Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R11957 CS-D | ||
| By: Parker | S.B. No. 1740 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the protection of critical components of the electric | |
| grid from damage from electromagnetic threats. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subtitle B, Title 2, Utilities Code, is amended | |
| by adding Chapter 44 to read as follows: | |
| CHAPTER 44. GRID RESILIENCE | |
| Sec. 44.001. DEFINITION. In this chapter, "EMP Commission | |
| reports" means all reports released by the Commission to Assess the | |
| Threat to the United States from Electromagnetic Pulse (EMP) | |
| Attack, including the July 2017 report titled "Recommended E3 HEMP | |
| Heave Electric Field Waveform for the Critical Infrastructures." | |
| Sec. 44.002. CRITICAL COMPONENT RESILIENCE. The commission | |
| shall: | |
| (1) identify critical components of the ERCOT electric | |
| grid vulnerable to an electromagnetic pulse or a geomagnetic | |
| disturbance, such as components of substations, control centers, | |
| large power transformers, generators, high voltage breakers, or | |
| downstream equipment; | |
| (2) evaluate EMP Commission reports for potential | |
| application to critical electric grid infrastructure in ERCOT; and | |
| (3) by rule require that all high-capacity generation | |
| substations and large power transformers in ERCOT constructed or | |
| installed after September 1, 2025, be designed in accordance with | |
| applicable standards proposed in EMP Commission reports, including | |
| any applicable requirements for withstanding 50 kilovolts/meter E1 | |
| electromagnetic pulses and 85 volts/kilometer E3 electromagnetic | |
| pulses. | |
| Sec. 44.003. GRANT PROGRAM FOR UPGRADES TO CRITICAL | |
| COMPONENTS. (a) The commission shall establish a grant program for | |
| the public purpose of funding protective upgrades to critical | |
| components identified under Section 44.002(1) that are at risk of | |
| failure in the event of electromagnetic threats to ensure the | |
| components can withstand 50 kilovolts/meter E1 electromagnetic | |
| pulses and 85 volts/kilometer E3 electromagnetic pulses. | |
| (b) An entity that owns or operates a component identified | |
| by the commission under Section 44.002(1) may apply to the | |
| commission for a grant under this section. | |
| (c) An entity that receives a grant under this section may | |
| not recover under Section 38.078 costs paid by the grant. | |
| Sec. 44.004. ELECTROMAGNETIC PULSE PROTECTION AND | |
| RESILIENCE ACCOUNT. The electromagnetic pulse protection and | |
| resilience account is created as an account in the general revenue | |
| fund. The commission shall administer the account. Distributions | |
| from the account may be used only for furthering the purposes of | |
| this chapter and commission duties under this chapter. The account | |
| is composed of: | |
| (1) money the legislature appropriates to the account; | |
| and | |
| (2) gifts, grants, and other donations the commission | |
| receives for the account. | |
| Sec. 44.005. BIENNIAL REVIEW. Biennially, the commission | |
| shall: | |
| (1) conduct a review of the grant program established | |
| under Section 44.003 to evaluate the cost of the program and the | |
| benefits to the public of increased protection and resiliency of | |
| the electric grid as a result of improvements to critical | |
| components; and | |
| (2) submit a report to the legislature on the | |
| commission's findings after the review conducted under Subdivision | |
| (1). | |
| SECTION 2. Section 38.078(b), Utilities Code, as added by | |
| Chapter 836 (H.B. 2555), Acts of the 88th Legislature, Regular | |
| Session, 2023, is amended to read as follows: | |
| (b) An electric utility may file, in a manner authorized by | |
| commission rule, a plan to enhance the resiliency of the utility's | |
| transmission and distribution system through at least one of the | |
| following methods: | |
| (1) hardening electrical transmission and | |
| distribution facilities, including against electromagnetic | |
| threats; | |
| (2) modernizing electrical transmission and | |
| distribution facilities; | |
| (3) undergrounding certain electrical distribution | |
| lines; | |
| (4) lightning mitigation measures; | |
| (5) flood mitigation measures; | |
| (6) information technology; | |
| (7) cybersecurity measures; | |
| (8) physical security measures; | |
| (9) vegetation management; or | |
| (10) wildfire mitigation and response. | |
| SECTION 3. This Act takes effect September 1, 2025. |