Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| By: Bhojani | H.B. No. 547 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to county noise study requirements and site construction | |
| approval for facilities operated by certain large load electric | |
| customers, authorizing a fee. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter B, Chapter 37, Utilities Code, is | |
| amended by adding Section 37.0562 to read as follows: | |
| Sec. 37.0562. COUNTY NOISE STUDIES FOR LARGE LOAD | |
| CUSTOMERS. (a) In this section, "large load customer" means an | |
| entity described by Section 37.0561(a) that is subject to the | |
| interconnection standards required under Section 37.0561(c), | |
| including a successor in interest to the entity. | |
| (b) A county may require a large load customer that proposes | |
| to construct or expand a facility in the unincorporated area of the | |
| county to prepare, submit, and publicly post pre-construction and | |
| post-construction noise studies in accordance with Subchapter G, | |
| Chapter 233, Local Government Code. | |
| (c) A county may condition the issuance and continued | |
| validity of a site construction approval for a facility described | |
| by Subsection (b) on compliance with the noise study, publication, | |
| and mitigation requirements established under Subchapter G, | |
| Chapter 233, Local Government Code. | |
| (d) This section does not authorize a county to regulate the | |
| interconnection or transmission service of an electric utility or | |
| to prevent compliance with a lawful instruction issued by the | |
| independent organization certified under Section 39.151 for the | |
| ERCOT power region during an energy emergency. | |
| SECTION 2. Chapter 233, Local Government Code, is amended | |
| by adding Subchapter G to read as follows: | |
| SUBCHAPTER G. NOISE STUDIES AND SITE CONSTRUCTION APPROVAL FOR | |
| LARGE LOAD CUSTOMER FACILITIES | |
| Sec. 233.171. DEFINITIONS. In this subchapter: | |
| (1) "A-weighted sound level" means a sound level | |
| expressed in A-weighted decibels, or dB(A), measured using the | |
| A-weighting network of a sound level meter. | |
| (2) "Covered facility" means a building, group of | |
| buildings, or associated equipment at a single site in the | |
| unincorporated area of a county that is proposed to be constructed | |
| or expanded for use by a large load customer in connection with a | |
| new or expanded interconnection subject to Section 37.0561(c), | |
| Utilities Code. The term includes exterior cooling, ventilation, | |
| mechanical, and customer-owned backup generating equipment serving | |
| the site. | |
| (3) "Large load customer" has the meaning assigned by | |
| Section 37.0562(a), Utilities Code. | |
| (4) "Noise study" means an acoustical assessment | |
| prepared or certified by an engineer licensed to practice | |
| professional engineering in this state who has experience in | |
| acoustical measurement or modeling. | |
| (5) "Receiving property" means real property other | |
| than the covered facility site at which sound attributable to the | |
| covered facility is assessed under this subchapter. | |
| (6) "Site construction approval" means the permit or | |
| other authorization issued by a county under this subchapter before | |
| construction or expansion of a covered facility may begin. | |
| Sec. 233.172. COUNTY AUTHORITY; APPLICABILITY. (a) The | |
| commissioners court of a county may by order adopt a program | |
| requiring site construction approval for a covered facility. An | |
| order adopted under this section applies only in the unincorporated | |
| area of the county. | |
| (b) A county that adopts an order under this section may: | |
| (1) require the large load customer or a person acting | |
| on the customer's behalf to submit a pre-construction noise study | |
| and proof of public posting as a condition of site construction | |
| approval; | |
| (2) condition site construction approval on | |
| implementation of noise mitigation measures necessary to satisfy | |
| Section 233.173; | |
| (3) require submission and public posting of a | |
| post-construction noise study and any necessary corrective | |
| measures as a continuing condition of site construction approval; | |
| and | |
| (4) designate an official or department to review | |
| applications, determine compliance, and administer and enforce | |
| this subchapter. | |
| (c) The authority granted by this subchapter is express | |
| statutory authority to require the noise studies, site plans | |
| showing noise mitigation measures, and other documents specified by | |
| this subchapter. The authority is separate from, and does not | |
| expand, a county's general authority to regulate land use or | |
| zoning. | |
| (d) The commissioners court may adopt reasonable | |
| administrative procedures and charge a fee not greater than the | |
| county's reasonable cost of reviewing an application, verifying | |
| publication, and administering this subchapter. | |
| Sec. 233.173. MAXIMUM SOUND LEVELS. (a) An order adopted | |
| under Section 233.172 must require that sound attributable to | |
| routine operation of a covered facility, measured at the nearest | |
| point on each affected receiving property line, not exceed the | |
| following maximum A-weighted sound levels: | |
| (1) 55 dB(A) for a property used for a dwelling or | |
| primarily for agricultural or rural purposes; | |
| (2) 60 dB(A) for a dwelling unit located within a mixed | |
| residential and commercial development; | |
| (3) 65 dB(A) for property used primarily for | |
| commercial, civic, or institutional purposes; and | |
| (4) 70 dB(A) for property used primarily for | |
| industrial purposes. | |
| (b) The maximum sound levels under Subsection (a) apply at | |
| all times of day and night. A county shall classify receiving | |
| property according to its existing lawful use or an approved | |
| residential development plan, regardless of whether the property is | |
| subject to zoning. If more than one category applies, the more | |
| protective maximum sound level controls. | |
| (c) In determining compliance, sound originating from | |
| sources not associated with the covered facility must be identified | |
| and excluded to the extent practicable using generally accepted | |
| acoustical methods. A covered facility is not required to reduce | |
| unrelated pre-existing ambient sound. | |
| (d) This section does not apply to sound generated by | |
| aircraft, temporary construction or maintenance activity, or | |
| customer-owned backup generating equipment operating during an | |
| actual emergency or pursuant to a lawful direction of an electric | |
| utility or the independent organization described by Section | |
| 39.151, Utilities Code. This exception does not apply to routine | |
| generator testing or commissioning. | |
| (e) This section does not authorize a violation of a state | |
| or federal environmental law or a permit issued under that law. | |
| Sec. 233.174. NOISE STUDY AND MEASUREMENT STANDARDS. (a) A | |
| noise study required under this subchapter must be prepared or | |
| certified by a professional engineer described by Section | |
| 233.171(4) and must identify the methods, equipment, locations, | |
| dates, operating conditions, assumptions, and results used in the | |
| study. | |
| (b) A pre-construction noise study must: | |
| (1) document existing ambient sound conditions at the | |
| time of the initial site construction approval application; | |
| (2) model the projected sound attributable to the | |
| covered facility at the receiving property lines under anticipated | |
| routine operating conditions, including cooling, ventilation, and | |
| routine generator testing; | |
| (3) identify each affected receiving property, the | |
| applicable maximum sound level under Section 233.173, and whether | |
| the projected sound will comply with that level; and | |
| (4) identify proposed mitigation measures if the | |
| projected sound level would otherwise exceed the applicable | |
| maximum. | |
| (c) A post-construction noise study must measure sound | |
| produced under representative operating conditions and evaluate | |
| compliance with Section 233.173. If the facility has not reached | |
| its reasonably anticipated maximum routine operating load, the | |
| study must also include modeling of that load. | |
| (d) Except as provided by Subsection (e), measurements | |
| under this section must: | |
| (1) use an integrating sound level meter meeting or | |
| exceeding ANSI S1.43-1997, Type 1, or an equivalent successor | |
| performance standard; | |
| (2) use the FAST response setting and a 15-second | |
| sampling interval, except that the engineer may select a period of | |
| at least 10 seconds and not more than one minute if the 15-second | |
| interval does not adequately characterize the sound; | |
| (3) include at least three samples in which the | |
| subject sound is identifiable and extraneous sounds that would | |
| materially distort the result are excluded, together with a | |
| background sample when practicable; | |
| (4) use the arithmetic average of samples showing | |
| repeatability and consistency to determine the sound level for | |
| comparison with Section 233.173; and | |
| (5) be taken at the nearest point on the receiving | |
| property line, with the microphone directed toward the source and | |
| positioned five feet above grade, unless physical circumstances | |
| require a documented alternative. | |
| (e) For a dwelling unit in a mixed-use development, | |
| measurement may be made at an open window, door, or other aperture | |
| nearest the source, with a windscreen-equipped microphone | |
| positioned at the aperture and directed toward the source. This | |
| subsection does not authorize entry on private property without | |
| permission. | |
| Sec. 233.175. PUBLICATION OF NOISE STUDIES. (a) A large | |
| load customer subject to a county order under Section 233.172 shall | |
| publish a publicly accessible version of each pre-construction and | |
| post-construction noise study on an Internet website accessible to | |
| the public without charge or registration and shall provide the | |
| county with the Internet address and a copy of the study. | |
| (b) The pre-construction noise study must be published | |
| before the county issues site construction approval and remain | |
| publicly accessible while construction is underway. The | |
| post-construction study must be published not later than the date | |
| the study is submitted to the county and remain publicly accessible | |
| for at least three years after publication. | |
| (c) Each published study must include the applicable sound | |
| limits, measurement or modeling methodology, results for receiving | |
| properties, the engineer's conclusions, and required mitigation | |
| measures. A customer may redact only information that is | |
| confidential under state or federal law, including qualifying | |
| security-sensitive or protected commercial information. A | |
| redaction may not conceal the sound levels, compliance findings, or | |
| required mitigation measures. | |
| (d) A county shall make the link to each published study | |
| available on the county's website or, if the county does not | |
| maintain a website, make the study available for public inspection | |
| at the office of the county clerk. | |
| Sec. 233.176. SITE CONSTRUCTION APPROVAL; SUBSEQUENT | |
| STUDY. (a) In a county that has adopted an order under Section | |
| 233.172, a large load customer may not begin construction or | |
| expansion of a covered facility without site construction approval | |
| issued under this subchapter. | |
| (b) The county may issue site construction approval only | |
| after the applicant: | |
| (1) submits the pre-construction noise study required | |
| by Section 233.174; | |
| (2) establishes that the study has been published as | |
| required by Section 233.175; | |
| (3) demonstrates that the covered facility, with any | |
| mitigation measures incorporated into the site plan, is projected | |
| to meet Section 233.173; and | |
| (4) agrees in writing to submit and publish the | |
| post-construction noise study and implement any required | |
| corrective measures as conditions of the approval. | |
| (c) A site construction approval issued under this | |
| subchapter is expressly conditioned on timely submission and | |
| publication of a post-construction noise study. The customer shall | |
| submit the post-construction study to the county not earlier than | |
| one month and not later than 12 months after the facility first | |
| begins routine operations. | |
| (d) Not later than the 30th day after the county receives a | |
| complete post-construction noise study, the county shall issue a | |
| written determination of compliance or specify deficiencies and the | |
| mitigation required. If compliance is shown, the county shall issue | |
| a final noise compliance certificate. A facility may operate | |
| during the period allowed for the post-construction study subject | |
| to the conditions of its site construction approval and other | |
| applicable law. | |
| (e) An order adopted under this subchapter may require an | |
| additional post-construction study following a material | |
| modification to equipment at a covered facility that the county | |
| reasonably determines is likely to increase sound at a receiving | |
| property. | |
| (f) A permit or approval required under this subchapter does | |
| not replace any other permit required by law. Review of a | |
| subdivision plat or development plan remains subject to Chapter 232 | |
| and other applicable law. | |
| Sec. 233.177. NOISE MITIGATION; ENFORCEMENT. (a) If a | |
| required noise study indicates that a covered facility will exceed | |
| or exceeds an applicable maximum sound level, the large load | |
| customer shall submit to the county an affidavit or certificate | |
| signed by the professional engineer identifying the mitigation | |
| measures needed for compliance. | |
| (b) Mitigation measures must be identified and labeled on | |
| the site plan and may include acoustical barriers, mechanical | |
| equipment enclosures, revised equipment placement, or other | |
| sound-control measures. A pre-construction plan showing projected | |
| exceedances may not be approved unless the proposed mitigation is | |
| projected to bring the facility into compliance. | |
| (c) If a post-construction study shows noncompliance, the | |
| county shall provide written notice describing the violation and | |
| require a corrective action plan with a reasonable deadline, not | |
| later than the 90th day after notice unless an extension is | |
| justified in writing. The county may require an additional | |
| engineer-certified verification study after mitigation is | |
| installed. | |
| (d) The county attorney, district attorney, or other | |
| attorney representing the county may bring an action in district | |
| court for injunctive relief to prevent construction without | |
| required site construction approval or to compel compliance with | |
| the publication, post-construction study, or mitigation conditions | |
| of an approval. A remedy affecting operation of a facility must be | |
| tailored to avoid interfering with a lawful electric system | |
| emergency instruction. | |
| (e) Before revoking a site construction approval for a | |
| violation of this subchapter, the county shall provide written | |
| notice, a reasonable opportunity to cure, and an opportunity for a | |
| hearing before the commissioners court or a designated hearing | |
| officer. | |
| Sec. 233.178. LIMITATIONS; OTHER LAW. (a) This subchapter | |
| does not authorize a county to adopt zoning regulations, regulate | |
| an electric utility's rates or interconnection service, or impose a | |
| condition inconsistent with a state or federal permit. | |
| (b) The applicability of this subchapter to a project is | |
| subject to Chapter 245, including any vested rights protected by | |
| that chapter. | |
| (c) Nothing in this subchapter limits a municipality's | |
| authority within its corporate limits or authorizes a county to | |
| require access to private property without consent or other lawful | |
| authority. | |
| SECTION 3. The changes in law made by this Act apply only to | |
| construction or expansion of a covered facility for which an | |
| initial application for a permit for the project is filed on or | |
| after September 1, 2027. Construction or expansion of a covered | |
| facility for which the initial permit application was filed before | |
| that date is governed by the law in effect when the application was | |
| filed, and the former law is continued in effect for that purpose. | |
| SECTION 4. This Act takes effect September 1, 2027. |