SB 1080Sesión 2025

Qué cambió entre versiones

8 párrafos cambiaron+7 palabras agregadas−9 eliminadas

El texto resaltado se agregó en la versión más reciente. El texto tachado se eliminó.

ENROLLED

2025

Legislature

CS for SB 1080, 2nd Engrossed

Second Engrossed

20251080e220251080er

1 A bill to be entitled

1

2 An act relating to local government land regulation;

860 párrafos sin cambios

3 amending s. 125.022, F.S.; requiring counties to

4 specify minimum information necessary for certain

5 applications; revising timeframes for processing

6 applications for approval of development permits or

7 development orders; defining the term “substantive

8 change”; providing refund parameters in situations

9 where the county fails to meet certain timeframes;

10 providing exceptions; amending s. 163.3180, F.S.;

11 prohibiting a school district from collecting,

12 charging, or imposing certain fees unless they meet

13 certain requirements; providing a standard of review

14 for actions challenging such fees; amending s. 553.80,

15 F.S.; specifying certain purposes for which local

16 governments may use certain fees to carry out

17 activities relating to obtaining or finalizing a

18 building permit; amending s. 163.31801, F.S.; revising

19 the voting threshold required for approval of certain

20 impact fee increase ordinances by local governments,

21 school districts, and special districts; requiring

22 that certain impact fee increases be implemented in

23 specified increments; prohibiting a local government

24 from increasing an impact fee rate beyond certain

25 phase-in limitations under certain circumstances;

26 deleting retroactive applicability; amending s.

27 163.3184, F.S.; providing that if comprehensive plan

28 amendments are not adopted at a specified hearing,

29 such amendments must be formally adopted within a

30 certain time period or they are deemed withdrawn;

31 increasing the time period within which comprehensive

32 plan amendments must be transmitted; amending s.

33 166.033, F.S.; requiring municipalities to specify

34 minimum information necessary for certain

35 applications; revising timeframes for processing

36 applications for approval of development permits or

37 development orders; defining the term “substantive

38 change”; providing refund parameters in situations

39 where the municipality fails to meet certain

40 timeframes; providing exceptions; providing effective

41 dates.

42

43 Be It Enacted by the Legislature of the State of Florida:

44

45 Section 1. Section 125.022, Florida Statutes, is amended to

46 read:

47 125.022 Development permits and orders.—

48 (1)

A county shall specify in writing the minimum

49

information that must be submitted in an application for a

50

zoning approval, rezoning approval, subdivision approval,

51

certification, special exception, or variance. A county shall

52

make the minimum information available for inspection and

53

copying at the location where the county receives applications

54

for development permits and orders, provide the information to

55

the applicant at a preapplication meeting, or post the

56

information on the county’s website.

57

(2) Within 5 business days after receiving an application

58

for approval of a development permit or development order, a

59

county shall confirm receipt of the application using contact

60

information provided by the applicant.

Within 30 days after

61 receiving an application for approval of a development permit or

62 development order, a county must review the application for

63 completeness and issue a

written notification to the applicant

64

letter

indicating that all required information is submitted or

65

specify in writing

specifying

with particularity any areas that

66 are deficient. If the application is deficient, the applicant

67 has 30 days to address the deficiencies by submitting the

68 required additional information.

For applications that do not

69

require final action through a quasi-judicial hearing or a

70

public hearing, the county must approve, approve with

71

conditions, or deny the application for a development permit or

72

development order

within 120 days after the county has deemed

73 the application complete

.

, or 180 days

For applications that

74 require final action through a quasi-judicial hearing or a

75 public hearing, the county must approve, approve with

76 conditions, or deny the application for a development permit or

77 development order

within 180 days after the county has deemed

78

the application complete

. Both parties may agree

in writing or

79

in a public meeting or hearing

to

a reasonable request for

an

80 extension of time, particularly in the event of a force majeure

81 or other extraordinary circumstance. An approval, approval with

82 conditions, or denial of the application for a development

83 permit or development order must include written findings

84 supporting the county’s decision. The timeframes contained in

85 this subsection do not apply in an area of critical state

86 concern, as designated in s. 380.0552.

The timeframes contained

87

in this subsection restart if an applicant makes a substantive

88

change to the application. As used in this subsection, the term

89

“substantive change” means an applicant-initiated change of 15

90

percent or more in the proposed density, intensity, or square

91

footage of a parcel.

92

(3)(a)

(2)(a)

When reviewing an application for a

93 development permit or development order that is certified by a

94 professional listed in s. 403.0877, a county may not request

95 additional information from the applicant more than three times,

96 unless the applicant waives the limitation in writing.

97 (b) If a county makes a request for additional information

98 and the applicant submits the required additional information

99 within 30 days after receiving the request, the county must

100 review the application for completeness and issue a letter

101 indicating that all required information has been submitted or

102 specify with particularity any areas that are deficient within

103 30 days after receiving the additional information.

104 (c) If a county makes a second request for additional

105 information and the applicant submits the required additional

106 information within 30 days after receiving the request, the

107 county must review the application for completeness and issue a

108 letter indicating that all required information has been

109 submitted or specify with particularity any areas that are

110 deficient within 10 days after receiving the additional

111 information.

112 (d) Before a third request for additional information, the

113 applicant must be offered a meeting to attempt to resolve

114 outstanding issues. If a county makes a third request for

115 additional information and the applicant submits the required

116 additional information within 30 days after receiving the

117 request, the county must deem the application complete within 10

118 days after receiving the additional information or proceed to

119 process the application for approval or denial unless the

120 applicant waived the county’s limitation in writing as described

121 in paragraph (a).

122 (e) Except as provided in subsection

(7)

(5)

, if the

123 applicant believes the request for additional information is not

124 authorized by ordinance, rule, statute, or other legal

125 authority, the county, at the applicant’s request, shall proceed

126 to process the application for approval or denial.

127

(4) A county must issue a refund to an applicant equal to:

128

(a) Ten percent of the application fee if the county fails

129

to issue written notification of completeness or written

130

specification of areas of deficiency within 30 days after

131

receiving the application.

132

(b) Ten percent of the application fee if the county fails

133

to issue a written notification of completeness or written

134

specification of areas of deficiency within 30 days after

135

receiving the additional information pursuant to paragraph

136

(3)(b).

137

(c) Twenty percent of the application fee if the county

138

fails to issue a written notification of completeness or written

139

specification of areas of deficiency within 10 days after

140

receiving the additional information pursuant to paragraph

141

(3)(c).

142

(d) Fifty percent of the application fee if the county

143

fails to approve, approves with conditions, or denies the

144

application within 30 days after conclusion of the 120-day or

145

180-day timeframe specified in subsection (2).

146

(e) One hundred percent of the application fee if the

147

county fails to approve, approves with conditions, or denies an

148

application 31 days or more after conclusion of the 120-day or

149

180-day timeframe specified in subsection (2).

150

151

A county is not required to issue a refund if the applicant and

152

the county agree to an extension of time, the delay is caused by

153

the applicant, or the delay is attributable to a force majeure

154

or other extraordinary circumstance.

155

(5)

(3)

When a county denies an application for a

156 development permit or development order, the county shall give

157 written notice to the applicant. The notice must include a

158 citation to the applicable portions of an ordinance, rule,

159 statute, or other legal authority for the denial of the permit

160 or order.

161

(6)

(4)

As used in this section, the terms “development

162 permit” and “development order” have the same meaning as in s.

163 163.3164, but do not include building permits.

164

(7)

(5)

For any development permit application filed with

165 the county after July 1, 2012, a county may not require as a

166 condition of processing or issuing a development permit or

167 development order that an applicant obtain a permit or approval

168 from any state or federal agency unless the agency has issued a

169 final agency action that denies the federal or state permit

170 before the county action on the local development permit.

171

(8)

(6)

Issuance of a development permit or development

172 order by a county does not in any way create any rights on the

173 part of the applicant to obtain a permit from a state or federal

174 agency and does not create any liability on the part of the

175 county for issuance of the permit if the applicant fails to

176 obtain requisite approvals or fulfill the obligations imposed by

177 a state or federal agency or undertakes actions that result in a

178 violation of state or federal law. A county shall attach such a

179 disclaimer to the issuance of a development permit and shall

180 include a permit condition that all other applicable state or

181 federal permits be obtained before commencement of the

182 development.

183

(9)

(7)

This section does not prohibit a county from

184 providing information to an applicant regarding what other state

185 or federal permits may apply.

186 Section 2. Present paragraph (j) of subsection (6) of

187 section 163.3180, Florida Statutes, is redesignated as paragraph

188 (k), and a new paragraph (j) is added to that subsection, to

189 read:

190 163.3180 Concurrency.—

191 (6)

192

(j) A school district may not collect, charge, or impose

193

any alternative fee in lieu of an impact fee to mitigate the

194

impact of development on educational facilities unless such fee

195

meets the requirements of s. 163.31801(4)(f) and (g). In any

196

action challenging a fee under this paragraph, the school

197

district has the burden of proving by a preponderance of the

198

evidence that the imposition and amount of the fee meet the

199

requirements of state legal precedent.

200 Section 3. Paragraph (a) of subsection (7) of section

201 553.80, Florida Statutes, is amended to read:

202 553.80 Enforcement.—

203 (7)(a) The governing bodies of local governments may

204 provide a schedule of reasonable fees, as authorized by s.

205 125.56(2) or s. 166.222 and this section, for enforcing this

206 part. These fees, and any fines or investment earnings related

207 to the fees, may only be used for carrying out the local

208 government’s responsibilities in enforcing the Florida Building

209 Code

, including, but not limited to, any process or enforcement

210

related to obtaining or finalizing a building permit

. When

211 providing a schedule of reasonable fees, the total estimated

212 annual revenue derived from fees, and the fines and investment

213 earnings related to the fees, may not exceed the total estimated

214 annual costs of allowable activities. Any unexpended balances

215 must be carried forward to future years for allowable activities

216 or must be refunded at the discretion of the local government. A

217 local government may not carry forward an amount exceeding the

218 average of its operating budget for enforcing the Florida

219 Building Code for the previous 4 fiscal years. For purposes of

220 this subsection, the term “operating budget” does not include

221 reserve amounts. Any amount exceeding this limit must be used as

222 authorized in subparagraph 2. However, a local government that

223 established, as of January 1, 2019, a Building Inspections Fund

224 Advisory Board consisting of five members from the construction

225 stakeholder community and carries an unexpended balance in

226 excess of the average of its operating budget for the previous 4

227 fiscal years may continue to carry such excess funds forward

228 upon the recommendation of the advisory board. The basis for a

229 fee structure for allowable activities must relate to the level

230 of service provided by the local government and must include

231 consideration for refunding fees due to reduced services based

232 on services provided as prescribed by s. 553.791, but not

233 provided by the local government. Fees charged must be

234 consistently applied.

235 1. As used in this subsection, the phrase “enforcing the

236 Florida Building Code” includes the direct costs and reasonable

237 indirect costs associated with review of building plans,

238 building inspections, reinspections, and building permit

239 processing; building code enforcement; and fire inspections

240 associated with new construction. The phrase may also include

241 training costs associated with the enforcement of the Florida

242 Building Code and enforcement action pertaining to unlicensed

243 contractor activity to the extent not funded by other user fees.

244 2. A local government must use any excess funds that it is

245 prohibited from carrying forward to rebate and reduce fees, to

246 upgrade technology hardware and software systems to enhance

247 service delivery, to pay for the construction of a building or

248 structure that houses a local government’s building code

249 enforcement agency, or for training programs for building

250 officials, inspectors, or plans examiners associated with the

251 enforcement of the Florida Building Code. Excess funds used to

252 construct such a building or structure must be designated for

253 such purpose by the local government and may not be carried

254 forward for more than 4 consecutive years. An owner or builder

255 who has a valid building permit issued by a local government for

256 a fee, or an association of owners or builders located in the

257 state that has members with valid building permits issued by a

258 local government for a fee, may bring a civil action against the

259 local government that issued the permit for a fee to enforce

260 this subparagraph.

261 3. The following activities may not be funded with fees

262 adopted for enforcing the Florida Building Code:

263 a. Planning and zoning or other general government

264 activities

not related to obtaining a building permit

.

265 b. Inspections of public buildings for a reduced fee or no

266 fee.

267 c. Public information requests, community functions,

268 boards, and any program not directly related to enforcement of

269 the Florida Building Code.

270 d. Enforcement and implementation of any other local

271 ordinance, excluding validly adopted local amendments to the

272 Florida Building Code and excluding any local ordinance directly

273 related to enforcing the Florida Building Code as defined in

274 subparagraph 1.

275 4. A local government must use recognized management,

276 accounting, and oversight practices to ensure that fees, fines,

277 and investment earnings generated under this subsection are

278 maintained and allocated or used solely for the purposes

279 described in subparagraph 1.

280 5. The local enforcement agency, independent district, or

281 special district may not require at any time, including at the

282 time of application for a permit, the payment of any additional

283 fees, charges, or expenses associated with:

284 a. Providing proof of licensure under chapter 489;

285 b. Recording or filing a license issued under this chapter;

286 c. Providing, recording, or filing evidence of workers’

287 compensation insurance coverage as required by chapter 440; or

288 d. Charging surcharges or other similar fees not directly

289 related to enforcing the Florida Building Code.

290 Section 4. Effective January 1, 2026, paragraphs (g) and

291 (h) of subsection (6) of section 163.31801, Florida Statutes,

292 are amended to read:

293 163.31801 Impact fees; short title; intent; minimum

294 requirements; audits; challenges.—

295 (6) A local government, school district, or special

296 district may increase an impact fee only as provided in this

297 subsection.

298 (g)

1.

A local government, school district, or special

299 district may increase an impact fee rate beyond the phase-in

300 limitations established under paragraph (b), paragraph (c),

301 paragraph (d), or paragraph (e) by establishing the need for

302 such increase in full compliance with the requirements of

303 subsection (4), provided the following criteria are met:

304

a.

1.

A demonstrated-need study justifying any increase in

305 excess of those authorized in paragraph (b), paragraph (c),

306 paragraph (d), or paragraph (e) has been completed within the 12

307 months before the adoption of the impact fee increase and

308 expressly demonstrates the extraordinary circumstances

309 necessitating the need to exceed the phase-in limitations.

310

b.

2.

The local government jurisdiction has held

at least

311

not less than

two publicly noticed workshops dedicated to the

312 extraordinary circumstances necessitating the need to exceed the

313 phase-in limitations set forth in paragraph (b), paragraph (c),

314 paragraph (d), or paragraph (e).

315

c.

3.

The impact fee increase ordinance is approved by

at

316

least

a

unanimous

two-thirds

vote of the governing body.

317

2. An impact fee increase approved under this paragraph

318

must be implemented in at least two but not more than four equal

319

annual increments beginning with the date on which the impact

320

fee increase ordinance is adopted.

321

3. A local government may not increase an impact fee rate

322

beyond the phase-in limitations under this paragraph if the

323

local government has not increased the impact fee within the

324

past 5 years. Any year in which the local government is

325

prohibited from increasing an impact fee because the

326

jurisdiction is in a hurricane disaster area is not included in

327

the 5-year period.

328

(h) This subsection operates retroactively to January 1,

329

2021.

330 Section 5. Paragraphs (b) and (c) of subsection (3) of

331 section 163.3184, Florida Statutes, are amended to read:

332 163.3184 Process for adoption of comprehensive plan or plan

333 amendment.—

334 (3) EXPEDITED STATE REVIEW PROCESS FOR ADOPTION OF

335 COMPREHENSIVE PLAN AMENDMENTS.—

336 (b)1.

If a plan amendment or amendments are adopted,

the

337 local government, after the initial public hearing held pursuant

338 to subsection (11), shall transmit

,

within 10 working days

after

339

the date of adoption,

the amendment or amendments and

340 appropriate supporting data and analyses to the reviewing

341 agencies. The local governing body shall also transmit a copy of

342 the amendments and supporting data and analyses to any other

343 local government or governmental agency that has filed a written

344 request with the governing body.

345 2. The reviewing agencies and any other local government or

346 governmental agency specified in subparagraph 1. may provide

347 comments regarding the amendment or amendments to the local

348 government. State agencies shall only comment on important state

349 resources and facilities that will be adversely impacted by the

350 amendment if adopted. Comments provided by state agencies shall

351 state with specificity how the plan amendment will adversely

352 impact an important state resource or facility and shall

353 identify measures the local government may take to eliminate,

354 reduce, or mitigate the adverse impacts. Such comments, if not

355 resolved, may result in a challenge by the state land planning

356 agency to the plan amendment. Agencies and local governments

357 must transmit their comments to the affected local government

358 such that they are received by the local government not later

359 than 30 days after the date on which the agency or government

360 received the amendment or amendments. Reviewing agencies shall

361 also send a copy of their comments to the state land planning

362 agency.

363 3. Comments to the local government from a regional

364 planning council, county, or municipality shall be limited as

365 follows:

366 a. The regional planning council review and comments shall

367 be limited to adverse effects on regional resources or

368 facilities identified in the strategic regional policy plan and

369 extrajurisdictional impacts that would be inconsistent with the

370 comprehensive plan of any affected local government within the

371 region. A regional planning council may not review and comment

372 on a proposed comprehensive plan amendment prepared by such

373 council unless the plan amendment has been changed by the local

374 government subsequent to the preparation of the plan amendment

375 by the regional planning council.

376 b. County comments shall be in the context of the

377 relationship and effect of the proposed plan amendments on the

378 county plan.

379 c. Municipal comments shall be in the context of the

380 relationship and effect of the proposed plan amendments on the

381 municipal plan.

382 d. Military installation comments shall be provided in

383 accordance with s. 163.3175.

384 4. Comments to the local government from state agencies

385 shall be limited to the following subjects as they relate to

386 important state resources and facilities that will be adversely

387 impacted by the amendment if adopted:

388 a. The Department of Environmental Protection shall limit

389 its comments to the subjects of air and water pollution;

390 wetlands and other surface waters of the state; federal and

391 state-owned lands and interest in lands, including state parks,

392 greenways and trails, and conservation easements; solid waste;

393 water and wastewater treatment; and the Everglades ecosystem

394 restoration.

395 b. The Department of State shall limit its comments to the

396 subjects of historic and archaeological resources.

397 c. The Department of Transportation shall limit its

398 comments to issues within the agency’s jurisdiction as it

399 relates to transportation resources and facilities of state

400 importance.

401 d. The Fish and Wildlife Conservation Commission shall

402 limit its comments to subjects relating to fish and wildlife

403 habitat and listed species and their habitat.

404 e. The Department of Agriculture and Consumer Services

405 shall limit its comments to the subjects of agriculture,

406 forestry, and aquaculture issues.

407 f. The Department of Education shall limit its comments to

408 the subject of public school facilities.

409 g. The appropriate water management district shall limit

410 its comments to flood protection and floodplain management,

411 wetlands and other surface waters, and regional water supply.

412 h. The state land planning agency shall limit its comments

413 to important state resources and facilities outside the

414 jurisdiction of other commenting state agencies and may include

415 comments on countervailing planning policies and objectives

416 served by the plan amendment that should be balanced against

417 potential adverse impacts to important state resources and

418 facilities.

419 (c)1. The local government shall hold a second public

420 hearing, which shall be a hearing on whether to adopt one or

421 more comprehensive plan amendments pursuant to subsection (11).

422 If the local government fails, within 180 days after receipt of

423 agency comments, to hold the second public hearing,

and to adopt

424

the comprehensive plan amendments,

the amendments are deemed

425 withdrawn unless extended by agreement with notice to the state

426 land planning agency and any affected person that provided

427 comments on the amendment.

If the amendments are not adopted at

428

the second public hearing, the amendments shall be formally

429

adopted by the local government within 180 days after the second

430

public hearing is held or the amendments are deemed withdrawn

431

The 180-day limitation does not apply to amendments processed

432

pursuant to s. 380.06

.

433 2. All comprehensive plan amendments adopted by the

434 governing body, along with the supporting data and analysis,

435 shall be transmitted within

30

10

working days after the final

436 adoption hearing to the state land planning agency and any other

437 agency or local government that provided timely comments under

438 subparagraph (b)2. If the local government fails to transmit the

439 comprehensive plan amendments within

30

10

working days after

440 the final adoption hearing, the amendments are deemed withdrawn.

441 3. The state land planning agency shall notify the local

442 government of any deficiencies within 5 working days after

443 receipt of an amendment package. For purposes of completeness,

444 an amendment shall be deemed complete if it contains a full,

445 executed copy of:

446 a. The adoption ordinance or ordinances;

447 b. In the case of a text amendment, the amended language in

448 legislative format with new words inserted in the text

449 underlined, and words deleted stricken with hyphens;

450 c. In the case of a future land use map amendment, the

451 future land use map clearly depicting the parcel, its existing

452 future land use designation, and its adopted designation; and

453 d. Any data and analyses the local government deems

454 appropriate.

455 4. An amendment adopted under this paragraph does not

456 become effective until 31 days after the state land planning

457 agency notifies the local government that the plan amendment

458 package is complete. If timely challenged, an amendment does not

459 become effective until the state land planning agency or the

460 Administration Commission enters a final order determining the

461 adopted amendment to be in compliance.

462 Section 6. Section 166.033, Florida Statutes, is amended to

463 read:

464 166.033 Development permits and orders.—

465 (1)

A municipality shall specify in writing the minimum

466

information that must be submitted for an application for a

467

zoning approval, rezoning approval, subdivision approval,

468

certification, special exception, or variance. A municipality

469

shall make the minimum information available for inspection and

470

copying at the location where the municipality receives

471

applications for development permits and orders, provide the

472

information to the applicant at a preapplication meeting, or

473

post the information on the municipality’s website.

474

(2) Within 5 business days after receiving an application

475

for approval of a development permit or development order, a

476

municipality shall confirm receipt of the application using

477

contact information provided by the applicant.

Within 30 days

478 after receiving an application for approval of a development

479 permit or development order, a municipality must review the

480 application for completeness and issue a

written notification to

481

the applicant

letter

indicating that all required information is

482 submitted or

specify in writing

specifying

with particularity

483 any areas that are deficient. If the application is deficient,

484 the applicant has 30 days to address the deficiencies by

485 submitting the required additional information.

For applications

486

that do not require final action through a quasi-judicial

487

hearing or a public hearing, the municipality must approve,

488

approve with conditions, or deny the application for a

489

development permit or development order

within 120 days after

490 the municipality has deemed the application complete

.

, or 180

491

days

For applications that require final action through a quasi

492 judicial hearing or a public hearing, the municipality must

493 approve, approve with conditions, or deny the application for a

494 development permit or development order

within 180 days after

495

the municipality has deemed the application complete

. Both

496 parties may agree

in writing or in a public meeting or hearing

497 to

a reasonable request for

an extension of time, particularly

498 in the event of a force majeure or other extraordinary

499 circumstance. An approval, approval with conditions, or denial

500 of the application for a development permit or development order

501 must include written findings supporting the municipality’s

502 decision. The timeframes contained in this subsection do not

503 apply in an area of critical state concern, as designated in s.

504 380.0552 or chapter 28-36, Florida Administrative Code.

The

505

timeframes contained in this subsection restart if an applicant

506

makes a substantive change to the application. As used in this

507

subsection, the term “substantive change” means an applicant

508

initiated change of 15 percent or more in the proposed density,

509

intensity, or square footage of a parcel.

510

(3)(a)

(2)(a)

When reviewing an application for a

511 development permit or development order that is certified by a

512 professional listed in s. 403.0877, a municipality may not

513 request additional information from the applicant more than

514 three times, unless the applicant waives the limitation in

515 writing.

516 (b) If a municipality makes a request for additional

517 information and the applicant submits the required additional

518 information within 30 days after receiving the request, the

519 municipality must review the application for completeness and

520 issue a letter indicating that all required information has been

521 submitted or specify with particularity any areas that are

522 deficient within 30 days after receiving the additional

523 information.

524 (c) If a municipality makes a second request for additional

525 information and the applicant submits the required additional

526 information within 30 days after receiving the request, the

527 municipality must review the application for completeness and

528 issue a letter indicating that all required information has been

529 submitted or specify with particularity any areas that are

530 deficient within 10 days after receiving the additional

531 information.

532 (d) Before a third request for additional information, the

533 applicant must be offered a meeting to attempt to resolve

534 outstanding issues. If a municipality makes a third request for

535 additional information and the applicant submits the required

536 additional information within 30 days after receiving the

537 request, the municipality must deem the application complete

538 within 10 days after receiving the additional information or

539 proceed to process the application for approval or denial unless

540 the applicant waived the municipality’s limitation in writing as

541 described in paragraph (a).

542 (e) Except as provided in subsection

(7)

(5)

, if the

543 applicant believes the request for additional information is not

544 authorized by ordinance, rule, statute, or other legal

545 authority, the municipality, at the applicant’s request, shall

546 proceed to process the application for approval or denial.

547

(4) A municipality must issue a refund to an applicant

548

equal to:

549

(a) Ten percent of the application fee if the municipality

550

fails to issue written notification of completeness or written

551

specification of areas of deficiency within 30 days after

552

receiving the application.

553

(b) Ten percent of the application fee if the municipality

554

fails to issue written notification of completeness or written

555

specification of areas of deficiency within 30 days after

556

receiving the additional information pursuant to paragraph

557

(3)(b).

558

(c) Twenty percent of the application fee if the

559

municipality fails to issue written notification of completeness

560

or written specification of areas of deficiency within 10 days

561

after receiving the additional information pursuant to paragraph

562

(3)(c).

563

(d) Fifty percent of the application fee if the

564

municipality fails to approve, approves with conditions, or

565

denies the application within 30 days after conclusion of the

566

120-day or 180-day timeframe specified in subsection (2).

567

(e) One hundred percent of the application fee if the

568

municipality fails to approve, approves with conditions, or

569

denies an application 31 days or more after conclusion of the

570

120-day or 180-day timeframe specified in subsection (2).

571

572

A municipality is not required to issue a refund if the

573

applicant and the municipality agree to an extension of time,

574

the delay is caused by the applicant, or the delay is

575

attributable to a force majeure or other extraordinary

576

circumstance.

577

(5)

(3)

When a municipality denies an application for a

578 development permit or development order, the municipality shall

579 give written notice to the applicant. The notice must include a

580 citation to the applicable portions of an ordinance, rule,

581 statute, or other legal authority for the denial of the permit

582 or order.

583

(6)

(4)

As used in this section, the terms “development

584 permit” and “development order” have the same meaning as in s.

585 163.3164, but do not include building permits.

586

(7)

(5)

For any development permit application filed with

587 the municipality after July 1, 2012, a municipality may not

588 require as a condition of processing or issuing a development

589 permit or development order that an applicant obtain a permit or

590 approval from any state or federal agency unless the agency has

591 issued a final agency action that denies the federal or state

592 permit before the municipal action on the local development

593 permit.

594

(8)

(6)

Issuance of a development permit or development

595 order by a municipality does not create any right on the part of

596 an applicant to obtain a permit from a state or federal agency

597 and does not create any liability on the part of the

598 municipality for issuance of the permit if the applicant fails

599 to obtain requisite approvals or fulfill the obligations imposed

600 by a state or federal agency or undertakes actions that result

601 in a violation of state or federal law. A municipality shall

602 attach such a disclaimer to the issuance of development permits

603 and shall include a permit condition that all other applicable

604 state or federal permits be obtained before commencement of the

605 development.

606

(9)

(7)

This section does not prohibit a municipality from

607 providing information to an applicant regarding what other state

608 or federal permits may apply.

609 Section 7. Except as otherwise expressly provided in this

610 act, this act shall take effect October 1, 2025.

Volver al texto completo