Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| By: Zaffirini | S.B. No. 34 | |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to county authority to regulate the development of certain | |
| large electricity users. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1 Chapter 231, Local Government Code, is amended | |
| by adding Subchapter N to read as follows: | |
| SUBCHAPTER N. COUNTY REGULATION OF LARGE-LOAD ELECTRICITY USERS | |
| Sec. 231.301. DEFINITIONS. In this subchapter: | |
| (1) "Large computational load facility" means a tract | |
| or one or more contiguous or noncontiguous tracts of land under | |
| common ownership or control that are developed or proposed for | |
| development for use by a large computational load. | |
| (2) "County large computational load zoning district" | |
| means a zoning district established under this subchapter. | |
| (3) "Large computational load" means a business that: | |
| (A) is primarily engaged in: | |
| (i) creating, executing, and delivering | |
| software applications and services; | |
| (ii) artificial intelligence training, | |
| deployment, and delivery; | |
| (iii) adding virtual currency transactions | |
| to a distributed ledger; or | |
| (iv) other computational activities at a | |
| data center; and | |
| (B) is a large load under Section 37.0561, | |
| Utilities Code; or | |
| (C) a substation, transmission or distribution | |
| facilities, or other electric infrastructure designed to serve the | |
| facility or project; and | |
| (D) in determining whether a facility or project | |
| meets the requirements of Paragraph (B), the county may aggregate | |
| related facilities, phases, contiguous or noncontiguous tracts, | |
| meters, or projects that are under common ownership or control or | |
| are developed, financed, constructed, or operated as part of a | |
| common plan. | |
| (4) "Project" includes the construction of a new large | |
| computational load or a material expansion, redevelopment, or | |
| change in the use of an existing facility. A material expansion is | |
| an increase in electricity demand of at least 10 megawatts. | |
| Sec. 231.302. APPLICABILITY. This subchapter applies only to | |
| the unincorporated area of a county. | |
| Sec. 231.303. AUTHORITY TO ESTABLISH LARGE COMPUTATIONAL | |
| LOAD ZONING DISTRICTS. (a) To protect the public health, safety, | |
| and welfare, promote the orderly development of the county, and | |
| ensure that county residents benefit from large computational load | |
| development, the commissioners court may establish one or more | |
| county large computational load zoning districts and regulate the | |
| location and development of large computational load and large | |
| computational load within a district consistent with this | |
| subchapter. | |
| (b) A district may include all or part of the unincorporated | |
| area of the county. The boundaries of the district must be | |
| described by metes and bounds or shown on a map adopted as part of | |
| the order establishing the district. | |
| (c) A zoning district or district boundary is not effective | |
| until adopted by the commissioners court after a public hearing. | |
| Before adopting a district or district boundary, the commissioners | |
| court shall provide public notice and hold a public hearing in | |
| accordance with procedures adopted by the court. | |
| (d) After the commissioners court provides notice of a | |
| hearing to establish or amend a county large computational load | |
| zoning district, a person may not begin construction or development | |
| of, or materially expand, redevelop, or materially change the use | |
| of, a county large computational load facility within the area | |
| described in the notice until the commissioners court: | |
| (1) adopts or rejects the proposed district or | |
| amendment; or | |
| (2) fails to take action on the proposed district or | |
| amendment before the 91st day after the date notice is provided. | |
| Sec. 231.304. ZONING REGULATIONS. (a) The commissioners | |
| court may adopt reasonable zoning regulations within a county large | |
| computational load zoning district governing county large | |
| computational load facilities and large computational load, | |
| including regulations addressing: | |
| (1) the location of a county large computational load | |
| facility; | |
| (2) minimum lot size and tract dimensions; | |
| (3) setbacks, buffers, landscaping, screening, and | |
| open-space requirements; | |
| (4) measures reasonably necessary to protect nearby | |
| residential, educational, medical, agricultural, or | |
| environmentally sensitive uses from incompatible development; | |
| (5) access roads, traffic mitigation, emergency | |
| access, and transportation impacts; | |
| (6) noise, vibration, exterior lighting, and other | |
| off-site impacts; | |
| (7) water supply, water conservation, cooling | |
| technology, wastewater service, stormwater management, drainage, | |
| floodplain management, and land subsidence risks, as applicable; | |
| (8) fire protection, emergency response, law | |
| enforcement, and other public safety considerations; | |
| (9) improvements, mitigation measures, capacity | |
| requirements, and service arrangements necessary to address | |
| project-related demands on county roads, bridges, drainage and | |
| flood-mitigation infrastructure, facilities, services, and county | |
| infrastructure capacity; | |
| (10) disclosure of information necessary for the | |
| county to evaluate impacts on public infrastructure, water | |
| resources, emergency services, public safety, and county finances, | |
| subject to Chapter 552, Government Code; | |
| (11) reasonable mitigation measures, road-use | |
| agreements, infrastructure agreements, and cost-sharing agreements | |
| reasonably related to project impacts and necessary to ensure that | |
| project-related county infrastructure, mitigation, remediation, | |
| and service costs are borne by the project rather than county | |
| taxpayers; | |
| (12) performance bonds, closure bonds, site- | |
| restoration commitments, and other financial assurances necessary | |
| to ensure compliance and address abandonment, prolonged | |
| inactivity, decommissioning, demolition, remediation, removal of | |
| equipment or hazardous materials, and final site restoration; and | |
| (13) any other reasonable land-use regulation | |
| directly related to the public health, safety, or welfare or the | |
| orderly development of the county. | |
| (b) A zoning regulation adopted under this section must be | |
| reasonably related to a documented or reasonably foreseeable impact | |
| of a large computational load and may not be arbitrary or unrelated | |
| to a purpose authorized by this subchapter. | |
| (c) The county may determine the amount, form, duration, | |
| issuer, renewal requirements, and conditions for release of a | |
| performance bond, closure bond, letter of credit, or other | |
| financial assurance. The amount must be reasonably related to the | |
| anticipated cost of compliance, mitigation, remediation, | |
| decommissioning, or site restoration. | |
| (d) A county may not adopt regulations that directly | |
| conflict with a regulation adopted by a state agency. | |
| Sec. 231.305. SPECIAL USE PERMIT. (a) The commissioners | |
| court may require a person to obtain a special use permit before | |
| developing, constructing, materially expanding, redeveloping, or | |
| materially changing a county large computational load facility | |
| within a county large computational load zoning district. | |
| (b) An application for a special use permit may require: | |
| (1) submission of site plans and engineering studies; | |
| (2) information regarding traffic, water supply, | |
| wastewater, drainage, floodplain, emergency service, public | |
| safety, and county infrastructure impact analyses; | |
| (3) information regarding anticipated electric | |
| demand, energization schedules, load growth, and electric | |
| infrastructure associated with the project; | |
| (4) identification of any proposed water source and | |
| information regarding the availability of an adequate long-term | |
| water supply; | |
| (5) supporting documentation prepared or certified by | |
| a professional engineer licensed in this state demonstrating that | |
| the proposed electric, water, wastewater, and other utility service | |
| and any required infrastructure improvements are reasonably | |
| capable of serving the projected demand of the project without | |
| impairing existing service; | |
| (6) documentation that the project has been submitted | |
| to any applicable review or interconnection process required by the | |
| Public Utility Commission of Texas or administered by the Electric | |
| Reliability Council of Texas or another entity with jurisdiction; | |
| (7) information reasonably necessary to identify and | |
| evaluate measures to mitigate documented adverse impacts within the | |
| county's authority under this subchapter. | |
| (c) Before acting on a special use permit, the commissioners | |
| court may provide public notice and may hold a public hearing in | |
| accordance with procedures adopted by the court. | |
| (d) The county may determine whether an application is | |
| complete and may require the applicant to submit additional | |
| information reasonably necessary to evaluate the application. A | |
| permit application is not considered filed until the county | |
| determines that the application is complete. | |
| (e) The commissioners court may approve, conditionally | |
| approve, or deny a special use permit based on compliance with this | |
| subchapter and zoning regulations adopted under this subchapter. | |
| The county may make the final decision and any conditions imposed on | |
| the permit available to the public in a manner prescribed by the | |
| commissioners court. | |
| (f) A permit may be denied if the applicant fails to | |
| demonstrate compliance with applicable zoning regulations or fails | |
| to adequately address a documented or reasonably foreseeable impact | |
| within the county's authority under this subchapter. | |
| (g) After notice and an opportunity to cure, the county may | |
| suspend or revoke a special use permit for a material violation of | |
| this subchapter, a zoning regulation, or a condition of the permit. | |
| (h) The county may issue a stop-work order if construction | |
| or development is occurring without a required permit or in | |
| material violation of a zoning regulation or permit condition. The | |
| order remains effective until the violation is corrected or the | |
| order is modified or withdrawn by the county or a court. | |
| (i) The commissioners court may impose reasonable | |
| application, inspection, administrative, and professional-review | |
| fees including the reasonable cost of qualified consultants | |
| retained by the county, in an amount not to exceed the county's | |
| actual costs of administering this subchapter and reviewing the | |
| application. | |
| (j) Information submitted under this section is subject to | |
| Chapter 552, Government Code. A county may not enter into an | |
| agreement requiring the county to withhold information from public | |
| disclosure except to the extent withholding is authorized by that | |
| chapter or other law. | |
| Sec. 231.306. ELECTRIC REGULATION; PROJECT INFORMATION. | |
| (a) This subchapter does not authorize a county to regulate: | |
| (l) electric rates or electric service; | |
| (1-a) water rates or water service; | |
| (2) generation permitting; | |
| (3) transmission or distribution facility siting or | |
| interconnection standards; and | |
| (4) the operations of the Public Utility Commission of | |
| Texas or the Electric Reliability Council of Texas; | |
| (b) In evaluating a project under this subchapter, a county | |
| may request and consider information regarding: | |
| (1) anticipated electric demand; | |
| (2) the timing and scale of load growth; | |
| (3) planned substations, transmission or distribution | |
| facilities, or other electric infrastructure associated with the | |
| project; | |
| (4) the status of the project in any applicable review | |
| or interconnection process required or administered by the Public | |
| Utility Commission of Texas or the Electric Reliability Council of | |
| Texas; and | |
| (5) measures proposed to reduce impacts on county | |
| infrastructure, emergency services, public safety, water supplies, | |
| and neighboring property. | |
| (c) Nothing in this section prohibits a county from | |
| requesting or considering information concerning electric demand, | |
| energization schedules, substations, transmission or distribution | |
| infrastructure, interconnection status, reliability impacts, or | |
| curtailment capability for the purpose of evaluating land use, | |
| roads, drainage, water, emergency services, public safety, | |
| neighboring property, or county financial impacts. | |
| Sec. 231.307. NONCONFORMING USES. (a) A county large | |
| computational load facility lawfully developed, or a large | |
| computational load lawfully operating before the effective date of | |
| a zoning regulation adopted under this subchapter may continue as a | |
| lawful nonconforming use. | |
| (b) Zoning regulations adopted under this subchapter apply | |
| to a material expansion, redevelopment, or change in use of a | |
| nonconforming county large computational load facility or large | |
| computational load. In evaluating an expansion, redevelopment, or | |
| change in use, the county may consider the cumulative impacts of the | |
| existing county large computational load facility or large | |
| computational load and the proposed activity. | |
| (c) A county large computational load facility or large | |
| computational load is not entitled to nonconforming-use status | |
| solely because land has been purchased, a project has been | |
| announced, utility service has been requested, or a preliminary | |
| application has been submitted. | |
| Sec. 231.308. ENFORCEMENT. (a) A county may bring an | |
| action for injunctive relief to prevent or restrain a violation of | |
| this subchapter, a zoning regulation adopted under this subchapter, | |
| or a special use permit issued under this subchapter. | |
| (b) A person who violates this subchapter, a zoning | |
| regulation adopted under this subchapter, or a special use permit | |
| issued under this subchapter is liable to the county for a civil | |
| penalty of not less than $500 or more than $10,000 for each | |
| violation for each day the violation continues. | |
| (c) The county attorney or district attorney may bring an | |
| action under this section in a district court in the county. | |
| (d) A county that prevails in an enforcement action under | |
| this section may recover reasonable attorney's fees, court costs, | |
| investigative costs, and expert-witness fees. | |
| Sec. 231.309. CONSTRUCTION OF SUBCHAPTER. (a) This | |
| subchapter shall be liberally construed to accomplish its purposes | |
| of protecting the public health, safety, and welfare; promoting the | |
| orderly development of each county; and protecting neighboring | |
| property and public infrastructure; | |
| (b) This subchapter may not be construed to authorize a | |
| county to regulate electric rates, electric service, wholesale | |
| electric markets, electric reliability standards, or a matter | |
| assigned by state or federal law to the Public Utility Commission of | |
| Texas, the Electric Reliability Council of Texas, or a federal | |
| agency. | |
| Sec. 231.310. COORDINATION WITH COUNTY SUBDIVISION | |
| REGULATION. (a) Notwithstanding Section 232.001(h), a county may | |
| require an applicant for a plat or replat of property located within | |
| a large computational load zoning district to submit information, | |
| analyses, studies, plans, agreements, and financial assurances | |
| authorized by this subchapter or regulations adopted under this | |
| subchapter. | |
| (b) Notwithstanding Section 232.0025, an application for a | |
| plat or replat of property located within a county large | |
| computational load zoning district is not considered complete, and | |
| the period within which the commissioners court or county authority | |
| must approve, conditionally approve, or disapprove the application | |
| does not begin, until: | |
| (1) the county determines that the application | |
| includes the information required under this subchapter, | |
| regulations adopted under this subchapter, and Chapter 232; and | |
| (2) any special use permit required for the | |
| development proposed in the application has been finally approved; | |
| (c) The denial of a special use permit required for | |
| development proposed in a plat or replat application constitutes | |
| grounds for disapproval of the plat or replat application. | |
| SECTION 2. This Act takes effect September 1, 2027. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.