Florida Senate
-
2025
CS for SB 354
By
Senator Gaetz
the Committee on Regulated Industries; and Senator Gaetz
1-00565-25 2025354__580-02348-25 2025354c1
1 A bill to be entitled
2 An act relating to the Florida Public Service Commission;
3 Commission; amending s. 350.01, F.S.; revising the membership of
4 membership of the Florida Public Service Commission; amending s. 366.06,
5 creating s. 350.129, F.S.; requiring thethat commission to establish a certainorders
6 issued by the commission contain adequate support for
7 any conclusions made by the commission; requiring the
8 commission to provide an explanation and a discussion
9 of major elements of the settlement when issuing an
10 order accepting or denying certain settlement
611 scheduleagreements; amending s. 366.8106, F.S.; revisingrequiring the
12 commission to keep the allowable return on equity for
13 public utilities close to the risk-free rate of return
14 and require that upward deviations away from the risk
15 free rate be specifically justified by the public
716 legislativeutility findingsseeking anda intenttariff modification; amending s. 366.82,
17 366.07, F.S.; requiring the commission to establish a
18 schedule by which rate change requests may be
19 submitted to the commission by each public utility
20 company; creating s. 366.077, F.S.; requiring the
21 commission to provide a report to the Governor and the
22 Legislature by a specified date each year; providing
23 requirements for such report; amending s. 366.96,
824 F.S.; revisingrequiring thethat requirementsimprovements forincluded thein annual reportcertain
25 transmission and distribution storm protection plans
26 have forecasted customer benefits exceeding their
27 forecasted cost; revising the factors that the Public
928 providedService byCommission themust commissionconsider toin thereviewing Governor and thesuch
29 plans; deleting obsolete language; amending s.
1030 Legislature367.021, F.S.; reenactingdefining ssterms; amending s. 366367.8255(4)022,
31 F.S.; revising the types of nonprofit organizations
32 which are exempt from commission jurisdiction;
1133 366creating s.8260(2)(b), and 366367.95(2)(c)24, F.S.,; relatingauthorizing tothe commission
12 environmental cost recovery, storm-recovery financing,
34 to initiate a proceeding to determine whether an
35 organization is a qualifying nonprofit organization;
36 requiring a person to notify an organization before
1337 andfiling financinga petition for certainsuch nuclearproceeding; generating assetproviding
38 requirements for such notification; authorizing an
39 organization to respond to such notice in a certain
40 manner and in a specified timeframe after receipt;
41 authorizing a person to file a petition to initiate a
42 proceeding to determine whether an organization is a
43 qualifying nonprofit organization after a specified
44 timeframe under certain circumstances; providing
1445 retirementrequirements orfor abandonmentsuch costs,petition; respectively,requiring tothe
46 commission to consider certain information in making
47 its determination of whether an organization is a
48 qualifying nonprofit organization; requiring the
49 commission to provide its reasoning for a
50 determination that an organization is not a qualifying
51 nonprofit organization; requiring the commission to
52 allow such organization a certain period of time in
1553 incorporatewhich to address the amendmentcommission’s made to s. 366.06, F.S., indetermination;
16 references thereto; reenacting s. 553.975, F.S.,
54 requiring the commission, under certain circumstances,
55 to issue an order stating that the organization is not
1756 relatingexempt tofrom the reportjurisdiction toof the Governorcommission and
18 Legislature, to incorporate the amendment made to s.
19 366.82, F.S., in a reference thereto; providing an
20 effective date.
21
22 Be It Enacted by the Legislature of the State of Florida:
23
24 Section 1. Subsection (1) of section 350.01, Florida
25 Statutes, is amended to read:
57 must be regulated as a utility; requiring the
58 commission to follow specified procedures for an
2659 350.01 Floridaorganization Publicnot Serviceexempt Commission;from termsthe ofcommission’s
60 jurisdiction; authorizing an organization to petition
61 the commission to regain qualifying nonprofit
62 organization status under certain circumstances;
63 requiring a specified waiting period before certain
64 organizations may petition to regain qualifying
65 nonprofit organization status; requiring the
27 commissioners66 commission to adopt rules for a certain purpose; vacancies; election and duties of chair; quorum;
28 proceedings; public records and public meetings exemptions.—
29 (1) The Florida Public Service Commission shall
67 requiring the commission to submit a proposed rule by
68 a specified date; amending ss. 288.0655, 377.814, and
69 624.105, F.S.; conforming cross-references; providing
70 an effective date.
71
72 Be It Enacted by the Legislature of the State of Florida:
73
74 Section 1. Subsection (1) of section 350.01, Florida
75 Statutes, is amended to read:
76 350.01 Florida Public Service Commission; terms of
77 commissioners; vacancies; election and duties of chair; quorum;
78 proceedings; public records and public meetings exemptions.—
79 (1) The Florida Public Service Commission shall
be composed
3080
consist
3 párrafos sin cambios
of
seven
five
commissioners appointed pursuant to s.
3181 350.031.
One member must be a certified public accountant, and
3282
one member must be a chartered financial analyst.
3383 Section 2. SubsectionSection (1) of section 366350.06129, Florida Statutes, is created to
34 Statutes, is amended to read:
35 366.06 Rates; procedure for fixing and changing.—
36 (1) A public utility
may
shall
not, directly or indirectly,
37 charge or receive any rate not on file with the commission for
38 the particular class of service involved
, and no change shall be
39
made in any schedule
. All applications for changes in rates
must
40
shall
be made to the commission in writing under rules and
84 read:
85
350.129
Orders of the Florida Public Service Commission
.—
86
41 regulations(1) All prescribed,orders andissued by the commission must contain
has
shall have
the
42 authority to determine and fix fair, just, and reasonable rates
43 that may be requested, demanded, charged, or collected by any
44 public utility for its service. The commission shall investigate
45 and determine the actual legitimate costs of the property of
46 each utility company,
of what is
actually used and useful in the
47 public service, and shall keep a current record of the net
48 investment of each public utility company in such property
of
87
adequate support for the commission’s conclusions, including the
88
specific facts and factors on which the conclusions are based.
89
While the commission may make conclusions based upon the public
90
49 which valueinterest, as determinedprovided byin chapters 350-368, the commission, shall
must
shall
be used
50 for ratemaking purposes and
shall
be the money honestly and
51 prudently invested by the public utility company in such
52 property used and useful in serving the public, less accrued
53 depreciation, and
may
shall
not include any goodwill or going
54 concern value or franchise value in excess of payment made
55 therefor. In fixing fair, just, and reasonable rates for each
56 customer class, the commission shall, to the extent practicable,
57 consider the cost of providing service to the class, as well as
58 the rate history, value of service, and experience of the public
59 utility; the consumption and load characteristics of the various
60 classes of customers; and public acceptance of rate structures.
6191
specify in its orders a rationale for its conclusions.
92
(2) For commission orders that affect substantial interests
93
pursuant to s. 120.569, when issuing an order accepting or
94
denying a settlement agreement reached by any of the parties to
95
a proceeding, the commission shall provide a reasoned
96
explanation, citing the specific facts and factors on which it
97
relied. In addition, the commission shall provide in its order a
98
discussion of the major elements of the settlement and a
99
rationale for its conclusions.
100 Section 3. Present subsection (4) of section 366.06,
101 Florida Statutes, is redesignated as subsection (5), and a new
102 subsection (4) is added to that section, to read:
103 366.06 Rates; procedure for fixing and changing.—
104
(4) In order to best meet the needs of Florida households,
105
the commission shall work to keep the allowable return on equity
106
for public utilities
close to the risk-free rate of return and
107
shall require that upward deviations from the risk-free rate be
108
specifically justified by the
public
utility seeking a tariff
109
modification.
110 Section 4. Section 366.07, Florida Statutes, is amended to
111 read:
112 366.07 Rates; adjustment.—
113
(1)
Whenever the commission, after public hearing either
114 upon its own motion or upon complaint, shall find the rates,
115 rentals, charges or classifications, or any of them, proposed,
116 demanded, observed, charged or collected by any public utility
117 for any service, or in connection therewith, or the rules,
118 regulations, measurements, practices or contracts, or any of
119 them, relating thereto, are unjust, unreasonable, insufficient,
120 excessive, or unjustly discriminatory or preferential, or in
121 anywise in violation of law, or any service is inadequate or
122 cannot be obtained, the commission shall determine and by order
123 fix the fair and reasonable rates, rentals, charges or
124 classifications, and reasonable rules, regulations,
125 measurements, practices, contracts or service, to be imposed,
126 observed, furnished or followed in the future.
127
(2)
The
3 párrafos sin cambios
commission
shall establish
a schedule
by which
rate change
62
128
change requests
may
be submitted
to the commission
by each
129
public utility company.
130 Section 5. Section 366.077, Florida Statutes, is created to
131 read:
132
366.077 Report on rates.—The commission shall
publicsubmit
63
utility company.
64 Section 3. Section 366.81, Florida Statutes, is amended to
65 read:
an
133
annual report
to
66 366.81 Legislativethe findingsGovernor and intent.—Thethe Legislature by
67 finds and declares that it is critical to
use
utilize
the most
68 efficient and cost-effective demand-side renewable energy
69 systems and conservation systems in order to protect the health,
70 prosperity, and general welfare of the state and its citizens.
71 Reduction in, and control of, the growth rates of electric
72 consumption and of weather-sensitive peak demand are of
73 particular importance. The Legislature further finds that the
74 Florida Public Service Commission is the appropriate agency to
75 adopt goals and approve plans related to the promotion of
76 demand-side renewable energy systems and the conservation of
77 electric energy and natural gas usage. The Legislature directs
78 the commission to develop and adopt overall goals and authorizes
79 the commission to require each utility to develop plans and
80 implement programs for increasing energy efficiency and
81 conservation and demand-side renewable energy systems within its
82 service area, subject to the approval of the commission.
In
83
order to best meet the needs of Florida households, the
84
commission
shall work to keep the allowable return on equity
85
close to the risk-free rate of return and shall require that
86
upward deviations away from the risk-free rate be specifically
87
justified by the utility seeking a tariff modification
each
March
134
1.
Since
88 solutions to our energy problems are complex, the Legislature
89 intends that the use of solar energy, renewable energy sources,
90 highly efficient systems, cogeneration, and load-control systems
91 be encouraged. Accordingly, in exercising its jurisdiction, the
92 commission
may
shall
not approve any rate or rate structure
93 which discriminates against any class of customers on account of
94 the use of such facilities, systems, or devices. This expression
95 of legislative intent
may
shall
not be construed to preclude
96 experimental rates, rate structures, or programs. The
97 Legislature further finds and declares that ss. 366.80-366.83
98 and 403.519 are to be liberally construed in order to meet the
99 complex problems of reducing and controlling the growth rates of
100 electric consumption and reducing the growth rates of weather
101 sensitive peak demand; increasing the overall efficiency and
102 cost-effectiveness of electricity and natural gas production and
103 use; encouraging further development of demand-side renewable
104 energy systems; and conserving expensive resources, particularly
105 petroleum fuels.
106 Section 4. Subsection (10) of section 366.82, Florida
107 Statutes, is amended to read:
108 366.82 Definition; goals; plans; programs; annual reports;
109 energy audits.—
110 (10) The commission shall require periodic reports from
111 each utility and shall provide the
Governor and the
Legislature
112
and the Governor
with an annual report by March 1 of the goals
113 it has adopted and its progress toward meeting those goals. The
114 commission shall also consider the performance of each utility
115 pursuant to ss. 366.80-366.83 and 403.519 when establishing
116 rates for those utilities over which the commission has
117 ratesetting authority.
118
135
(1)
The report must include all of the following:
136
(a)
The annual report must include all of the following:
119
1.
An investigation of contemporary
economic analysis
120
137
related to
rate changes in this state
.
121
2.
138
(b)
An analysis of potential
cost impact
s
to utility
122
139
customers
ofin this state
if excess returns on equity have
123
140
occurred, and
potential
, if such excess returns have not occurred at a
141
significant rate,
any resulting
cost savings, if any, to customers if
such
customers.
124142
(c)
theAn excessanalysis of returns toon equity models presented by
have
not occurred
at a significant
143
public utilities and used by the commission to determine
144
approved returns on equity for public utilities in this state.
125145
rate
Such analysis must:
146
1.
126
Compare models used by federal agencies and other state
147
utility regulatory bodies with those used by the commission;
148
2.
Determine whether the models used are generally
149
financially logical; and
150
3.
An analysis of a
lternative rate
-
of
-
return scenarios
,
Determine whether the models used comport with generally
151
accepted economic theory both inside and outside of the utility
127152
including an investigation of
the rationale for
why
such
128
scenarios
were not chosen in the past,
and an investigation of
129
the applicability of such scenarios
for the future.
industry.
130153
4.
(d)
An assessment
of
long-term impacts and economic
131
, including the
154
economic repercussions
of
rising rates of regulated returns on equity
,
to
132
155
utilities and their customers
in the future
.
133
5.
156
(e)
A summary
providing detailed information regarding the
157
detailing the compensation of the executive officers of each public utility
134
158
officersproviding service to the residents of all public utilities servicing this state, or the
135159
executive officers of theirpublic utility’s affiliated companies or parent
136160
company,
includin
parent company. Such information must include, but need not be
161
g, but not limited to,
salaries, benefits, stock options, bonuses, stock
137
stock options, bonuses, stock buybacks
162
buybacks
,
and other taxable payments,
138
payments,
expressed both
as dollar
163
as dollar amounts and as a
percentage
139
percentage of the entity’s total revenue
. The
164
summary
must include
the
140
profits and losses
of each entity as
165
of each entity as reported in its financial statements
141
statements
a
nd
must highlight any
166
highlight any compensation
exceedingthat exceeds the
industry average
142
average
. The office shall also include in the report any
143
. The commission
167
shall also include any rationale provided by thea insurerpublic justifying compensationutility
144
168
justifying compensation exceeding the industry average and, for each insurer, an
145
169
each public utility, an explanation ofas to how specific data gathered during the creation of
146
the report
170
gathered during the compiling of information
inform
ed
the office’s
the
171
commission’s
decisions
on that insurer’s
on the public utility’s rate
change
147172
rate
change requests.
148
173
(b2)
The report
4 párrafos sin cambios
must
provide benchmarking
,
comparing
public
149174
utilities
providing service to the residents of this state with
175
servicing this state with public utilities servicingproviding service to the residents of
150
other
176
other states
, including
commentary
on all findings
.
151177 Section 56. ForSubsections the(4) purposeand (11) of incorporatingsection the amendment366.96,
152 made by this act to section 366.06, Florida Statutes, in a
153 reference thereto, subsection (4) of section 366.8255, Florida
154178 Florida Statutes, isare reenactedamended to read:
155179 366.825596 EnvironmentalStorm protection plan cost recovery.—
156 (4) Environmental compliance costs recovered through the
157 environmental cost-recovery factor shall be allocated to the
158 customer classes using the criteria set out in s. 366.06(1),
159 taking into account the manner in which similar types of
160 investment or expense were allocated in the company’s last rate
161 case.
162 Section 6. For the purpose of incorporating the amendment
163 made by this act to section 366.06, Florida Statutes, in a
164 reference thereto, paragraph (b) of subsection (2) of section
165 366.8260, Florida Statutes, is reenacted to read:
166 366.8260 Storm-recovery financing.—
167180 (24) FINANCING ORDERS.—
168 (b)1. Proceedings on a petition submitted pursuant to
169 paragraph (a) shall begin with a petition by an electric utility
170 and shall be disposed of in accordance with the provisions of
171 chapter 120 and applicable rules, except that the provisions of
172 this section, to the extent applicable, shall control.
173 a. Within 7 days after the filing of a petition, the
174 commission shall publish a case schedule, which schedule shall
175 place the matter before the commission on an agenda that will
176 permit a commission decision no later than 120 days after the
177 date the petition is filed.
178 b. No later than 135 days after the date the petition is
179 filed, the commission shall issue a financing order or an order
180 rejecting the petition. A party to the commission proceeding may
181 petition the commission for reconsideration of the financing
182 order within 5 days after the date of its issuance. The
183 commission shall issue a financing order authorizing financing
184 of reasonable and prudent storm-recovery costs, the storm
185 recovery reserve amount determined appropriate by the
186 commission, and financing costs if the commission finds that the
187 issuance of the storm-recovery bonds and the imposition of
188 storm-recovery charges authorized by the order are reasonably
189 expected to result in lower overall costs or would avoid or
190 significantly mitigate rate impacts to customers as compared
191 with alternative methods of financing or recovering storm
192 recovery costs and storm-recovery reserve. Any determination of
193 whether storm-recovery costs are reasonable and prudent shall be
194 made with reference to the general public interest in, and the
195 scope of effort required to provide, the safe and expeditious
196 restoration of electric service.
197 2. In a financing order issued to an electric utility, the
198 commission shall:
199 a. Except as provided in sub-subparagraph f. and in
200 subparagraph 4., specify the amount of storm-recovery costs and
201 the level of storm-recovery reserves, taking into consideration,
202 to the extent the commission deems appropriate, any other
203 methods used to recover these costs, and describe and estimate
204 the amount of financing costs which may be recovered through
205 storm-recovery charges; and specify the period over which such
206 costs may be recovered.
207 b. Determine that the proposed structuring, expected
208 pricing, and financing costs of the storm-recovery bonds are
209 reasonably expected to result in lower overall costs or would
210 avoid or significantly mitigate rate impacts to customers as
211 compared with alternative methods of financing or recovering
212 storm-recovery costs.
213 c. Provide that, for the period specified pursuant to sub
214 subparagraph a., the imposition and collection of storm-recovery
215 charges authorized in the financing order shall be paid by all
At a minimum, any improvement included in a
181
216 customers receiving transmission orand distribution service fromstorm
217 the electric utility or its successors or assignees under
218 commission-approved rate schedules or under special contracts,
219 even if the customer elects to purchase electricity from an
220 alternative electric supplier following a fundamental change in
221 regulation of public utilities in the state.
222 d. Determine what portion, if any, of the storm-recovery
223 reserves must be held in a funded reserve and any limitations on
224 how the reserve may be held, accessed, or used.
225 e. Include a formula-based mechanism for making expeditious
226 periodic adjustments in the storm-recovery charges that
227 customers are required to pay under the financing order and for
228 making any adjustments that are necessary to correct for any
229 overcollection or undercollection of the charges or to otherwise
230 ensure the timely payment of storm-recovery bonds and financing
231 costs and other required amounts and charges payable in
232 connection with the storm-recovery bonds.
233 f. Specify the storm-recovery property that is, or shall
234 be, created in favor of an electric utility or its successors or
235 assignees and that shall be used to pay or secure storm-recovery
236 bonds and financing costs.
237 g. Specify the degree of flexibility to be afforded to the
238 electric utility in establishing the terms and conditions of the
239 storm-recovery bonds, including, but not limited to, repayment
240 schedules, interest rates, and other financing costs.
241 h. Provide that storm-recovery charges be allocated to the
242 customer classes using the criteria set out in s. 366.06(1), in
243 the manner in which these costs or their equivalent were
244 allocated in the cost-of-service study approved in connection
245 with the electric utility’s last rate case. If the electric
246 utility’s last rate case was resolved by a settlement agreement,
247 the cost-of-service methodology filed by the electric utility in
248 that case shall be used.
249 i. Provide that, after the final terms of an issuance of
250 storm-recovery bonds have been established and prior to the
251 issuance of storm-recovery bonds, the electric utility shall
252 determine the resulting initial storm-recovery charge in
253 accordance with the financing order and such initial storm
254 recovery charge shall be final and effective upon the issuance
255 of such storm-recovery bonds without further commission action.
256 j. Include any other conditions that the commission
257 considers appropriate and that are not otherwise inconsistent
258 with this section.
protection plan
filed
182
pursuant to this section must have a forecasted customer benefit
183
exceeding its forecasted cost. In addition,
in its review of
184 each
transmission and distribution storm protection
plan filed
185 pursuant to this section, the commission shall consider:
186 (a) The extent to which the plan is expected to reduce
187 restoration costs and outage times associated with extreme
188 weather events and enhance reliability, including whether the
189 plan prioritizes areas of lower reliability performance
and
190
whether the cost of implementing the plan is reasonable and
191
prudent given the expected benefit
.
192 (b) The extent to which storm protection of transmission
193 and distribution infrastructure is feasible, reasonable, or
194 practical in certain areas of the utility’s service territory,
195 including, but not limited to, flood zones and rural areas.
196 (c) The estimated costs and benefits to the utility and its
197 customers of making the improvements proposed in the plan.
198 (d) The estimated annual rate impact resulting from
199 implementation of the plan during the first 3 years addressed in
200 the plan.
201
(e) The performance of previously approved plan
202
improvements in reducing outage times and storm restoration
203
costs.
204 (11) The commission shall adopt rules to implement and
205 administer this section
and shall propose a rule for adoption as
206
soon as practicable after the effective date of this act, but
207
not later than October 31, 2019
.
208 Section 7. Present subsections (7), (8), and (9) and (10)
209 through (13) of section 367.021, Florida Statutes, are
210 redesignated as subsections (8), (9), and (10) and (12) through
211 (15), respectively, and new subsections (7) and (11) are added
212 to that section, to read:
213 367.021 Definitions.—As used in this chapter, the following
214 words or terms shall have the meanings indicated:
215
(7) “Governing board” means a board of directors, nonprofit
216
board, board of trustees, corporate governing body as
217
established in the in the bylaws or articles of incorporation of
218
an organization, or similar body overseeing the operations of an
219
organization.
220
(11)
“Qualifying nonprofit organization” means an
221
organization that meets all of the following criteria:
222
(a)
The organization is a nonprofit corporation,
223
association, or cooperative providing service solely to members
224
who own and control such nonprofit corporation, association, or
225
cooperative.
226
(b)
The organization conducts open and fair elections to
227
its governing board at an annual meeting of its members. The
228
term of any one governing board member may not exceed 36 months;
229
however, a candidate may run for reelection without any limit on
230
the number of terms they may serve.
231
(c)
At least 75 percent of the governing board of the
232
organization is made up of the organization’s members.
233
(d)
The organization provides a mechanism for members of
234
the organization to directly nominate candidates directly for
235
the governing board. At a minimum, any member or candidate who
236
obtains the signatures of at least 1 percent of members of the
237
organization on a petition for nomination for a particular board
238
position or election must, as established by that organization’s
239
bylaws, be allowed to stand for election in the same manner as
240
if that member had been nominated by the existing governing
241
board, a committee on nominations established by the board, or
242
other nomination mechanism or procedure as established by the
243
organization’s governing documents. Such candidate must meet all
244
other requirements established by law or by the organization’s
245
governing documents to serve on the board.
246
(e) The organization is not subject to disqualification
247
pursuant to s. 367.24.
248 Section 8. Subsection (7) of section 367.022, Florida
249 Statutes, is amended to read:
250 367.022 Exemptions.—The following are not subject to
251 regulation by the commission as a utility nor are they subject
252 to the provisions of this chapter, except as expressly provided:
253 (7)
Qualifying nonprofit organizations
Nonprofit
254
corporations, associations, or cooperatives providing service
255
solely to members who own and control such nonprofit
256
corporations, associations, or cooperatives
.
257 Section 9. Section 367.24, Florida Statutes, is created to
258 read:
259
260 In performing the responsibilities of this subparagraph and
261 subparagraph 5., the commission may engage outside consultants
262 or counsel. Any expenses associated with such services shall be
263 included as part of financing costs and included in storm
264 recovery charges.
265 3. A financing order issued to an electric utility may
266 provide that creation of the electric utility’s storm-recovery
267 property pursuant to sub-subparagraph 2.f. is conditioned upon,
268 and shall be simultaneous with, the sale or other transfer of
269 the storm-recovery property to an assignee and the pledge of the
270 storm-recovery property to secure storm-recovery bonds.
271 4. If the commission issues a financing order, the electric
272 utility shall file with the commission at least biannually a
273 petition or a letter applying the formula-based mechanism
274 pursuant to sub-subparagraph 2.e. and, based on estimates of
275 consumption for each rate class and other mathematical factors,
276 requesting administrative approval to make the adjustments
277 described in sub-subparagraph 2.e. The review of such a request
367.24 Disqualification from exempt status.—
260
(1)
The commission may, upon its own motion or petition by
261
278 shallany beperson, limitedinitiate a proceeding to determiningdetermine whether there is anyan
279 mathematical error in the application of the formula-based
280 mechanism relating to the appropriate amount of any
281 overcollection or undercollection of storm-recovery charges and
282 the amount of an adjustment. Such adjustments shall ensure the
283 recovery of revenues sufficient to provide for the payment of
284 principal, interest, acquisition, defeasance, financing costs,
285 or redemption premium and other fees, costs, and charges in
286 respect of storm-recovery bonds approved under the financing
287 order. Within 60 days after receiving an electric utility’s
288 request pursuant to this paragraph, the commission shall either
289 approve the request or inform the electric utility of any
290 mathematical errors in its calculation. If the commission
291 informs the utility of mathematical errors in its calculation,
292 the utility may correct its error and refile its request. The
293 timeframes previously described in this paragraph shall apply to
294 a refiled request.
295 5. Within 120 days after the issuance of storm-recovery
296 bonds, the electric utility shall file with the commission
297 information on the actual costs of the storm-recovery bond
298 issuance. The commission shall review such information to
299 determine if such costs incurred in the issuance of the bonds
300 resulted in the lowest overall costs that were reasonably
301 consistent with market conditions at the time of the issuance
302 and the terms of the financing order. The commission may
303 disallow any incremental issuance costs in excess of the lowest
304 overall costs by requiring the utility to make a contribution to
305 the storm reserve in an amount equal to the excess of actual
306 issuance costs incurred, and paid for out of storm-recovery bond
307 proceeds, and the lowest overall issuance costs as determined by
308 the commission. The commission may not make adjustments to the
309 storm-recovery charges for any such excess issuance costs.
310 6. Subsequent to the earlier of the transfer of storm
311 recovery property to an assignee or the issuance of storm
312 recovery bonds authorized thereby, a financing order is
313 irrevocable and, except as provided in subparagraph 4. and
314 paragraph (c), the commission may not amend, modify, or
315 terminate the financing order by any subsequent action or
316 reduce, impair, postpone, terminate, or otherwise adjust storm
317 recovery charges approved in the financing order. After the
318 issuance of a financing order, the electric utility retains sole
319 discretion regarding whether to assign, sell, or otherwise
320 transfer storm-recovery property or to cause the storm-recovery
321 bonds to be issued, including the right to defer or postpone
322 such assignment, sale, transfer, or issuance.
323 Section 7. For the purpose of incorporating the amendment
324 made by this act to section 366.06, Florida Statutes, in a
325 reference thereto, paragraph (c) of subsection (2) of section
326 366.95, Florida Statutes, is reenacted to read:
327 366.95 Financing for certain nuclear generating asset
328 retirement or abandonment costs.—
329 (2) FINANCING ORDERS.—
330 (c)1. Proceedings on a petition submitted pursuant to
331 paragraph (a) begin with the petition by an electric utility,
332 filed subject to the timeframe specified in paragraph (b), if
333 applicable, and shall be disposed of in accordance with chapter
334 120 and applicable rules, except that this section, to the
335 extent applicable, controls.
262
organization meets the definition of a qualifying nonprofit
263
organization under s. 367.021.
264
(a)
336 a. WithinA 7person daysmust, after thebefore filing ofsuch a petition, thenotify
337 commission shall publish a case schedule, which must place the
338 matter before the commission on an agenda that permits a
339 commission decision no later than 120 days after the date the
340 petition is filed.
341 b. No later than 135 days after the date the petition is
342 filed, the commission shall issue a financing order or an order
343 rejecting the petition. A party to the commission proceeding may
344 petition the commission for reconsideration of the financing
345 order within 5 days after the date of its issuance. The
346 commission shall issue a financing order authorizing the
347 financing of reasonable and prudent nuclear asset-recovery costs
348 and financing costs if the commission finds that the issuance of
349 the nuclear asset-recovery bonds and the imposition of nuclear
350 asset-recovery charges authorized by the financing order have a
351 significant likelihood of resulting in lower overall costs or
352 would avoid or significantly mitigate rate impacts to customers
353 as compared with the traditional method of financing and
354 recovering nuclear asset-recovery costs. Any determination of
355 whether nuclear asset-recovery costs are reasonable and prudent
356 shall be made with reference to the general public interest and
357 in accordance with paragraph (b), if applicable.
358 2. In a financing order issued to an electric utility, the
359 commission shall:
360 a. Except as provided in sub-subparagraph d. and
361 subparagraph 4., specify the amount of nuclear asset-recovery
362 costs to be financed using nuclear asset-recovery bonds, taking
363 into consideration, to the extent the commission deems
364 appropriate, any other methods used to recover these costs. The
365 commission shall describe and estimate the amount of financing
366 costs which may be recovered through nuclear asset-recovery
367 charges and specify the period over which such costs may be
368 recovered. Any such determination as to the overall time period
369 for cost recovery must be consistent with a settlement
370 agreement, if any, under paragraph (b);
371 b. Determine if the proposed structuring, expected pricing,
372 and financing costs of the nuclear asset-recovery bonds have a
373 significant likelihood of resulting in lower overall costs or
374 would avoid or significantly mitigate rate impacts to customers
375 as compared with the traditional method of financing and
376 recovering nuclear asset-recovery costs. A financing order must
377 provide detailed findings of fact addressing cost-effectiveness
378 and associated rate impacts upon retail customers and retail
379 customer classes;
380 c. Require, for the period specified pursuant to sub
381 subparagraph a., that the imposition and collection of nuclear
382 asset-recovery charges authorized under a financing order be
383 nonbypassable and paid by all existing and future customers
384 receiving transmission or distribution service from the electric
385 utility or its successors or assignees under commission-approved
386 rate schedules or under special contracts, even if a customer
387 elects to purchase electricity from an alternative electric
388 supplier following a fundamental change in regulation of public
389 utilities in this state;
390 d. Include a formula-based true-up mechanism for making
391 expeditious periodic adjustments in the nuclear asset-recovery
392 charges that customers are required to pay pursuant to the
393 financing order and for making any adjustments that are
394 necessary to correct for any overcollection or undercollection
395 of the charges or to otherwise ensure the timely payment of
396 nuclear asset-recovery bonds and financing costs and other
397 required amounts and charges payable in connection with the
398 nuclear asset-recovery bonds;
399 e. Specify the nuclear asset-recovery property that is, or
400 shall be, created in favor of an electric utility or its
401 successors or assignees and that shall be used to pay or secure
402 nuclear asset-recovery bonds and all financing costs;
403 f. Specify the degree of flexibility to be afforded to the
404 electric utility in establishing the terms and conditions of the
405 nuclear asset-recovery bonds, including, but not limited to,
406 repayment schedules, expected interest rates, and other
407 financing costs consistent with sub-subparagraphs a.-e.;
408 g. Require nuclear asset-recovery charges to be allocated
409 to the customer classes using the criteria set out in s.
410 366.06(1), in the manner in which these costs or their
411 equivalent was allocated in the cost-of-service study that was
412 approved in connection with the electric utility’s last rate
413 case and that is in effect during the nuclear asset-recovery
414 charge annual billing period. If the electric utility’s last
415 rate case was resolved by a settlement agreement, the cost-of
416 service methodology that was adopted in the settlement agreement
417 in that case and that is in effect during the nuclear asset
418 recovery charge annual billing period shall be used;
419 h. Require, after the final terms of an issuance of nuclear
420 asset-recovery bonds have been established and before the
421 issuance of nuclear asset-recovery bonds, that the electric
422 utility determine the resulting initial nuclear asset-recovery
423 charge in accordance with the financing order and that such
424 initial nuclear asset-recovery charge be final and effective
425 upon the issuance of such nuclear asset-recovery bonds without
426 further commission action so long as the nuclear asset-recovery
427 charge is consistent with the financing order; and
428 i. Include any other conditions that the commission
429 considers appropriate and that are authorized by this section.
430
431 In performing the responsibilities of this subparagraph and
432 subparagraph 5., the commission may engage outside consultants
433 and counsel. All expenses associated with such services shall be
434 included as part of financing costs and included in the nuclear
435 asset-recovery charge.
436 3. A financing order issued to an electric utility may
437 provide that creation of the electric utility’s nuclear asset
438 recovery property pursuant to sub-subparagraph 2.e. is
439 conditioned upon, and simultaneous with, the sale or other
440 transfer of the nuclear asset-recovery property to an assignee
441 and the pledge of the nuclear asset-recovery property to secure
442 nuclear asset-recovery bonds.
443 4. If the commission issues a financing order and nuclear
444 asset-recovery bonds are issued, the electric utility or
445 assignee must file with the commission at least biannually a
446 petition or a letter applying the formula-based true-up
447 mechanism pursuant to sub-subparagraph 2.d. and, based on
448 estimates of consumption for each rate class and other
449 mathematical factors, requesting administrative approval to make
450 the adjustments described in sub-subparagraph 2.d. The review of
451 such a request is limited to determining whether there is any
452 mathematical error in the application of the formula-based
453 mechanism relating to the amount of any overcollection or
454 undercollection of nuclear asset-recovery charges and the amount
455 of any adjustment. Such adjustments shall ensure the recovery of
456 revenues sufficient to provide for the timely payment of
457 principal, interest, acquisition, defeasance, financing costs,
458 or redemption premium and other fees, costs, and charges
459 relating to nuclear asset-recovery bonds approved under the
460 financing order. Within 60 days after receiving an electric
461 utility’s request pursuant to this paragraph, the commission
462 must approve the request or inform the electric utility of any
463 mathematical errors in its calculation. If the commission
464 informs the utility of mathematical errors in its calculation,
465 the utility may correct the error and refile the request. The
466 timeframes previously described in this paragraph apply to a
467 refiled request.
468 5. Within 120 days after the issuance of nuclear asset
469 recovery bonds, the electric utility shall file with the
470 commission information on the actual costs of the nuclear asset
471 recovery bonds issuance. The commission shall review, on a
472 reasonably comparable basis, such information to determine if
473 such costs incurred in the issuance of the bonds resulted in the
474 lowest overall costs that were reasonably consistent with market
475 conditions at the time of the issuance and the terms of the
476 financing order. The commission may disallow all incremental
477 issuance costs in excess of the lowest overall costs by
478 requiring the electric utility to make a credit to the capacity
479 cost recovery clause in an amount equal to the excess of actual
480 issuance costs incurred, and paid for out of nuclear asset
481 recovery bonds proceeds, and the lowest overall issuance costs
482 as determined by the commission. The commission may not make
483 adjustments to the nuclear asset-recovery charges for any such
484 excess issuance costs.
485 6. Subsequent to the transfer of nuclear asset-recovery
486 property to an assignee or the issuance of nuclear asset
487 recovery bonds authorized thereby, whichever is earlier, a
488 financing order is irrevocable and, except as provided in
489 subparagraph 4. and paragraph (d), the commission may not amend,
490 modify, or terminate the financing order by any subsequent
491 action or reduce, impair, postpone, terminate, or otherwise
492 adjust nuclear asset-recovery charges approved in the financing
493 order. After the issuance of a financing order, the electric
494 utility retains sole discretion regarding whether to assign,
495 sell, or otherwise transfer nuclear asset-recovery property or
496 to cause nuclear asset-recovery bonds to be issued, including
497 the right to defer or postpone such assignment, sale, transfer,
498 or issuance. If the electric utility decides not to cause
499 nuclear asset-recovery bonds to be issued, the electric utility
500 may not recover financing costs, as defined in paragraph (1)(e),
501 from customers.
502 Section 8. For the purpose of incorporating the amendment
503 made by this act to section 366.82, Florida Statutes, in a
504 reference thereto, section 553.975, Florida Statutes, is
505 reenacted to read:
506 553.975 Report to the Governor and Legislature.—The Public
507 Service Commission shall submit a biennial report to the
508 Governor, the President of the Senate, and the Speaker of the
509 House of Representatives, concurrent with the report required by
510 s. 366.82(10), beginning in 1990. Such report shall include an
511 evaluation of the effectiveness of these standards on energy
512 conservation in this state.
513 Section 9. This act shall take effect July 1, 2025.
265
the organization in writing of his or her intention to file such
266
a petition. Such notification must:
267
1.
Be delivered by certified mail, return receipt
268
requested, to the name and mailing address provided by the
269
organization for customer service or other external inquiries or
270
be served upon organization’s registered agent, if the
271
organization has one; and
272
2.
Make specific allegations regarding the manner in which
273
the organization does not meet the definition of a qualifying
274
nonprofit organization under s. 367.021.
275
(b)
The organization shall have 90 days after receipt of
276
such notice to respond to such writing, or by e-mail if the
277
person has provided an e-mail address for such response.
278
However, the organization may not respond to the notice if it so
279
chooses;
280
(c)
After the expiration of the 90 days provided in
281
paragraph (b), if the person is dissatisfied with the response
282
of the governing body, such person may file the petition to
283
initiate the commission proceeding provided for in this
284
subsection. In filing such a petition, the person must, at
285
minimum, include the following:
286
1.
The initial notification to the organization as provided
287
in paragraph (a);
288
2.
The response of the organization as provided in
289
paragraph (b) or, if a response has not been received, a
290
statement attesting to such; and
291
3.
Specific allegations regarding the manner in which the
292
organization does not meet the definition of a qualifying
293
nonprofit organization under s. 367.021.
294
(2) In making its determination as to whether an
295
organization meets the definition of a qualifying organization
296
pursuant to a petition filed under subsection (1), the
297
commission shall consider:
298
(a) The governing documents of the organization;
299
(b) The conduct of the organization;
300
(c)
The conduct of the governing board of the organization;
301
and
302
(d)
Any other relevant information provided by the
303
organization, or other party to the proceeding, demonstrating
304
whether the organization meets such definition.
305
(3) If the commission determines that an organization does
306
not meet the definition of a qualifying nonprofit organization,
307
the commission must provide the organization reasoning for its
308
determination and allow the organization 90 days to address the
309
commission’s determination.
310
(4) If, after the expiration of the 90-day period specified
311
in subsection (3), the commission maintains its determination
312
that the organization does not meet the definition of a
313
qualifying nonprofit organization, the commission must issue an
314
order stating that the organization is not exempt from the
315
jurisdiction of the commission pursuant to s. 367.022 and must
316
be regulated as a utility under this chapter.
317
(5) The commission shall follow the procedures established
318
in s. 367.171(2) for an organization determined to be not exempt
319
from the jurisdiction of the commission under subsection (4).
320
The commission shall follow such procedures as if the
321
organization were an established utility in a county newly
322
entering into the commission’s jurisdiction.
323
(6) After a period of 24 months, an organization that is
324
determined to be not exempt from the jurisdiction of the
325
commission under subsection (4) may petition the commission to
326
regain qualifying nonprofit organization status. In reviewing
327
this petition, the commission shall use the procedure
328
established in subsections (2), (3), and (4) of this section. If
329
the commission does not approve the petition, the organization
330
must wait an additional 24 months before petitioning the
331
commission again for qualifying nonprofit organization status.
332
(7)
Consistent with the commission’s jurisdiction over
333
utility rates and service, issues relating to whether an
334
organization is exempt from its jurisdiction pursuant to this
335
section, and the manner in which a utility is brought under its
336
jurisdiction pursuant to this section, must be resolved by the
337
commission.
338
(8)
The commission shall adopt rules to implement and
339
administer this section and shall propose a rule for adoption as
340
soon as practicable after July 1, 2026.
341 Section 10.
The Public Service Commission shall
submit a
342
propose
d
rule for adoption
which implements
the amendments
made
343
by this act
to s. 366.96, Florida Statutes, as soon as
344
practicable after the effective date of this act, but not later
345
than October 31, 2025.
346 Section 11. Paragraph (b) of subsection (2) of section
347 288.0655, Florida Statutes, is amended to read:
348 288.0655 Rural Infrastructure Fund.—
349 (2)
350 (b) To facilitate access of rural communities and rural
351 areas of opportunity as defined by the Rural Economic
352 Development Initiative to infrastructure funding programs of the
353 Federal Government, such as those offered by the United States
354 Department of Agriculture and the United States Department of
355 Commerce, and state programs, including those offered by Rural
356 Economic Development Initiative agencies, and to facilitate
357 local government or private infrastructure funding efforts, the
358 department may award grants for up to 75 percent of the total
359 infrastructure project cost, or up to 100 percent of the total
360 infrastructure project cost for a project located in a rural
361 community as defined in s. 288.0656(2) which is also located in
362 a fiscally constrained county as defined in s. 218.67(1) or a
363 rural area of opportunity as defined in s. 288.0656(2). Eligible
364 uses of funds may include improving any inadequate
365 infrastructure that has resulted in regulatory action that
366 prohibits economic or community growth and reducing the costs to
367 community users of proposed infrastructure improvements that
368 exceed such costs in comparable communities. Eligible uses of
369 funds include improvements to public infrastructure for
370 industrial or commercial sites and upgrades to or development of
371 public tourism infrastructure. Authorized infrastructure may
372 include the following public or public-private partnership
373 facilities: storm water systems; telecommunications facilities;
374 roads or other remedies to transportation impediments; nature
375 based tourism facilities; or other physical requirements
376 necessary to facilitate tourism, trade, and economic development
377 activities in the community. Authorized infrastructure may also
378 include publicly or privately owned self-powered nature-based
379 tourism facilities, publicly owned telecommunications
380 facilities, and additions to the distribution facilities of the
381 existing natural gas utility as defined in s. 366.04(3)(c), the
382 existing electric utility as defined in s. 366.02, or the
383 existing water or wastewater utility as defined in
s.
384
367.021(14)
s. 367.021(12)
, or any other existing water or
385 wastewater facility, which owns a gas or electric distribution
386 system or a water or wastewater system in this state when:
387 1. A contribution-in-aid of construction is required to
388 serve public or public-private partnership facilities under the
389 tariffs of any natural gas, electric, water, or wastewater
390 utility as defined herein; and
391 2. Such utilities as defined herein are willing and able to
392 provide such service.
393 Section 12. Paragraph (b) of subsection (5) of section
394 377.814, Florida Statutes, is amended to read:
395 377.814 Municipal Solid Waste-to-Energy Program.—
396 (5) FUNDING.—
397 (b) Funds awarded under the grant programs set forth in
398 this section may not be used to support, subsidize, or enable
399 the sale of electric power generated by a municipal solid waste
400 to-energy facility to any small electric utility eligible to
401 petition the commission under
s. 366.06(5)
s. 366.06(4)
.
402 Section 13. Section 624.105, Florida Statutes, is amended
403 to read:
404 624.105 Waiver of customer liability.—Any regulated company
405 as defined in s. 350.111, any electric utility as defined in s.
406 366.02(4), any utility as defined in
s. 367.021(14)
s.
407
367.021(12)
or s. 367.022(2) and (7), and any provider of
408 communications services as defined in s. 202.11(1) may charge
409 for and include an optional waiver of liability provision in
410 their customer contracts under which the entity agrees to waive
411 all or a portion of the customer’s liability for service from
412 the entity for a defined period in the event of the customer’s
413 call to active military service, death, disability, involuntary
414 unemployment, qualification for family leave, or similar
415 qualifying event or condition. Such provisions may not be
416 effective in the customer’s contract with the entity unless
417 affirmatively elected by the customer. No such provision shall
418 constitute insurance so long as the provision is a contract
419 between the entity and its customer.
420 Section 14. This act shall take effect July 1, 2025.