SB 267Session 2026

What changed between versions

18 paragraphs changed+44 words added−142 removed

Highlighted text was added in the newer version. Struck-through text was removed.

OFFERED FOR CONSIDERATION

2/12/2026

2026 SESSION

INTRODUCED

26102873D

SENATE BILL NO. 267

AMENDMENT IN THE NATURE OF A SUBSTITUTE

Offered January 14, 2026

Prefiled January 12, 2026

A BILL to direct the Department of Energy and the State Corporation Commission to conduct a comprehensive analysis of existing electric utility infrastructure.

—————

Patron—VanValkenburg

—————

(ProposedReferred by the Senateto Committee on Commerce and Labor

on ________________)

(Patron Prior to Substitute—Senator VanValkenburg)

A BILL to direct the Department of Energy and the State Corporation Commission to conduct a comprehensive analysis of existing electric utility infrastructure; report.

—————

Be it enacted by the General Assembly of Virginia:

1. § 1. The Department of Energy (the Department), in consultation with the State Corporation Commission ( the Commission) and each Phase I and Phase II Utility, as those terms are defined in subdivision A 1 of § 56-5 85.1 , shall conduct a comprehensive analysis of existing electric utility infrastructure to identify cost-saving opportunities that improve or preserve electric system reliability as an alternative or supplement to greenfield infrastructure projects. Such analysis shall include capacitypotential electric generation unit up ra t es for zero-carbon electric gene rating resources and energy storage resources and transmission upgradesgrades , including grid enhancing technologies, and high-performance conductors. The Department and the Commission shall also analyze whether there are or could be any potential voluntary regulatory pathways by which large load customers could directly finance such alternatives as a condition of accelerated interconnection. The Department and the Commission shall complete their analys e s and submit a report to the General Assembly no later than December 1 , 202 6 . Notwithstanding any provision of subsection C of § 56-585.5 of the Code of Virginia, any additional generating capacity achieved through uprates at any existing falling water resources shall be considered a renewable energy standard eligible source for the purposes of § 56-585.5 of the Code of Virginia.