89R24081 CS-D

By: Louderback, Darby, Garcia of Bexar,

H.B. No. 3778

Substitute the following for H.B. No. 3778:

By: King

C.S.H.B. No. 3778

Lalani

A BILL TO BE ENTITLED

65 unchanged paragraphs

AN ACT

relating to the use of geothermal energy as a dispatchable

generation resource.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter A, Chapter 34, Utilities Code, is

amended by adding Section 34.01015 to read as follows:

Sec. 34.01015. APPLICABILITY. For the purposes of this

chapter:

(1) a generating facility is considered to be

dispatchable if the facility's output can be controlled primarily

by forces under human control; and

(2) a geothermal energy generation facility is

considered to be dispatchable.

SECTION 2. Section 34.0104, Utilities Code, is amended by

amending Subsection (a) and adding Subsection (a-1) to read as

follows:

(a) The commission may use money in the fund without further

appropriation to provide loans to finance upgrades to existing

dispatchable electric generating facilities providing power for

the ERCOT power region that result in a net increase of at least 100

megawatts of capacity for each facility or the construction of

dispatchable electric generating facilities providing power for

the ERCOT power region that each have a generation capacity of at

least 100 megawatts. [ For the purposes of this section, a

generating facility is considered to be dispatchable if the

facility's output can be controlled primarily by forces under human

control. ] An electric energy storage facility , other than a

geothermal energy conservation well, is not eligible for a loan

under this section.

(a-1) Notwithstanding Subsections (a) and (b)(1), the

commission may use money in the fund, without further

appropriation, to provide loans to finance the construction of

geothermal energy generation facilities and geothermal energy

conservation wells in the ERCOT power region that have a generation

capacity of at least 10 megawatts.

SECTION 3. Sections 34.0105(a) and (c), Utilities Code, are

amended to read as follows:

(a) The commission shall provide, using money available in

the fund for the purpose without further appropriation, a

completion bonus grant for the construction of dispatchable

electric generating facilities in the ERCOT power region. [ For the

purposes of this section, a generating facility is considered to be

dispatchable if the facility's output can be controlled primarily

by forces under human control. ] An electric energy storage

facility , other than a geothermal energy conservation well, is not

eligible for a grant under this section.

(c) The commission may provide a grant under this section

only for construction of a facility that:

(1) will have a generation capacity of at least 100

megawatts or at least 10 megawatts for a geothermal energy

generation facility or geothermal energy conservation well ; and

(2) does not meet the planning model requirements

necessary to be included in the Capacity Demand and Reserves Report

of the independent organization certified under Section 39.151 for

the ERCOT power region before June 1, 2023.

SECTION 4. Section 39.159(a), Utilities Code, is amended to

read as follows:

(a) For the purposes of this section :

(1) [ , ] a generation facility is considered to be

dispatchable if the facility's output can be controlled primarily

by forces under human control; and

(2) a geothermal energy generation facility and a

geothermal energy conservation well are considered to be

dispatchable [ non-dispatchable if the facility's output is

controlled primarily by forces outside of human control ].

SECTION 5. This Act takes effect September 1, 2025.