Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R8612 JXC-D | ||
| By: Anchía | H.B. No. 4091 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the interconnection of the ERCOT power grid to grids | |
| outside the ERCOT power region. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 31.002(5), Utilities Code, is amended to | |
| read as follows: | |
| (5) "Electric Reliability Council of Texas" or "ERCOT" | |
| means: | |
| (A) the area in Texas served by electric | |
| utilities, municipally owned utilities, and electric cooperatives | |
| that is not synchronously interconnected with electric utilities | |
| outside the state; or | |
| (B) if the commission approves a synchronous | |
| interconnection under Chapter 39A, an area designated by the | |
| commission by rule as necessary to administer this subtitle. | |
| SECTION 2. Subtitle B, Title 2, Utilities Code, is amended | |
| by adding Chapter 39A to read as follows: | |
| CHAPTER 39A. INTERCONNECTION OF FACILITIES IN ERCOT TO GRIDS | |
| OUTSIDE ERCOT POWER REGION | |
| Sec. 39A.0101. UTILITY AND COOPERATIVE AUTHORITY. | |
| Notwithstanding any other law, a transmission and distribution | |
| utility, municipally owned utility, or electric cooperative that | |
| transmits or distributes power purchased at wholesale in the ERCOT | |
| power region may construct, own, and operate facilities as | |
| necessary to: | |
| (1) interconnect transmission facilities inside the | |
| ERCOT power region to transmission facilities outside of the ERCOT | |
| power region; and | |
| (2) purchase power at wholesale from outside of the | |
| ERCOT power region. | |
| Sec. 39A.0102. SALE AUTHORITY. Notwithstanding any other | |
| law, an electric utility, electric cooperative, municipally owned | |
| utility, or power generation company operating in this state may | |
| sell electric energy at wholesale for retail sale inside or outside | |
| the ERCOT power region for the purposes of this chapter. | |
| Sec. 39A.0103. COMMISSION AUTHORITY. (a) The commission | |
| may request any federal approval necessary for the synchronous or | |
| nonsynchronous interconnection of a facility described by Section | |
| 39A.0101. | |
| (b) The commission may require the independent organization | |
| certified for the ERCOT power region under Section 39.151 to | |
| approve the synchronous or nonsynchronous interconnection of a | |
| facility described by Section 39A.0101 unless otherwise provided by | |
| federal law or the commission or the independent organization | |
| determines that the interconnection poses a significant and | |
| imminent risk to public health and safety. | |
| (c) The commission may provide technical and administrative | |
| assistance to a transmission and distribution utility, municipally | |
| owned utility, or electric cooperative seeking to construct, own, | |
| or operate a facility described by Section 39A.0101. | |
| (d) The commission shall implement, and shall provide to the | |
| Federal Energy Regulatory Commission, the Electric Reliability | |
| Organization as defined by 16 U.S.C. Section 824o, and the | |
| independent organization certified under Section 39.151 for the | |
| ERCOT power region any assistance necessary to implement, a | |
| reliability standard for the purposes of this chapter that requires | |
| minimum total transfer capabilities between the ERCOT power region | |
| and other regions as follows: | |
| (1) 4.3 gigawatts between the area under functional | |
| control of the independent organization and the area under | |
| functional control of the Southwest Power Pool; | |
| (2) 2.5 gigawatts between the area under functional | |
| control of the independent organization and the area under | |
| functional control of Midcontinent Independent System Operator; | |
| and | |
| (3) 2.6 gigawatts between the area under functional | |
| control of the independent organization and the Western | |
| Interconnection. | |
| (e) The commission shall designate one or more entities | |
| described by Section 39A.0101 to site and construct new | |
| transmission facilities or modify existing transmission facilities | |
| to achieve the minimum total transfer capabilities described by | |
| Subsection (d) or delegate authority to the independent | |
| organization certified under Section 39.151 for the ERCOT power | |
| region to designate the entities. | |
| (f) Notwithstanding any other law, the commission may | |
| require an entity designated under Subsection (e) to make requests, | |
| obtain approvals, enter into contracts, and construct or modify | |
| facilities as necessary to interconnect a transmission facility | |
| with a facility outside of ERCOT. | |
| SECTION 3. Sections 37.051(c-1), (c-2), and (c-3), | |
| Utilities Code, are redesignated as Section 39A.0104, Utilities | |
| Code, and amended to read as follows: | |
| Sec. 39A.0104. CERTIFICATES OF CONVENIENCE AND NECESSITY. | |
| (a) A transmission and distribution utility, [ |
|
| electric cooperative may not interconnect a facility to the ERCOT | |
| transmission grid that enables additional power to be imported into | |
| or exported out of the ERCOT power grid unless the utility or | |
| cooperative [ |
|
| the manner provided by Chapter 37 and this chapter stating that the | |
| interconnection does not pose a significant and imminent risk to | |
| public health and safety [ |
|
| (b) In the case of a conflict between Chapter 37 and this | |
| chapter, this chapter prevails. | |
| (c) Sections 37.056(c)(1) and (2) and (d) do not apply to an | |
| application for a certificate described by Subsection (a). | |
| (d) The commission may approve an application for a | |
| certificate described by Subsection (a) unless otherwise provided | |
| by federal law or the commission determines that granting the | |
| application poses a significant and imminent risk to public health | |
| and safety. | |
| (e) The transmission and distribution utility, municipally | |
| owned utility, or electric cooperative [ |
|
| commission for a [ |
|
| later than the 180th day before the date the utility or cooperative | |
| [ |
|
| Commission related to the interconnection. | |
| (f) [ |
|
| [ |
|
| the date the application is filed, shall approve an application | |
| [ |
|
| constructed under an interconnection agreement appended to an offer | |
| of settlement approved in a final order of the Federal Energy | |
| Regulatory Commission that was issued in Docket No. TX11-01-001 on | |
| or before December 31, 2014, directing physical connection between | |
| the ERCOT and SERC regions under Sections 210, 211, and 212 of the | |
| Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In | |
| approving the application, the commission may prescribe reasonable | |
| conditions to protect the public interest that are consistent with | |
| the final order of the Federal Energy Regulatory Commission. | |
| (g) [ |
|
| the independent organization certified under Section 39.151 for the | |
| ERCOT power region to adopt rules or protocols of general | |
| applicability. | |
| SECTION 4. This Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.