A BILL to amend the Code of Virginia by adding in Chapter 23 of Title 56 a section numbered 56-596.7, relating to electric utilities; grid utilization programs; annual report.
—————
Patrons—LeVere Bolling and Glass
—————
(ProposedReferred by the Houseto Committee on Labor and Commerce
on ________________)
(Patron Prior to Substitute—Delegate LeVere Bolling)
A BILL to direct certain electric utilities to petition the State Corporation Commission for approval of electric grid utilization metrics.
—————
Be it enacted by the General Assembly of Virginia:
1. § 1. No later than November 1, 2026, each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of § 56-585.1 of the Code of Virginia , shall petition the St ate Corporation Commission (the Commission) for approval of electric grid utilization metrics. Such petition shall include an assessment of current electric di stribution and transmission system performance as compared with optimal utilization of existing electric grid assets, including any information necessary for the Commission to evaluate the efficiency and performance of electric distribution and transmission system infrastructure owned and operated by each Phase I and Phase II Utility. Such petition shall include detailed and transparent information regarding how the required assess ments are calculated and shall include an assessment of current system performance for each proposed metric. Any electric grid utilization metrics approved by the Commission shall includ e (i) the ratio of distribution system peak load to total distribution electric grid capacity, (ii) the ratio of current electric load delivered to total potential deliverable electric load over the distribution system, and (iii) the percentage of kilowatt-hours of electricity lost during the distribution process or by the distribution system. Such metrics shall be applied at the feeder and substation level and shall include a requirement to submit seasonal assessments of electric grid utilization and implementation of the metrics. The Commission shall issue its final order regarding such petitions no later than July 1, 2027. Such final order shall include ( a ) a timeline for each Phase I and Phase II Util ity to increase electric grid utilization in accordance with the approved electric grid utilization metrics, ( b ) a description of how each Phase II Utility shall include such electric grid utilization metrics in future integrated resource plans submitted under Chapter 24 (§ 56-597 et seq.) of Title 56 of the Code of Virginia , and ( c) a description of the ways in which the Commission may utilize such electric grid utilization metrics in evaluating future utility requests for approval of cost recovery for capital investments.
§ 2. In issuing the final order pursuant to § 1 , the Commission shall analyze and report on the potential for each Phase I or Phase II Utility to increase electric grid utilization through the deployment of non-wires alternatives, including (i) energy storage resources ; (ii) customer - owned or customer- financed capacity resources ; (iii) utility - owned distributed generation resources ; and (iv) virtual power plants, including by using the pilot program investments and tariff under § 56-585.1:16 of the Code of Virginia. In conducting such analy sis, the Commission may request any information necessary from each Phase I or Phase II Utility to properly evaluate such utility's deployment of non-wires alternatives or other methods to improve electric grid utilization in the Commonwealth.
1. That the Code of Virginia is amended by adding in Chapter 23 of Title 56 a section numbered 56-596.7 as follows:
§ 56-596.7. Grid utilization programs; annual report .
A. As used in this section:
" Grid utilization " means measures that increase the utilization of existing electric generation, distribution, and transmission infrastructure through the use of technology, programs, and other methods in a manner that tends to reduce rates for service paid by retail electric utility customers .
"Phase I Utility" and "Phase II Utility" have the same meanings as defined in subdivision A 1 of § 56-585.1.
B. By December 1, 2026, and in any recurring filing deemed appropriate by the Commission, the Commission (i) shall establish by regulation an appropriate grid utilization standard for each Phase I and Phase II Utility to meet or exceed annually and incorporate into its grid utilization program and (ii) may establish by regulation or order performance-based incentives for each Phase I and Phase II Utility in meeting or exceeding such standards , provided that such incentives result in a net benefit to retail electric utility customers. The grid utilizat ion standards established by the Commission shall include a baseline year from which an identified percentage increase in grid utilization is measured. In establishing such standards, the Commission shall evaluate the ability of non-wires alternatives to help meet such standards through measures including (a) energy storage that increases electric load capacity and provides electric grid services; ( b ) electric load capacity mechanisms provided by individual utility customers; ( c ) distributed generation resource capacity provided by electric utilities; and ( d ) virtual power plants , which may be part of or in addition to the virtual power plant program and any associated tariffs proposed under § 56-585.1:16. In addition, the Commission shall determine by regulation whether a Phase I or Phase II Utility must require any new electric service customer with an electric demand of 25 megawatts or greater, or any new e lectric service customer subject to the utility's effective large load tariff, to procure energy storage resources or use other mechanisms identified in the grid utilization standard as a condition of interconnection .
C. By January 1, 2027, each Phase I and Phase II Utility shall implement a grid utilization program for customers within its service territory, as approved by the Commission to be in the public interest and subject to any regulations promulgated under subsection B.
D. In evaluating grid utilization programs, the Commission shall consider (i) any costs or benefits to utility customers, including rate impacts; (ii) reliability of electric service and the electric grid system; (iii) maximizing the use of existing electric distribution grid and transmission infrastructure; and (iv) maximizing the use of non-wires alternatives to increase electric load capacity and electric grid services . The Commission shall only approve a grid utilization program that is feasible and cost-effective. In determining feasibility and cost-effectiveness, the Commission may consult with an independent analyst or co nduct internal studies as needed and appropriate.
E. By December 3 1 , 202 7 , and annually thereafter, each Phase I and Phase II Utility shall submit a report to the Commission detailing its activities, plans, and progress regarding grid utilization , including implementation of its grid utilization program and any other grid utilization measures taken by the utility in the preceding year. The report shall also include grid utilization measures that are currently in effect and any proposed measures to be taken during the next year.