Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R10955 KRM-D | ||
| By: Zaffirini | S.B. No. 2441 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the regulation of preproduction plastic by the Texas | |
| Commission on Environmental Quality. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 361.003, Health and Safety Code, is | |
| amended by adding Subdivision (40) to read as follows: | |
| (40) "Preproduction plastic" means plastic resin | |
| pellets, flakes, fibers, and powders, and powdered coloring for | |
| plastics. | |
| SECTION 2. Subchapter B, Chapter 361, Health and Safety | |
| Code, is amended by adding Section 361.0115 to read as follows: | |
| Sec. 361.0115. CLASS II NONHAZARDOUS INDUSTRIAL WASTE: | |
| PREPRODUCTION PLASTIC. The commission by rule shall designate | |
| preproduction plastics as a Class II nonhazardous industrial waste. | |
| SECTION 3. Section 26.0135(a), Water Code, is amended to | |
| read as follows: | |
| (a) To ensure clean water, the commission shall establish | |
| the strategic and comprehensive monitoring of water quality and the | |
| periodic assessment of water quality in each watershed and river | |
| basin of the state. In order to conserve public funds and avoid | |
| duplication of effort, subject to adequate funding under Section | |
| 26.0291, river authorities shall, to the greatest extent possible | |
| and under the supervision of the commission, conduct water quality | |
| monitoring and assessments in their own watersheds. Watershed | |
| monitoring and assessments involving agricultural or silvicultural | |
| nonpoint source pollution shall be coordinated through the State | |
| Soil and Water Conservation Board with local soil and water | |
| conservation districts. The water quality monitoring and reporting | |
| duties under this section apply only to a river authority that has | |
| entered into an agreement with the commission to perform those | |
| duties. The commission, either directly or through cooperative | |
| agreements and contracts with local governments, shall conduct | |
| monitoring and assessments of watersheds where a river authority is | |
| unable to perform an adequate assessment of its own watershed. The | |
| monitoring program shall provide data to identify significant | |
| long-term water quality trends, characterize water quality | |
| conditions, support the permitting process, and classify | |
| unclassified waters. The commission shall consider available | |
| monitoring data and assessment results in developing or reviewing | |
| wastewater permits and stream standards and in conducting other | |
| water quality management activities. The assessment must include a | |
| review of wastewater discharges, nonpoint source pollution, | |
| pollution from preproduction plastic, as defined by Section | |
| 26.0421, nutrient loading, toxic materials, biological health of | |
| aquatic life, public education and involvement in water quality | |
| issues, local and regional pollution prevention efforts, and other | |
| factors that affect water quality within the watershed. The | |
| monitoring and assessment required by this section is a continuing | |
| duty, and the monitoring and assessment shall be periodically | |
| revised to show changes in the factors subject to assessment. | |
| SECTION 4. Section 26.023, Water Code, is amended to read as | |
| follows: | |
| Sec. 26.023. WATER QUALITY STANDARDS. (a) In this section: | |
| (1) "Preproduction plastic" has the meaning assigned | |
| by Section 26.0421. | |
| (2) "Quality assured data" has the meaning assigned by | |
| Section 26.0135(i). | |
| (b) The commission by rule shall set water quality standards | |
| for the water in the state and may amend the standards from time to | |
| time. The commission has the sole and exclusive authority to set | |
| water quality standards for all water in the state. The commission | |
| shall consider the existence and effects of nonpoint source | |
| pollution, preproduction plastic pollution, toxic materials, and | |
| nutrient loading in developing water quality standards and related | |
| waste load models for water quality. The commission shall develop | |
| standards based on all quality assured data obtained by the | |
| commission, including the local watershed and river basin database | |
| described by Section 26.0135(c)(2). [ |
|
| SECTION 5. Subchapter B, Chapter 26, Water Code, is amended | |
| by adding Section 26.0421 to read as follows: | |
| Sec. 26.0421. PREPRODUCTION PLASTIC MONITORING AND | |
| REPORTING. (a) In this section: | |
| (1) "Facility" means a facility where preproduction | |
| plastic is manufactured, processed, handled, or transported. | |
| (2) "Preproduction plastic" means pre-consumer | |
| plastic resin, consisting of organic polymers and additives, in the | |
| form of pellets, powder, flakes, or powdered additives. | |
| (b) The commission by rule shall require a person who owns | |
| or operates a facility operating under a multi-sector general | |
| permit to: | |
| (1) monitor for preproduction plastics in any | |
| receiving waters around the facility; and | |
| (2) conduct a monthly audit of any major spills of | |
| preproduction plastics at the facility. | |
| (c) The monitoring requirements required under Subsection | |
| (b) must require the person who owns or operates the facility to | |
| monitor any receiving waters for wastewater or stormwater | |
| discharges: | |
| (1) not less than once every month; and | |
| (2) not later than eight hours after each rainfall | |
| event at the facility. | |
| (d) The auditing requirements required under Subsection (b) | |
| must require the person who owns or operates the facility to: | |
| (1) check the facility for any spills of preproduction | |
| plastics; | |
| (2) identify any major spill areas that resulted in | |
| the discharge of preproduction plastics into the waters of this | |
| state; | |
| (3) determine the cause of each spill identified under | |
| Subdivision (2); | |
| (4) research methods to address each spill and any | |
| associated problems; | |
| (5) implement the most simple and effective solution; | |
| and | |
| (6) follow up each month to measure the success of | |
| solutions adopted under Subdivision (5). | |
| (e) The person who owns or operates a facility operating | |
| under a multi-sector general permit shall notify the commission by | |
| e-mail or telephone of a visible discharge of preproduction | |
| plastics not later than 24 hours after the discharge occurs. The | |
| notice must include: | |
| (1) photographs and global positioning system | |
| information of the location of all discharged or released | |
| preproduction plastic; | |
| (2) an estimate of the amount and location of | |
| discharged or released preproduction plastic; and | |
| (3) any cleanup efforts undertaken to remove | |
| preproduction plastic for proper disposal. | |
| SECTION 6. As soon as practicable after the effective date | |
| of this Act, the Texas Commission on Environmental Quality shall | |
| adopt rules necessary to implement the changes in law made by this | |
| Act. | |
| SECTION 7. This Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.