financing order. The commission may disallow all incremental

477 issuance costs in excess of the lowest overall costs by

478 requiring the electric utility to make a credit to the capacity

479 cost recovery clause in an amount equal to the excess of actual

480 issuance costs incurred, and paid for out of nuclear asset

481 recovery bonds proceeds, and the lowest overall issuance costs

482 as determined by the commission. The commission may not make

483 adjustments to the nuclear asset-recovery charges for any such

484 excess issuance costs.

485 6. Subsequent to the transfer of nuclear asset-recovery

486 property to an assignee or the issuance of nuclear asset

487 recovery bonds authorized thereby, whichever is earlier, a

488 financing order is irrevocable and, except as provided in

489 subparagraph 4. and paragraph (d), the commission may not amend,

490 modify, or terminate the financing order by any subsequent

491 action or reduce, impair, postpone, terminate, or otherwise

492 adjust nuclear asset-recovery charges approved in the financing

493 order. After the issuance of a financing order, the electric

494 utility retains sole discretion regarding whether to assign,

495 sell, or otherwise transfer nuclear asset-recovery property or

496 to cause nuclear asset-recovery bonds to be issued, including

497 the right to defer or postpone such assignment, sale, transfer,

498 or issuance. If the electric utility decides not to cause

499 nuclear asset-recovery bonds to be issued, the electric utility

500 may not recover financing costs, as defined in paragraph (1)(e),

501 from customers.

502 Section 8. For the purpose of incorporating the amendment

503 made by this act to section 366.82, Florida Statutes, in a

504 reference thereto, section 553.975, Florida Statutes, is

505 reenacted to read:

506 553.975 Report to the Governor and Legislature.—The Public

507 Service Commission shall submit a biennial report to the

508 Governor, the President of the Senate, and the Speaker of the

509 House of Representatives, concurrent with the report required by

510 s. 366.82(10), beginning in 1990. Such report shall include an

511 evaluation of the effectiveness of these standards on energy

512 conservation in this state.

513 Section 9. This act shall take effect July 1, 2025.

265

the organization in writing of his or her intention to file such

266

a petition. Such notification must:

267

1.

Be delivered by certified mail, return receipt

268

requested, to the name and mailing address provided by the

269

organization for customer service or other external inquiries or

270

be served upon organization’s registered agent, if the

271

organization has one; and

272

2.

Make specific allegations regarding the manner in which

273

the organization does not meet the definition of a qualifying

274

nonprofit organization under s. 367.021.

275

(b)

The organization shall have 90 days after receipt of

276

such notice to respond to such writing, or by e-mail if the

277

person has provided an e-mail address for such response.

278

However, the organization may not respond to the notice if it so

279

chooses;

280

(c)

After the expiration of the 90 days provided in

281

paragraph (b), if the person is dissatisfied with the response

282

of the governing body, such person may file the petition to

283

initiate the commission proceeding provided for in this

284

subsection. In filing such a petition, the person must, at

285

minimum, include the following:

286

1.

The initial notification to the organization as provided

287

in paragraph (a);

288

2.

The response of the organization as provided in

289

paragraph (b) or, if a response has not been received, a

290

statement attesting to such; and

291

3.

Specific allegations regarding the manner in which the

292

organization does not meet the definition of a qualifying

293

nonprofit organization under s. 367.021.

294

(2) In making its determination as to whether an

295

organization meets the definition of a qualifying organization

296

pursuant to a petition filed under subsection (1), the

297

commission shall consider:

298

(a) The governing documents of the organization;

299

(b) The conduct of the organization;

300

(c)

The conduct of the governing board of the organization;

301

and

302

(d)

Any other relevant information provided by the

303

organization, or other party to the proceeding, demonstrating

304

whether the organization meets such definition.

305

(3) If the commission determines that an organization does

306

not meet the definition of a qualifying nonprofit organization,

307

the commission must provide the organization reasoning for its

308

determination and allow the organization 90 days to address the

309

commission’s determination.

310

(4) If, after the expiration of the 90-day period specified

311

in subsection (3), the commission maintains its determination

312

that the organization does not meet the definition of a

313

qualifying nonprofit organization, the commission must issue an

314

order stating that the organization is not exempt from the

315

jurisdiction of the commission pursuant to s. 367.022 and must

316

be regulated as a utility under this chapter.

317

(5) The commission shall follow the procedures established

318

in s. 367.171(2) for an organization determined to be not exempt

319

from the jurisdiction of the commission under subsection (4).

320

The commission shall follow such procedures as if the

321

organization were an established utility in a county newly

322

entering into the commission’s jurisdiction.

323

(6) After a period of 24 months, an organization that is

324

determined to be not exempt from the jurisdiction of the

325

commission under subsection (4) may petition the commission to

326

regain qualifying nonprofit organization status. In reviewing

327

this petition, the commission shall use the procedure

328

established in subsections (2), (3), and (4) of this section. If

329

the commission does not approve the petition, the organization

330

must wait an additional 24 months before petitioning the

331

commission again for qualifying nonprofit organization status.

332

(7)

Consistent with the commission’s jurisdiction over

333

utility rates and service, issues relating to whether an

334

organization is exempt from its jurisdiction pursuant to this

335

section, and the manner in which a utility is brought under its

336

jurisdiction pursuant to this section, must be resolved by the

337

commission.

338

(8)

The commission shall adopt rules to implement and

339

administer this section and shall propose a rule for adoption as

340

soon as practicable after July 1, 2026.

341 Section 10.

The Public Service Commission shall

submit a

342

propose

d

rule for adoption

which implements

the amendments

made

343

by this act

to s. 366.96, Florida Statutes, as soon as

344

practicable after the effective date of this act, but not later

345

than October 31, 2025.

346 Section 11. Paragraph (b) of subsection (2) of section

347 288.0655, Florida Statutes, is amended to read:

348 288.0655 Rural Infrastructure Fund.—

349 (2)

350 (b) To facilitate access of rural communities and rural

351 areas of opportunity as defined by the Rural Economic

352 Development Initiative to infrastructure funding programs of the

353 Federal Government, such as those offered by the United States

354 Department of Agriculture and the United States Department of

355 Commerce, and state programs, including those offered by Rural

356 Economic Development Initiative agencies, and to facilitate

357 local government or private infrastructure funding efforts, the

358 department may award grants for up to 75 percent of the total

359 infrastructure project cost, or up to 100 percent of the total

360 infrastructure project cost for a project located in a rural

361 community as defined in s. 288.0656(2) which is also located in

362 a fiscally constrained county as defined in s. 218.67(1) or a

363 rural area of opportunity as defined in s. 288.0656(2). Eligible

364 uses of funds may include improving any inadequate

365 infrastructure that has resulted in regulatory action that

366 prohibits economic or community growth and reducing the costs to

367 community users of proposed infrastructure improvements that

368 exceed such costs in comparable communities. Eligible uses of

369 funds include improvements to public infrastructure for

370 industrial or commercial sites and upgrades to or development of

371 public tourism infrastructure. Authorized infrastructure may

372 include the following public or public-private partnership

373 facilities: storm water systems; telecommunications facilities;

374 roads or other remedies to transportation impediments; nature

375 based tourism facilities; or other physical requirements

376 necessary to facilitate tourism, trade, and economic development

377 activities in the community. Authorized infrastructure may also

378 include publicly or privately owned self-powered nature-based

379 tourism facilities, publicly owned telecommunications

380 facilities, and additions to the distribution facilities of the

381 existing natural gas utility as defined in s. 366.04(3)(c), the

382 existing electric utility as defined in s. 366.02, or the

383 existing water or wastewater utility as defined in

s.

384

367.021(14)

s. 367.021(12)

, or any other existing water or

385 wastewater facility, which owns a gas or electric distribution

386 system or a water or wastewater system in this state when:

387 1. A contribution-in-aid of construction is required to

388 serve public or public-private partnership facilities under the

389 tariffs of any natural gas, electric, water, or wastewater

390 utility as defined herein; and

391 2. Such utilities as defined herein are willing and able to

392 provide such service.

393 Section 12. Paragraph (b) of subsection (5) of section

394 377.814, Florida Statutes, is amended to read:

395 377.814 Municipal Solid Waste-to-Energy Program.—

396 (5) FUNDING.—

397 (b) Funds awarded under the grant programs set forth in

398 this section may not be used to support, subsidize, or enable

399 the sale of electric power generated by a municipal solid waste

400 to-energy facility to any small electric utility eligible to

401 petition the commission under

s. 366.06(5)

s. 366.06(4)

.

402 Section 13. Section 624.105, Florida Statutes, is amended

403 to read:

404 624.105 Waiver of customer liability.—Any regulated company

405 as defined in s. 350.111, any electric utility as defined in s.

406 366.02(4), any utility as defined in

s. 367.021(14)

s.

407

367.021(12)

or s. 367.022(2) and (7), and any provider of

408 communications services as defined in s. 202.11(1) may charge

409 for and include an optional waiver of liability provision in

410 their customer contracts under which the entity agrees to waive

411 all or a portion of the customer’s liability for service from

412 the entity for a defined period in the event of the customer’s

413 call to active military service, death, disability, involuntary

414 unemployment, qualification for family leave, or similar

415 qualifying event or condition. Such provisions may not be

416 effective in the customer’s contract with the entity unless

417 affirmatively elected by the customer. No such provision shall

418 constitute insurance so long as the provision is a contract

419 between the entity and its customer.

420 Section 14. This act shall take effect July 1, 2025.