| By: Gutierrez | S.B. No. 296 | |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the siting, construction, permitting, and operation of | |
| certain data centers; requiring local option elections; imposing a | |
| temporary moratorium; establishing an annual payments to county | |
| residents; repealing certain tax exemptions; providing civil | |
| penalties. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subtitle B, Title 5, Health and Safety Code, is | |
| amended by adding Chapter 398 to read as follows: | |
| CHAPTER 398. DATA CENTER SITING, COMMUNITY CONSENT, AND PUBLIC | |
| BENEFIT | |
| SUBCHAPTER A. GENERAL PROVISIONS | |
| Sec. 398.001. DEFINITIONS. In this chapter: | |
| (1) "Artificial intelligence compute occupant" means | |
| a person that owns, leases, controls, or uses computing equipment | |
| at a covered data center primarily to train, develop, fine-tune, or | |
| operate a generative or other machine-learning model for commercial | |
| consideration. The term includes a person receiving dedicated | |
| computing capacity through a contract with the owner or operator of | |
| the center but does not include a retail customer making ordinary, | |
| incidental use of an artificial intelligence service. | |
| (2) "Commission" means the Texas Commission on | |
| Environmental Quality. | |
| (3) "Covered data center" means one or more buildings, | |
| facilities, or installations under common ownership or control, or | |
| designed or operated as an integrated project, that contain or are | |
| proposed to contain computing equipment used for processing, | |
| storage, distribution of data, or artificial intelligence, and | |
| that: | |
| (A) have a designed aggregate maximum electric | |
| demand of 20 megawatts or more; or | |
| (B) contain or are proposed to contain 50,000 | |
| square feet or more of space primarily devoted to the equipment | |
| described by this subdivision. | |
| (4) "Developer" includes an owner, operator, | |
| applicant, affiliate, successor, or person acting in concert to | |
| construct, expand, occupy, or operate a covered data center. | |
| (5) "Local approval" means voter approval under | |
| Subchapter C. | |
| (6) "Project" includes a new covered data center or | |
| expansion that increases a center's maximum electric demand by 10 | |
| megawatts or more or gross equipment floor area by 25,000 square | |
| feet or more. | |
| (7) "Host county" means the county in which a covered | |
| data center is located. If a covered data center occupies land in | |
| more than one county, each county is a host county and payments | |
| under Subchapter E must be allocated among the host counties in | |
| proportion to the maximum electric demand of the equipment located | |
| in each county. | |
| (8) "Eligible resident" means a natural person whose | |
| principal residence is in a host county for at least 183 days of the | |
| calendar year for which a stipend is paid. The term includes a minor | |
| child; a payment to a minor shall be made to the child's parent or | |
| legal guardian on behalf of the child. Ownership of real property, | |
| citizenship status, and income may not be used as conditions of | |
| eligibility. | |
| Sec. 398.002. AGGREGATION; EVASION PROHIBITED. (a) For | |
| purposes of this chapter, adjacent or nearby facilities within two | |
| miles that share a common developer, financing, utility | |
| interconnection, water supply, or operational plan are presumed to | |
| be one covered data center. | |
| (b) A person may not divide, phase, lease, convey, or | |
| separately permit a project for the purpose of avoiding this | |
| chapter. The commission shall consider reasonably foreseeable | |
| future phases in determining applicability. | |
| Sec. 398.003. APPLICABILITY; OTHER LAW. (a) This chapter | |
| applies to projects proposed after the effective date of the Act | |
| adding this chapter and to covered projects that have not commenced | |
| substantial physical construction on that date. | |
| (b) This chapter does not dispense with any permit, | |
| approval, or requirement imposed by federal or state law, a | |
| groundwater conservation district, or a political subdivision. | |
| (c) A permit, interconnection agreement, zoning approval, | |
| or incentive agreement does not substitute for approval required by | |
| this chapter. | |
| SUBCHAPTER B. TEMPORARY MORATORIUM | |
| Sec. 398.051. TWO-YEAR MORATORIUM. (a) Before the second | |
| anniversary of the effective date of the Act adding this chapter, a | |
| state agency or political subdivision may not issue a permit, | |
| approval, authorization, or certificate for the construction or | |
| expansion of a project, and a utility may not energize a new or | |
| expanded electric service connection for a project. | |
| (b) A person may not commence or continue substantial | |
| physical construction of a project during the period prescribed by | |
| Subsection (a), except work necessary to address an imminent threat | |
| to life, health, or the environment or to maintain a facility in | |
| lawful operation on the effective date of the Act adding this | |
| chapter. | |
| (c) An application submitted during the moratorium may be | |
| received and reviewed, but no approval may be issued and no vested | |
| right to approval arises from its submission or review. | |
| Sec. 398.052. EXISTING OPERATIONS. This subchapter does | |
| not prohibit continued operation at the lawfully authorized demand | |
| and floor area of a covered data center in commercial operation on | |
| the effective date of the Act adding this chapter. An expansion | |
| remains subject to Section 398.051. | |
| SUBCHAPTER C. LOCAL OPTION ELECTION | |
| Sec. 398.101. LOCAL ELECTION REQUIRED. (a) The commission | |
| may not issue a permit under this chapter unless the development of | |
| the project has been approved by a majority of voters voting at a | |
| local option election held under this subchapter. | |
| (b) For a project in an unincorporated area, the county | |
| shall conduct the election among the registered voters of the | |
| county. For a project within a municipality, the municipality | |
| shall conduct an election among its registered voters and the | |
| county shall conduct a separate election among its registered | |
| voters; both elections must approve the project. | |
| (c) If the project crosses municipal or county boundaries, | |
| each affected municipality and county must approve the project by | |
| separate election. | |
| Sec. 398.102. PETITION AND ORDER. (a) A developer seeking | |
| local approval shall file a request with the governing body of each | |
| political subdivision required to hold an election, together with a | |
| project description, projected peak demand, annual water use, | |
| emergency generation capacity, parcel description, and the | |
| disclosure required by Section 398.151. | |
| (b) The governing body shall order an election for the next | |
| uniform election date under Section 41.001, Election Code, for | |
| which the election can lawfully be ordered and administered. The | |
| developer shall reimburse each political subdivision for the | |
| reasonable cost of the election. | |
| Sec. 398.103. BALLOT. The ballot shall be prepared to | |
| permit voting for or against the proposition: "The approval of a | |
| [name of project] data center at [general location], with a | |
| proposed maximum electric demand of [number] megawatts and | |
| projected annual water use of [number] gallons, subject to state | |
| permitting, public disclosure, and annual payments to county | |
| residents." | |
| Sec. 398.104. EFFECT OF REJECTION; MATERIAL CHANGE. (a) A | |
| project rejected at an election may not be submitted for another | |
| election before the second anniversary of that election. | |
| (b) An approval does not authorize a material increase of | |
| more than 10 percent in the demand, water use, or physical footprint | |
| disclosed to voters. A material increase requires another | |
| election. | |
| Sec. 398.105. PUBLIC NOTICE. At least 60 days before the | |
| election, the developer shall provide a plain-language impact | |
| statement on a publicly accessible website and by first-class mail | |
| to residents of the host county. The statement must identify | |
| projected electric and water demand, planned sources of electricity | |
| and water, potential noise, emissions, requested incentives, | |
| expected infrastructure costs, and the proposed annual county | |
| resident stipend and the method for calculating it. | |
| SUBCHAPTER D. STATE DATA CENTER PERMIT | |
| Sec. 398.151. PERMIT REQUIRED. (a) A person may not | |
| construct, expand, or commence operation of a project without a | |
| data center impact permit issued by the commission in addition to | |
| all other approvals required by law. | |
| (b) An application must contain independently verified | |
| studies of: | |
| (1) projected hourly peak and annual electric demand, | |
| required transmission and distribution facilities, and effects on | |
| residential rates and grid reliability; | |
| (2) daily and annual water withdrawals and consumptive | |
| use, drought-stage operation, aquifer and surface-water impacts, | |
| and effects on drinking-water availability; | |
| (3) air emissions from emergency generation and other | |
| sources; | |
| (4) noise at the nearest residence and property | |
| boundary, including low-frequency noise; | |
| (5) cumulative impacts of other existing or proposed | |
| facilities in the same watershed or electric service territory; and | |
| (6) site restoration, emergency response, financial | |
| assurance, and mitigation of adverse effects on surrounding | |
| communities. | |
| Sec. 398.152. INTERAGENCY REVIEW; FINDINGS. (a) Before | |
| issuing a permit, the commission shall obtain written findings from | |
| the Public Utility Commission of Texas concerning electric | |
| reliability, system costs, and compliance with Section 37.0561, | |
| Utilities Code, and from the Texas Water Development Board | |
| concerning water supply and drought impacts. | |
| (b) The commission may issue a permit only if the applicant | |
| establishes by a preponderance of the evidence that: | |
| (1) the project will not materially impair the ability | |
| of local residents to obtain affordable, reliable electricity or | |
| drinking water; | |
| (2) the developer will bear all reasonably | |
| attributable incremental interconnection and utility | |
| infrastructure costs, without shifting those costs to residential | |
| ratepayers; | |
| (3) the project incorporates water-efficient cooling | |
| technology and an enforceable drought curtailment plan; | |
| (4) noise, air emissions, and other nuisance impacts | |
| are minimized through best available practicable mitigation; | |
| (5) required financial assurance and reclamation | |
| plans are sufficient; and | |
| (6) the applicant has obtained local approval and | |
| entered into all agreements required by Subchapter E. | |
| Sec. 398.153. PUBLIC CONTESTED CASE HEARING. (a) The | |
| commission shall provide notice of a complete application to | |
| residents of the host county and to each affected municipality, | |
| county, utility, and groundwater conservation district. | |
| (b) On the request of an affected person, the commission | |
| shall refer the application to the State Office of Administrative | |
| Hearings for a contested case hearing. A resident, property owner, | |
| or political subdivision within the host county is an affected | |
| person for purposes of this section. | |
| (c) The applicant has the burden of proof. The commission | |
| may not issue a permit before findings from the hearing are | |
| considered. | |
| Sec. 398.154. MONITORING; REVIEW. (a) A permit holder | |
| shall meter electric consumption and water withdrawals and | |
| consumption separately for each project and submit quarterly | |
| verified reports to the commission, the Public Utility Commission | |
| of Texas, and the Texas Water Development Board. | |
| (b) Reports, permit applications, compliance records, and | |
| beneficial ownership of a permit holder are public information, | |
| except for specific technical cybersecurity information protected | |
| by other law. | |
| (c) The commission shall review a permit at least once every | |
| five years and may amend, suspend, or revoke the permit for material | |
| noncompliance. A material increase in demand, consumption, or | |
| footprint is a new project subject to Subchapter C. | |
| Sec. 398.155. FINANCIAL ASSURANCE. Before construction, | |
| the developer shall provide a bond or other financial assurance in | |
| an amount determined by the commission sufficient to fund site | |
| reclamation, groundwater remediation if applicable, and the | |
| correction of reasonably foreseeable off-site harms. | |
| SUBCHAPTER E. ANNUAL STIPEND FOR COUNTY RESIDENTS | |
| Sec. 398.201. COUNTY RESIDENT STIPEND FUND. (a) A | |
| developer shall, as a condition of receiving and maintaining a | |
| permit under this chapter, establish an independently audited | |
| county resident stipend fund for each host county. The fund shall | |
| be held in trust solely for payments to eligible residents of that | |
| county under this subchapter. | |
| (b) A fund may not be used for general county operations, | |
| economic development subsidies, tax abatements, or payments to the | |
| developer or an affiliate. The commission shall provide for | |
| independent administration, annual public audits, and disclosure | |
| of the amount received and the amount distributed. | |
| Sec. 398.202. ANNUAL PAYMENT BY DATA CENTER. (a) For each | |
| calendar year during which a covered data center operates, the | |
| developer and operator are jointly and severally liable for an | |
| annual county resident stipend payment in an amount equal to the | |
| greater of: | |
| (1) two percent of gross receipts derived from the | |
| provision of data processing, computing capacity, artificial | |
| intelligence training, inference, data storage, or related | |
| services performed using the covered data center; or | |
| (2) $10,000 multiplied by the number of megawatts of | |
| the covered data center's maximum authorized electric demand. | |
| (b) Gross receipts include amounts received by an affiliate | |
| or person under common control for services attributable to | |
| computing equipment at the covered data center. For computing | |
| capacity used by the developer or an affiliate rather than sold to | |
| an unrelated customer, gross receipts shall include the fair market | |
| value of that computing capacity as determined under rules adopted | |
| by the commission. | |
| (c) The payment is due March 1 for the preceding calendar | |
| year. A partial year of operation is prorated by the number of days | |
| the center operated. The obligation may not be avoided by a lease, | |
| a service agreement, division of a project, or transfer of the | |
| center to an affiliate. | |
| (d) The developer shall file an annual sworn statement of | |
| gross receipts and authorized demand. The commission may audit the | |
| statement and examine records necessary to verify the annual amount | |
| owed. | |
| Sec. 398.203. ANNUAL STIPEND TO RESIDENTS. (a) Not later | |
| than June 1 of each year, the administrator of the fund shall | |
| distribute the money received under Section 398.202, less | |
| reasonable audited administrative expenses not exceeding two | |
| percent of the annual payment, in equal per-person amounts to all | |
| eligible residents of the host county. | |
| (b) The administrator shall provide a reasonably accessible | |
| method for residents to establish eligibility, including an | |
| alternative to electronic verification, and may rely on records | |
| maintained by a state agency, school district, or county subject to | |
| applicable confidentiality protections. | |
| (c) A stipend may not depend on ownership of a homestead or | |
| other property, income, employment, or whether the recipient lives | |
| within a specified distance of the data center. A resident is | |
| eligible only once for the same calendar year with respect to each | |
| host county. | |
| (d) Unclaimed payments shall be held for three years and | |
| then added to the amount available for distribution in that county | |
| for the next payment year. The administrator shall publish the | |
| annual payment obligation, total eligible residents, and amount of | |
| the stipend per person. | |
| Sec. 398.204. PAYMENT IN ADDITION TO OTHER OBLIGATIONS. A | |
| payment under this subchapter is in addition to all taxes, utility | |
| charges, mitigation, and other obligations under law. The payment | |
| may not be credited against or used to reduce an obligation | |
| otherwise imposed on the developer and may not be collected through | |
| a separately identified charge on residential electricity or water | |
| bills. | |
| Sec. 398.205. ENFORCEMENT. (a) The attorney general, the | |
| commission, the county, or an eligible resident may bring an action | |
| for an injunction, an accounting, or the collection of amounts due | |
| under this subchapter. | |
| (b) A court may award reasonable attorney's fees and costs | |
| to a prevailing claimant. Remedies under this section are | |
| cumulative of other remedies provided by law. | |
| SUBCHAPTER F. ENFORCEMENT | |
| Sec. 398.251. CIVIL PENALTY; INJUNCTION. (a) A person who | |
| constructs, expands, or operates a project in violation of this | |
| chapter is liable to the state for a civil penalty not to exceed | |
| $25,000 for each day of violation. Each day constitutes a separate | |
| violation. | |
| (b) The attorney general, on request of the commission or an | |
| affected political subdivision, may bring an action for an | |
| injunction and civil penalties. A court may order cessation of | |
| unauthorized construction or operation. | |
| Sec. 398.252. RULES. The commission, in consultation with | |
| the Public Utility Commission of Texas and the Texas Water | |
| Development Board, shall adopt rules to implement this chapter. | |
| Rules may not reduce the requirements or eligibility thresholds | |
| prescribed by this chapter. | |
| SECTION 2. Sections 151.317(a), (b), and (d), Tax Code, are | |
| amended to read as follows: | |
| (a) Subject to Section [ |
|
| are exempted from the taxes imposed by this chapter when sold for: | |
| (1) residential use; | |
| (2) use in powering equipment exempt under Section | |
| 151.318 or 151.3185 by a person processing tangible personal | |
| property for sale as tangible personal property, other than | |
| preparation or storage of prepared food described by Section | |
| 151.314(c-2); | |
| (3) use in lighting, cooling, and heating in the | |
| manufacturing area during the actual manufacturing or processing of | |
| tangible personal property for sale as tangible personal property, | |
| other than preparation or storage of prepared food described by | |
| Section 151.314(c-2); | |
| (4) use directly in exploring for, producing, or | |
| transporting, a material extracted from the earth; | |
| (5) use in agriculture, including dairy or poultry | |
| operations and pumping for farm or ranch irrigation; | |
| (6) use directly in electrical processes, such as | |
| electroplating, electrolysis, and cathodic protection; | |
| (7) use directly in the off-wing processing, overhaul, | |
| or repair of a jet turbine engine or its parts for a certificated or | |
| licensed carrier of persons or property; | |
| (8) use directly in providing, under contracts with or | |
| on behalf of the United States government or foreign governments, | |
| defense or national security-related electronics, classified | |
| intelligence data processing and handling systems, or | |
| defense-related platform modifications or upgrades; | |
| (9) [ |
|
| [ |
|
| of electricity by an electric utility engaged in the purchase of | |
| electricity for resale; or | |
| (10) [ |
|
| pumping for irrigation of timberland. | |
| (b) The sale, production, distribution, lease, or rental | |
| of, and the use, storage, or other consumption in this state of, gas | |
| and electricity sold for the uses listed in Subsection (a), are | |
| exempted from the taxes imposed by a municipality under Chapter 321 | |
| except as provided by Section [Sections 151.359(j) and] 321.105. | |
| (d) To qualify for the exemptions in Subsections (a)(2)-(8) | |
| [ |
|
| using the gas or electricity in the exempt manner. For purposes of | |
| this subsection, the use of gas or electricity in an exempt manner | |
| by an independent contractor engaged by the purchaser of the gas or | |
| electricity to perform one or more of the exempt activities | |
| identified in Subsections (a)(2)-(8) [ |
|
| use by the purchaser of the gas or electricity. | |
| SECTION 3. Section 321.208, Tax Code, is amended to read as | |
| follows: | |
| Sec. 321.208. STATE EXEMPTIONS APPLICABLE. The exemptions | |
| provided by Subchapter H, Chapter 151, apply to the taxes | |
| authorized by this chapter, except as provided by Section [ |
|
| SECTION 4. Section 323.207, Tax Code, is amended to read as | |
| follows: | |
| Sec. 323.207. STATE EXEMPTIONS APPLICABLE. The exemptions | |
| provided by Subchapter H, Chapter 151, apply to the taxes | |
| authorized by this chapter, except as provided by Section [ |
|
| SECTION 5. The following provisions of the Tax Code are | |
| repealed: | |
| (1) Section 151.359; | |
| (2) Section 151.3595; and | |
| (3) Section 313.009. | |
| SECTION 6. (a) An exemption under Section 151.359 or | |
| 151.3595, Tax Code, to which a person is entitled on the effective | |
| date of this Act expires on that date. No person is entitled to a | |
| refund or credit based on property purchased on or after that date | |
| under either repealed section. | |
| (b) An application for certification as a qualifying data | |
| center or qualifying large data center project pending on the | |
| effective date of this Act is considered denied and may not be | |
| approved by the comptroller. | |
| SECTION 7. (a) The Texas Commission on Environmental | |
| Quality, Public Utility Commission of Texas, and Texas Water | |
| Development Board shall adopt initial rules under Chapter 398, | |
| Health and Safety Code, as added by this Act, not later than March | |
| 1, 2028. | |
| (b) The moratorium imposed by Section 398.051, Health and | |
| Safety Code, as added by this Act, terminates on the second | |
| anniversary of the effective date of this Act, but all other | |
| provisions of Chapter 398 remain effective after that date. | |
| (c) The requirements of Subchapter E, Chapter 398, Health | |
| and Safety Code, apply only to projects for which a permit is first | |
| issued under that chapter after the effective date of this Act. | |
| SECTION 8. If any provision of this Act or its application | |
| to a person or circumstance is held invalid, the invalidity does not | |
| affect other provisions or applications that can be given effect | |
| without the invalid provision, and to this end the provisions of | |
| this Act are severable. | |
| SECTION 9. This Act takes effect immediately if it receives | |
| a vote of two-thirds of all the members elected to each house, as | |
| provided by Section 39, Article III, Texas Constitution. If this | |
| Act does not receive the vote necessary for immediate effect, this | |
| Act takes effect September 1, 2027. |