What changed between versions

31 paragraphs changed+423 words added−1192 removed

Highlighted text was added in the newer version. Struck-through text was removed.

OFFERED FOR CONSIDERATION

2/09/2026

2026 SESSION

INTRODUCED

26102637D

SENATE BILL NO. 371

AMENDMENT IN THE NATURE OF A SUBSTITUTE

Offered January 14, 2026

Prefiled January 13, 2026

A BILL to amend the Code of Virginia by adding in Chapter 23 of Title 56 a section numbered 56-596.7, relating to electric utilities; high energy demand customers; State Corporation Commission to establish electric demand flexibility programs.

—————

Patrons—McPike and Srinivasan

—————

(ProposedReferred by the Senateto Committee on Commerce and Labor

on ________________)

(Patron Prior to Substitute—Senator McPike)

A BILL to amend the Code of Virginia by adding in Chapter 23 of Title 56 a section numbered 56-596.7, relating to electric utilities; high energy demand customers; State Corporation Commission to establish electric demand flexibility programs; reports.

—————

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding in Chapter 23 of Title 56 a section numbered 56-596.7 as follows:

§ 56-596.7. Electric demand flexibility programs; high energy demand customers ; reporting requirements .

A. As used in this section:

" Cooperative " means a utility consumer services cooperative organized under Article 1 (§ 56.231.15 et seq.) of Chapter 9.1.

"Demand flexibility" means loweringmeasures designed to lower total electric grid system load requirements or shifting such requirements from time periods of peak system demand to time periods of lower system demand , including through programs by whichrequiring highor energyincentivizing demandretail electric service customers to temporarily reduce or interrupt their electricity us ageusage or through programs by whichpermitting highcertain energyretail demandelectric service customers to secure measurable and verifiable electric load reductions from other retail electric service customers during time periods of peak system demand or other events that cause strain on the electric grid in the Commonwealth.

"High energy demand customer" means a retail electric service customer with a contracted or measured electric load of 25 megawatts or greater and with an actual or expected load factor of 75 percent or greater.

"Phase I Utility" and "Phase II Utility" have the same meanings as defined in subdivision A 1 of § 56-585.1.

B. 1. By January 1, 202 7 , each Phase I and Phase II Utility shall file a petition with the Commission for a voluntary demand flexibility program that applies to high energy demand customers in the respective service territory of each such utility and that is designed to maximize electric grid system savings and improve reliability for retail electric service customers in the respective service territory of each such utility . The Commissio n shall issue a final order on such petitions no later than December 31, 2027. For each demand flexibility program established under this su bsection, the Commission shall determine an appropriate demand flexibility standard, which each utility shall, working with its high energy demand customers, make best, reasonable efforts to meet or exceed annually. The Commission may establish separate standards for high energy demand customers beginning service before and after July 1, 2026. In reviewing such petitions, the Commission shall consider relevant provisions of other proceedings related to demand flexibility and may make any necessary modifications to such other proceedings to effectuate the provisions of this section.

B. 1. By January 1, 2028, the Commission shall, after notice and hearing, establish by regulation a demand flexibility program for Phase I and Phase II Utilities that applies to high energy demand customers in the respective service territory of each such utility and is designed to maximize electric grid system savings for retail electric service customers in the respective service territory of each such utility.

2. By January 1, 2029, the Commission shall, after notice and hearing, establish by regulation a demand flexibility program for cooperatives that applies to high energy demand customers in the respective service territory of each such cooperative and is designed to maximize electric grid system savings for retail electric service customers in the respective service territory of each such cooperative.

3. The Commission shall, after notice and hearing, reassess each demand flexibility program established under this section every three years after such program becomes effective.

2C. For each program established under subsection B, the Commission shall determine appropriate demand flexibility standards for each Phase I Utility, Phase II Utility, and electric cooperative with one or more high energy demand customers to meet or exceed annually. In approvingestablishing each such program to be established by a Phase I Utility or Phase II Utility, the Commission shall consider all forms of demand flexibility, including geographical or spatial shifting, dynamic voltage and frequency scaling, the use of energy storage resources, and methods by which customers with large electric demand may be eligible to participate without directly curtailing electricity use, such as by funding, supporting, or purchasing capacity reduction credits from other retail electric service customers. Such capac ity reduction credits may be achieved through collaboration with jurisdictional customers, nonjurisdictional customers, incumbent utilities, or third-party providers to deploy weatherization efforts, grid enhancing technologies , energy efficiency upgrades, electric resistance heat to electric heat pump conversion, demand response programs, customer-sited energy storage resources, virtual power plants, or other efforts the Commissio n deems appropriate to achieve the goals of reducing total peak system demand, provided that such efforts produce measurable and verifiable results. In designing each such program, the Commission shall also (i) identify time periods of peak system demand; (ii) seek to minimize air pollution, emissions, and environmental and public health impacts; (iii) prohibit a high energy demand customer from meeting demand flexibility standards using carbon-emitting generating resources; and (iv) tomitigate the extentrisk necessary,of using inflated or inaccurate measures of electric demand to create an appearance of demand flexibility or electric load reduction that is ineffective in providing true demand flexibility. The Commission may establish anyseparate standards for measuringnew andversus verifyingexisting savingshigh achievedenergy underdemand this section customers.

C. 1. By January 1, 2029, each cooperative that serves one or more high energy demand customers shall establish a voluntary demand flexibility program that applies to high energy demand customers in the respective service territory of each such cooperative and that is designed to maximize electric grid system savings and improve reliability for retail electric service customers in the respective service territory of each such coope rative . For each demand flexibility program established under this subsection, the cooperative shall, subject to Commission approval consistent with this subsection, propose an app ropriate demand flexibility standard that each cooperative with an approved program shall make best, reasonable efforts to meet. Such proposal may include separate standards for high energy demand customers beginning service before and after July 1, 2026.

2. To assist in developing such programs, each cooperative that serves one or more high energy demand customers shall convene a technical work group , or one or more consolidated technical work groups, and shall invite organizations and experts to represent the interests of high energy demand customers, other cooperative customers , and the environment. The work group shall (i) gather information and develop program proposals ; (ii) consider all forms of demand flexibility, including geographic or spatial shifting, dynamic voltage and frequency scaling, the use of energy storage resources, and methods by which custome rs with high electric demand may be eligible to participate without directly curtailing their electricity use, such as by funding, supporting, or purchasing capacity reduction credits from other retail electric service customers ; and (iii) consider whether any existing programs, rates, or tariffs offered by such cooperative, or offered b y any generation and transmission cooperative to which such cooperative belongs, satisfy the provisions of this section. The work group shall evaluate ways s ystem savings may be derived from such programs , including through weatherization efforts, grid enhancing technologies, energy efficiency upgrades, electric resistance heat to electric heat pump conversion, demand response programs, customer-sited energy storage resources, virtual power plants, or other efforts the work group deems appropriate to achieve the goals of reducing total peak system demand, provided that such efforts produce measurable and verifiable results. Any proposals recommended by the work group shall (a) identify time periods of peak system demand; ( b ) seek to minimize emissions and environmental and public health impa cts; (c) prohibit a high energy demand customer from meeting demand flexibility standards using carbon-emitting generation resources; and ( d ) to the extent necessary, establish any standards for measuring and verifying system savi ngs achieved under this section. The work group shall submit a report of its findings and recommendations to the Commission no later than September 30, 2027, after which the Commission shall solicit public comment on the report. If, after full consideration of the record, including public comment, the Commission finds that the report and recommendations satisfy the provisions of this section, the Commission shall issue an order to such effect without conducting any additional proceedings. If the Commissio n finds that the report and recommendations do not satisfy the provisions of this section, the Commission may order supplemental proceedings as it deems appropriate. Notwithstanding any other provision of law, upon receiving a finding of sufficiency from the Commission, a cooperative that serves one or more high energy demand customers shall propose, establish, and implement on e or more demand flexibility programs. Such proposal and the establishment and implementation of such programs shall be without additional Commission approval upon an affirmative resolution o f the board of directors of the cooperative and without requiring any other filing than as required under this subsection.

D. If a demand flexibility program established by the Commission under this section includes incentives for participation by high energy demand customers, the Commission or cooperative shall design such incentives to enc ourageencourage participation by high energy demand customers without unreasonably shifting or imposing any costs of program participation or administration onto other retail electric service customers of the utility. Such incentives may also include open and transparent procedures for accelerated interconnection to service by participating high energy demand customers, to the extent not already established by the Commission in a separate proceeding. Any such incentives shall be contingent upon the measurement and verification of a participating high energy demand customer's reductions in peak demand or electric load reductions secured from other retail electric service customers.

E. Three years after the initial program approval and e very three years thereafter , e ach Phase I and Phase II Utility with a demand flexibility program established under this section shall file a status report on such program with the Commission. Such report shall detail the program's performance and include any proposed changes or other recommendations to improve the program's implementation consistent with the provisions of this section. The Commission shall have the discretion to determine what , if any, other proceedings are necessitated by the status report.

F. By September 1, 2028 , and annually thereafter, as part of the report required under subsection B of § 56-5 9 6, the Commission shall submit information summarizing the status and performance of any programs established under this section.

2. That the State Corporation Commission (the Commission) shall initiate proceedings to establish demand flexibility programs pursuant to § 56-596.7 of the Code of Virginia, as created by this act. For Phase I and Phase II Utilities, as such terms are defined in subdivision A 1 of § 56-585.1 of the Code of Virginia, the Commission shall initiate proceedings no later than September 30, 2026, with such programs becoming effective by January 1, 2028. For cooperatives, as defined in § 56-576 of the Code of Virginia, the Commission shall initiate proceedings no later than September 30, 2027, with such programs becoming effective by January 1, 2029.