Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| By: Darby | H.B. No. 5576 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to certain best management practices and to certain | |
| requirements for the design, construction, and operation of certain | |
| wind and solar power facilities in this state. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Title 6, Utilities Code, is amended by adding | |
| Chapter 303 to read as follows: | |
| CHAPTER 303. BEST MANAGEMENT PRACTICES FOR CERTAIN WIND AND SOLAR | |
| POWER FACILITIES | |
| SUBCHAPTER A. GENERAL PROVISIONS | |
| Sec. 303.001. APPLICABILITY. (a) This chapter applies | |
| only to a utility-scale wind or solar power facility located in this | |
| state that is not developed or operated by an electric utility as | |
| defined by Section 31.002. | |
| (b) This chapter applies to a battery energy storage | |
| facility only if it is co-located with a utility-scale wind or solar | |
| power facility located in this state. | |
| Sec. 303.002. PURPOSE. (a) This chapter encourages | |
| responsible practices by developers of utility-scale wind and solar | |
| power facilities for the design, construction, and operation of | |
| those facilities that appropriately balance the need for abundant, | |
| affordable, domestic electricity in this state, as part of a | |
| diverse portfolio of resources, with the need to conserve sensitive | |
| habitat, working lands, and wildlife; avoid undue impacts on | |
| neighboring landowners; and protect the rights of private | |
| landowners to responsibly develop their own property. The | |
| legislature recognizes that delegating subjective decision-making | |
| authority to a governmental entity or any other bureaucratic entity | |
| would substitute the judgment of government officials for that of | |
| private landowners as to the highest and best use of their private | |
| property. Such an approach is inconsistent with principles of | |
| limited government and the manner in which the development of other | |
| energy resources is regulated in this state. | |
| (b) The legislature finds that establishing, in this | |
| chapter, clear responsibilities for developers of utility-scale | |
| wind and solar power facilities will ensure responsible development | |
| and reduce undue impacts on neighboring landowners, communities, | |
| and associated wildlife habitats and populations. | |
| (c) The legislature finds that development practices for | |
| stand-alone battery energy storage facilities that are not | |
| co-located with a utility-scale wind or solar power facility | |
| present considerations that are entirely different from those | |
| presented by a utility-scale wind or solar power facility, and | |
| that, accordingly, best practices for development of stand-alone | |
| battery energy storage projects, if addressed by law, should be | |
| separately addressed. | |
| (d) This chapter: | |
| (1) ensures that appropriate project best management | |
| practices are considered when designing, constructing, and | |
| operating utility-scale wind or solar power facilities; and | |
| (2) provides appropriate practices to reduce | |
| potential impacts on adjoining landowners while protecting the | |
| rights of private landowners to develop their property in the | |
| manner that they consider appropriate. | |
| Sec. 303.003. DEFINITIONS. In this chapter: | |
| (1) "Developer" means a person or entity that | |
| possesses the legal right to develop, construct, or operate a | |
| utility-scale wind or solar power facility. | |
| (2) "Disturbance zone" includes: | |
| (A) the area within the site of a utility-scale | |
| solar power facility or a utility-scale wind power facility that is | |
| directly impacted by construction or operation of the facility; and | |
| (B) the area within the project site within 50 | |
| feet of the boundary of the directly impacted area described by | |
| Paragraph (A). | |
| (3) "Electric Reliability Council of Texas" means the | |
| independent organization certified under Section 39.151 for the | |
| ERCOT power region. | |
| (4) "ERCOT power region" means the area in Texas | |
| served by electric utilities as defined by Section 31.002, | |
| municipally owned utilities as defined by Section 11.003, and | |
| electric cooperatives as defined by Section 11.003 that is not | |
| synchronously interconnected with electric utilities outside this | |
| state. | |
| (5) "Intact native prairie" means grassland dominated | |
| by native prairie vegetation with a diversity of forbs that has | |
| never been plowed or significantly disturbed, with few or no trees. | |
| (6) "Sensitive areas" include: | |
| (A) jurisdictional waters of the United States | |
| under Section 404 of the Clean Water Act (33 U.S.C. 1344) or Section | |
| 10 of the Rivers and Harbors Act (33 U.S.C. 403); | |
| (B) areas occupied by rare, threatened, or | |
| endangered species, and critical habitats for those species; | |
| (C) intact native prairie; and | |
| (D) areas with cultural, historic, or | |
| archaeological significance. | |
| (7) "Solar power facility" means a site that includes | |
| solar energy devices used to generate electricity and the onsite | |
| roads and equipment used to construct, operate and support the | |
| facility's solar energy devices. | |
| (8) "Transmission service provider" means an electric | |
| utility as defined by Section 31.002, a municipally owned utility | |
| as defined by Section 11.003, or an electric cooperative as defined | |
| by Section 11.003 that owns or operates facilities used for the | |
| transmission of electricity. | |
| (9) "Utility-scale wind or solar power facility" means | |
| a solar power facility or wind power facility that is | |
| interconnected to a transmission service provider's system at or | |
| above 60 kilovolts (kV) and is located behind one or more unique | |
| points of interconnection. | |
| (10) "Wind power facility" means a site that includes | |
| wind turbine generators used to generate electricity and the onsite | |
| roads and equipment used to construct, operate and support the | |
| facility's wind turbine generators. | |
| Sec. 303.004. PERMIT NOT REQUIRED. It is the policy of this | |
| state that no state or local entity or grid operator shall be | |
| allowed to require a permit to: | |
| (1) construct or operate a utility-scale wind or solar | |
| power facility; or | |
| (2) interconnect a utility-scale wind or solar power | |
| facility with a transmission service provider. | |
| SUBCHAPTER B. COMMUNITY AND GOOD NEIGHBOR BEST PRACTICES | |
| Sec. 303.051. PURPOSE OF BEST MANAGEMENT PRACTICES UNDER | |
| THIS SUBCHAPTER. This subchapter is designed to inform nearby | |
| landowners and communities about a proposed utility-scale wind or | |
| solar power facility and minimize the project's impact on adjoining | |
| landowners. | |
| Sec. 303.052. DISCLOSURE OF CERTAIN INFORMATION. This | |
| subchapter does not require the disclosure of: | |
| (1) proprietary or otherwise sensitive business | |
| information; | |
| (2) information protected from disclosure under other | |
| state or federal law or regulation; or | |
| (3) specific engineering, vulnerability, or detailed | |
| design information about proposed or existing critical | |
| infrastructure, whether physical or virtual, that: | |
| (A) relates details about the production, | |
| generation, transmission, or distribution of energy; | |
| (B) could be useful to a person planning an | |
| attack on critical infrastructure; or | |
| (C) gives strategic information beyond the | |
| location of the critical infrastructure. | |
| Sec. 303.053. PROJECT WEBSITE. The developer of a | |
| utility-scale wind or solar power facility must maintain a project | |
| website available to the public and published not later than 30 days | |
| after execution of a signed interconnection agreement. The website | |
| must include, as available: | |
| (1) the name of the facility; | |
| (2) the developer for the facility; | |
| (3) technologies operating at the site of the facility | |
| as defined in the interconnection agreement; | |
| (4) expected installed capacity of the facility, | |
| expressed in megawatts, and contextual information including how | |
| many homes can be powered by the energy that the facility is | |
| expected to generate; | |
| (5) the cities, unincorporated areas, and counties in | |
| which the utility-scale solar or wind power facility is located; | |
| (6) the estimated project timeline; | |
| (7) projected community benefits of the construction | |
| and operation of the facility; and | |
| (8) business contact information for relevant members | |
| of the project team in charge of matters including project | |
| development and community engagement. | |
| Sec. 303.054. REQUIRED SIGNAGE. The developer of a | |
| utility-scale wind or solar power facility shall post signs at | |
| designated entry and exit points of the facility that can be easily | |
| read from outside the facility that include the name of the | |
| facility, the name of the developer, and an emergency contact | |
| number. The signs must be posted before construction and | |
| maintained for the duration of the operation of the facility. | |
| Sec. 303.055. LIGHTING REQUIREMENTS. To minimize the | |
| impact of lights during construction and operations, utility-scale | |
| wind and solar power facilities must implement the following | |
| measures to the extent allowed by law: | |
| (1) service and security lighting must be directed | |
| downward and shielded; | |
| (2) service lighting must be manual and used only as | |
| needed to conduct nighttime repairs; | |
| (3) security lighting must be motion-activated unless | |
| otherwise required for physical security of the facility as | |
| required under federal or state law or regulation or applicable | |
| national standards; and | |
| (4) all service and security lighting shall be located | |
| to avoid known nesting sites of federal or state-listed threatened | |
| or endangered bird species identified during the on-site | |
| reconnaissance survey. | |
| Sec. 303.056. WIND TURBINE LIGHT POLLUTION MITIGATION. (a) | |
| This section applies only to a utility-scale wind power facility | |
| that: | |
| (1) is required by the Federal Aviation Administration | |
| to use aviation obstruction lighting; and | |
| (2) sells at wholesale electric energy produced by a | |
| wind turbine generator. | |
| (b) The Public Utility Commission of Texas by rule shall | |
| require the developer to apply to the Federal Aviation | |
| Administration, or another applicable federal entity, for | |
| authorization to install and operate technology to mitigate light | |
| pollution from the wind turbine generator using a light mitigation | |
| technology system. | |
| (c) The rules adopted under Subsection (b) must require a | |
| developer that: | |
| (1) installs a wind turbine generator on or after | |
| December 31, 2026, to: | |
| (A) submit an application for approval of light | |
| mitigation technology to the Federal Aviation Administration or | |
| other applicable federal entity not later than 180 days before the | |
| commercial operations date for the wind turbine generator; | |
| (B) install light mitigation technology on all | |
| wind turbine generators not later than 18 months after receiving | |
| approval of the technology from the Federal Aviation Administration | |
| or other applicable federal entity, unless: | |
| (i) the governing body of the city or county | |
| in which the utility-scale wind power facility is or will be located | |
| has adopted a formal resolution opposing the installation of a | |
| light mitigation technology system; or | |
| (ii) the Federal Aviation Administration, | |
| the United States Department of Defense, or other applicable | |
| federal entity approves the use of light mitigation technology for | |
| thirty percent or less of the proposed wind turbines within a | |
| utility-scale wind power generation facility; and | |
| (C) if installation of the light mitigation | |
| technology is delayed due to forces outside of the control of the | |
| developer, make a quarterly report to the Public Utility Commission | |
| of Texas detailing the reasons for the delay; and | |
| (2) installs a wind turbine generator before December | |
| 31, 2026, to: | |
| (A) on repowering, or not later than the 180th | |
| day after the execution of a newly signed long-term power purchase | |
| agreement with a term of 10 years or more, submit an application for | |
| approval of light mitigation technology to the Federal Aviation | |
| Administration or other applicable federal entity; | |
| (B) install light mitigation technology on all | |
| wind turbine generators to which this subdivision applies not later | |
| than 18 months after receiving approval of the technology from the | |
| Federal Aviation Administration or other applicable federal | |
| entity, unless: | |
| (i) the governing body of the city or county | |
| in which the utility-scale wind power facility is or will be located | |
| has adopted a formal resolution opposing the installation of a | |
| light mitigation technology system; or | |
| (ii) the Federal Aviation Administration, | |
| the United States Department of Defense, or other applicable | |
| federal entity approves the use of light mitigation technology for | |
| thirty percent or less of the proposed wind turbines within a | |
| utility-scale wind power generation facility; and | |
| (C) if installation of the light mitigation | |
| technology is delayed due to forces outside of the control of the | |
| developer, make a quarterly report to the Public Utility Commission | |
| of Texas detailing the reasons for the delay. | |
| (d) Subsection (c)(2) applies only to a wind turbine | |
| generator with a commercial operations date that occurred after | |
| December 31, 2008. | |
| (e) The Public Utility Commission of Texas may assess an | |
| administrative penalty against a developer that violates this | |
| section for reasons that were within its control. The total amount | |
| of the administrative penalty assessed for the violation, including | |
| a violation that continues or occurs on separate days, may not | |
| exceed $1 million. | |
| SUBCHAPTER C. FOUNDATIONAL BEST MANAGEMENT PRACTICES | |
| Sec. 303.101. REQUIRED PROVISION IN FACILITY CONSTRUCTION | |
| CONTRACTS. (a) A contract for the construction of a utility-scale | |
| wind or solar power facility must require the contractor and any | |
| subcontractors to follow any applicable: | |
| (1) requirements of this subchapter; and | |
| (2) best management practices identified in this | |
| subchapter in the manner specified by this subchapter. | |
| (b) A provision of a utility-scale wind or solar power | |
| facility construction contract that exempts a contractor or | |
| subcontractor from a duty established by this chapter is void. | |
| Sec. 303.102. BEST DESIGN PRACTICES. (a) The overall | |
| design, construction and operation of a utility-scale wind or solar | |
| power facility should seek to efficiently achieve the facility's | |
| intended capacity and safe operation while minimizing the impact of | |
| the facility on land and avoiding or minimizing the impact of the | |
| facility on natural resources. | |
| (b) Developers should attempt to: | |
| (1) use existing trails and roads, provided they are | |
| suitable for construction operations; | |
| (2) avoid unnecessary access roads; and | |
| (3) avoid unnecessary staging areas. | |
| (c) Developers should avoid developing utility-scale solar | |
| power facilities on slopes with a grade of fifteen percent or more, | |
| where possible, and additional stormwater management features | |
| should be in place for steeper grades. | |
| (d) The utility-scale wind or solar power facility siting | |
| process should avoid or minimize: | |
| (1) impacts to wetlands, streams and watercourses; | |
| (2) the removal of native mature trees that have not | |
| been planted for harvest; and | |
| (3) impact to intact native prairie. | |
| Sec. 303.103. BEST PRACTICES BEFORE CONSTRUCTION: SOLAR | |
| POWER FACILITY. (a) Before starting construction of a | |
| utility-scale solar power facility, the developer must develop a | |
| vegetation and soil management plan. The plan must describe short | |
| and long-term vegetation and soil management practices to maintain | |
| native, naturalized, or non-invasive perennial vegetation. | |
| (b) The project plan must show where suitable features have | |
| been identified and designated for the appropriate maintenance | |
| regimes. Project plans must clearly delineate sensitive areas, if | |
| present, and project boundaries and direct contractors and | |
| subcontractors to avoid encroaching outside of areas of temporary | |
| disturbance during construction. | |
| (c) The project plan must also include the following | |
| sections: | |
| (1) an inventory of current land use, existing | |
| vegetation types and soils; | |
| (2) goals and objectives; | |
| (3) conservation practices; | |
| (4) site-specific planning; and | |
| (5) implementation and maintenance. | |
| (d) Before starting construction, the developer must ensure | |
| that topsoil is clearly delineated in the disturbance zone on the | |
| project site. | |
| SUBCHAPTER D. ATTESTATION OF COMPLIANCE | |
| Sec. 303.151. REQUIRED ATTESTATION. (a) Prior to | |
| interconnecting, an authorized representative of the developer of a | |
| utility-scale wind or solar facility shall file as specified in | |
| this section a signed attestation that: | |
| (1) the developer has complied with all applicable | |
| requirements of this chapter in the construction of the facility; | |
| and | |
| (2) all federal or state environmental permits | |
| required for the construction and operation of the facility have | |
| been applied for or received by the developer. | |
| (b) The attestation must meet the requirements of this | |
| subchapter and be signed by a representative of the facility | |
| authorized to bind the developer. | |
| (c) The attestation must include the following required | |
| information: | |
| (1) the name of the facility and project legal entity; | |
| (2) the name and contact information for the | |
| developer, including address, email, and phone number; | |
| (3) the facility's street address or another | |
| description of the facility location that can easily be determined | |
| on a map, the location of the project by latitude and longitude, and | |
| the city or county in which the facility is located; | |
| (4) a link to the project website required under | |
| Section 303.103; and | |
| (5) a brief description of the facility. | |
| (d) The developer of the facility shall submit the | |
| attestation to: | |
| (1) the Electric Reliability Council of Texas, if the | |
| facility is located in the ERCOT power region; or | |
| (2) the Public Utility Commission of Texas, if the | |
| facility is not located in the ERCOT power region. | |
| (e) The requirements of this subchapter apply: | |
| (1) to a utility-scale wind or solar power facility | |
| located in the ERCOT power region that enters into a Standard | |
| Generation Interconnection Agreement with a transmission service | |
| provider on or after January 1, 2028; and | |
| (2) to a utility-scale wind or solar power facility | |
| that is not required to enter into a Standard Generation | |
| Interconnection Agreement with a transmission service provider | |
| before beginning commercial operations that begins commercial | |
| operations on or after January 1, 2031. | |
| (f) The requirements of this subchapter do not apply solely | |
| because a Standard Generation Interconnection Agreement for an | |
| existing facility is amended. | |
| SECTION 2. (a) An interim study committee is established | |
| consisting of an academic expert with expertise that includes | |
| locating utility-scale wind and solar power facilities, appointed | |
| by the governor, and the chairs of the House Committee on Culture, | |
| Recreation, and Tourism, the House Committee on State Affairs, the | |
| Senate Committee on Natural Resources, and the Senate Committee on | |
| Business and Commerce. | |
| (b) Not later than December 15, 2026, the interim study | |
| committee shall make written recommendations to the legislature | |
| regarding an appropriate distance from a state or national park or | |
| federally designated wild or scenic river at which a proposed | |
| utility-scale wind or solar power facility that the developer of | |
| the facility should be required to consult with the Parks and | |
| Wildlife Department regarding voluntary measures the developer | |
| should consider to minimize the proposed facility's impact on those | |
| areas without unduly impeding the development of this state's | |
| energy resources or restricting the private property rights of | |
| landowners in this state. | |
| SECTION 3. This Act takes effect September 1, 2025. |