Engrossed
Underlined text would be added to current law. Struck-through text would be removed.
| By: Sparks, et al. | S.B. No. 715 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to reliability requirements for certain electric | |
| generation facilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Sections 39.1592(a) and (d), Utilities Code, are | |
| amended to read as follows: | |
| (a) This section applies only to an electric generation | |
| facility in the ERCOT power region that is subject to [ |
|
| standard generator interconnection agreement, [ |
|
| year, and [ |
|
| (d) The independent organization certified under Section | |
| 39.151 for the ERCOT power region may not impose penalties under | |
| Subsection (c): | |
| (1) for resource unavailability due to planned | |
| maintenance outages or transmission outages; | |
| (2) on resources that are already subject to | |
| performance obligations during the highest reliability risk hours | |
| under the day-ahead market rules or other ancillary or reliability | |
| services established by the commission or the independent | |
| organization; [ |
|
| (3) during hours outside a baseline established by the | |
| commission that includes morning and evening ramping periods; | |
| (4) on resources that demonstrate the ability to | |
| operate when called upon for dispatch for 24 continuous hours at or | |
| above the seasonal average generation capability through the | |
| resource's own generation capability or through a contract with an | |
| on-site or off-site resource, including a battery energy storage | |
| resource; or | |
| (5) on resources with dual but separate grid | |
| interconnections that provide dispatchable generation to the ERCOT | |
| power region. | |
| SECTION 2. Sections 52(b) and (c), Chapter 410 (H.B. 1500), | |
| Acts of the 88th Legislature, Regular Session, 2023, are repealed. | |
| SECTION 3. (a) The Public Utility Commission of Texas shall | |
| adopt rules as necessary to implement Section 39.1592, Utilities | |
| Code, as amended by this Act, not later than January 1, 2027. | |
| (b) Notwithstanding Subsection (a) of this section, an | |
| owner or operator of an electric generation facility that is | |
| subject to a power purchase agreement entered into before the | |
| effective date of this Act is not required to comply with the | |
| performance requirements described by Section 39.1592(b), | |
| Utilities Code, until the expiration of the agreement as it exists | |
| on the effective date of this Act. | |
| SECTION 4. (a) The Public Utility Commission of Texas shall | |
| consider the use of a settlement price cap, a fixed reliability fee, | |
| and other methods of imposing penalties under Section | |
| 39.1592(c)(1), Utilities Code. The Public Utility Commission of | |
| Texas and the independent organization certified under Section | |
| 39.151, Utilities Code, for the ERCOT power region shall: | |
| (1) consider rebating penalties collected under | |
| Section 39.1592 directly to consumers or redirecting a portion of | |
| the collected penalties toward reliability incentives; and | |
| (2) for the purposes of Subdivision (1) of this | |
| subsection, prioritize rebates of penalties or redirection of | |
| penalties in a manner the commission determines will provide the | |
| maximum financial benefit to consumers while still ensuring that | |
| the reliability needs of the ERCOT power region are met and | |
| premature retirements of dispatchable generation facilities are | |
| avoided. | |
| (b) Notwithstanding Section 39.1592(c), Utilities Code, the | |
| Public Utility Commission of Texas may allow the financial | |
| penalties and incentives required by that subsection to be adopted | |
| in a phased manner over multiple years to mitigate market | |
| disruptions that the commission determines would result in net | |
| increased costs to consumers. | |
| SECTION 5. This Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.