1 A bill to be entitled
15 unchanged paragraphs
2 An act relating to solar facilities; amending s.
3 163.3205, F.S.; revising legislative intent; defining
4 the terms “agricultural land” and “decommissioned”;
5 authorizing a county to adopt an ordinance requiring
6 that certain solar facilities be properly
7 decommissioned under certain circumstances;
8 authorizing a county to presume that a solar facility
9 has reached the end of its useful life under certain
10 circumstances; authorizing a solar facility owner to
11 rebut the presumption in a certain manner; authorizing
12 a county to require certain financial assurance and
13 certain updates from a solar facility owner;
14 authorizing a county to take action to complete the
15 decommissioning of a solar facility under certain
16 circumstances; deleting a provision providing that a
17 solar facility is a permitted use in certain land use
18 categories and zoning districts and is subject to compliance
19 compliance with certain requirements; deleting a provision authorizing
20 provision authorizing a county to adopt an ordinance specifying certain
21 specifying certain requirements for solar facilities; revising
22 revising applicability; amending s. 163.3208, F.S.; deleting a
23 deleting a provision exempting solar facility substations from
24 substations from the electric substations for which local governments
25 local governments may adopt and enforce certain land development
26 development regulations; providing an effective date.
27
93 unchanged paragraphs
28 Be It Enacted by the Legislature of the State of Florida:
29
30 Section 1. Section 163.3205, Florida Statutes, is amended
31 to read:
32 163.3205 Solar facility approval process
and
33
decommissioning requirements
.—
34 (1) It is the intent of the Legislature
t
hat agricultural
35
land used for a solar facility be returned to its original state
36
and be viable for agricultural use at the end of the life of the
37
solar facility
to encourage renewable solar electrical
38
generation throughout this state. It is essential that solar
39
facilities and associated electric infrastructure be constructed
40
and maintained in various locations throughout this state in
41
order to ensure the availability of renewable energy production,
42
which is critical to this state’s energy and economic future
.
43 (2) As used in this section, the term
:
44
(a)
“Agricultural land” means land within:
45
1.
A
n a
rea categorized as agricultural land in a local
46
government comprehensive plan
. Such categorization includes
any
47
agricultural land use category; or
48
2.
An agricultural zoning district within an unincorporated
49
area.
50
(b) “Decommissioned” means the removal of a solar facility
51
and return of agricultural
land
that
was
used for
such
solar
52
facility
to an agriculturally useful condition similar to that
53
which existed before construction of the solar facility,
54
including the removal of above-surface facilities and
55
infrastructure that do not serve a continuing purpose.
56
(c)
“Solar facility” means a production facility for
57 electric power which:
58
1.
(a)
Uses photovoltaic modules to convert solar energy to
59 electricity that may be stored on site, delivered to a
60 transmission system, and consumed primarily offsite.
61
2.
(b)
Consists principally of photovoltaic modules, a
62 mounting or racking system, power inverters, transformers,
63 collection systems, battery systems, fire suppression equipment,
64 and associated components.
65
3.
(c)
May include accessory administration or maintenance
66 buildings, electric transmission lines, substations, energy
67 storage equipment, and related accessory uses and structures.
68 (3)
For a solar facility over 2 megawatts which is
in gross capacity
69
as defined in s. 403.503
which is constructed on agricultural land, a county may adopt an
70
land, a county may adopt an ordinance requiring that the
solar
facility be properly
71
facility be properly decommissioned upon the facility reaching the end of its useful
72
life.
the end of its useful life.
73
136 unchanged paragraphs
(a) A county may presume that a solar facility has reached
74
the end of its useful life if:
75
1. The solar facility fails to produce power for a period
76
of 12 months after construction of the solar facility has been
77
completed. This 12-month period does not include a period in
78
which the solar facility does not produce power due to a
79
disaster or other event beyond the control of the facility
80
owner; or
81
2. The solar facility has been abandoned. A solar facility
82
is considered abandoned if:
83
a. After commencement of the solar facility’s construction
84
but before completion, no significant construction of the
85
facility occurs for a period of 24 months; or
86
b. After becoming nonoperational due to a disaster or other
87
event beyond the control of the facility owner, no significant
88
reconstruction of the solar facility occurs for a period of 12
89
months.
90
(b) The presumptions provided under paragraph (a) may be
91
rebutted by the solar facility owner providing the county with a
92
plan, schedule, and adequate assurances for the continuing
93
construction or operation of the solar facility.
94
(c) Counties may require financial assurance from a solar
95
facility owner in the form of a bond, an irrevocable letter of
96
credit established pursuant to chapter 675, a guarantee by the
97
solar facility owner’s parent company, or another financial
98
device deemed adequate by the county to cover the estimated cost
99
of decommissioning the solar facility. The solar facility owner
100
must provide the information necessary for the county to
101
establish the estimated cost of such decommissioning.
102
(d) Counties may require a solar facility owner to provide
103
updates no less than every 5 years on the estimated cost of
104
decommissioning and financial assurance provided under paragraph
105
(c). Any financial assurance provided under paragraph (c) may be
106
adjusted in accordance with the updates to such estimated cost.
107
(e) If a facility owner does not complete decommissioning
108
as required by county ordinance, the county may take action to
109
complete the decommissioning, including action to require
110
forfeiture of the financial assurance provided under paragraph
111
(c). A county
shall
allow a solar facility owner at least 12
112
months to commence decommissioning and 24 months to complete
113
decommissioning before taking such action
A solar facility shall
114
be a permitted use in all agricultural land use categories in a
115
local government comprehensive plan and all agricultural zoning
116
districts within an unincorporated area and must comply with the
117
setback and landscaped buffer area criteria for other similar
118
uses in the agricultural district
.
119
(4) A county may adopt an ordinance specifying buffer and
120
landscaping requirements for solar facilities. Such requirements
121
may not exceed the requirements for similar uses involving the
122
construction of other facilities that are permitted uses in
123
agricultural land use categories and zoning districts.
124
(4)
(5)
This section does not apply to any site that was the
125 subject of an application to construct a solar facility
126 submitted to a local governmental entity before July 1,
2025
127
2021
.
128 Section 2. Subsection (3) of section 163.3208, Florida
129 Statutes, is amended to read:
130 163.3208 Substation approval process.—
131 (3) Electric substations are a critical component of
132 electric transmission and distribution.
Except for substations
133
in
s. 163.3205(2)(c)
,
Local governments may adopt and enforce
134 reasonable land development regulations for new and existing
135 electric substations, addressing only setback, landscaping,
136 buffering, screening, lighting, and other aesthetic
137 compatibility-based standards. Vegetated buffers or screening
138 beneath aerial access points to the substation equipment
may
139
shall
not be required to have a mature height in excess of 14
140 feet.
141 Section 3. This act shall take effect July 1, 2025.