OFFERED FOR CONSIDERATION
1/23/2025
2025 SESSION
INTRODUCED
25103585D
HOUSE BILL NO. 2470
AMENDMENT IN THE NATURE OF A SUBSTITUTE
(Proposed by the House Committee on Labor and Commerce
on ________________)
(Patron Prior to Substitute—Delegate Higgins)
Offered January 13, 2025
Prefiled January 8, 2025
A BILL to require an electric utility to provide certain notice prior to the construction of certain electric transmission lines.
—————
Patron—Higgins
—————
Referred to Committee on Labor and Commerce
—————
Be it enacted by the General Assembly of Virginia:
1. § 1. That, in addition to any notices required pursuant to subsection E of § 15.2-2202 and subsection B of § 56-46.1 of the Code of Virginia , any electric utility that is responsible for the construction, operation, or maintenance of an electric transmission line of 138 kilovolts or more within a locality shall provide written notice to the governing body of such locality at least 90180 days prior to the filing of an application with the State Corporation Commission for the approvalconstruction of such transmission line pursuant to § 56-46.1 or subsection A of § 56-265.2 of the Code of Virginia. Such noticenotices shall include a written description of the proposed route or routes for the transmission line , as well as a map or sketch of suchthe proposed route or routes , including a digital geographic information system map ,provided thatby the electric utility anticipates proposing in such application . As used in this act, "electric utility" hasshowing the same meaning as provided in § 56-576location of the Codeproposed of Virginia, except that "electric utility " does not include any Phase I or Phase II Utility, as those terms are defined in subdivision A 1 of § 56-585route.1 of the Code of Virginia, or the affiliate of a Phase I or Phase II Utility.