Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HB 3356Session 89R

What changed between versions

59 paragraphs changed+371 words added−84 removed

Highlighted text was added in the newer version. Struck-through text was removed.

89R445789R23752 SCR-D

By: Patterson, McLaughlin, Leo Wilson,

H.B. No. 3356

et al.

Substitute the following for H.B. No. 3356:

By: Geren

C.S.H.B. No. 3356

A BILL TO BE ENTITLED

AN ACT

relating to the applicability of certain generation reliability

requirements.

relating to reliability requirements for certain electric

generation facilities.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. SectionSections 39.1592(a) and (d), Utilities Code, is amendedare

amended to read as follows:

(a) This section applies only to an electric generation

3 unchanged paragraphs

facility in the ERCOT power region that is subject to [ for which ] a

standard generator interconnection agreement , [ is signed on or

after January 1, 2027, that ] has been in operation for at least one

year, and [ that ] is not a self-generator.

SECTION 2. (a) Sections 52(b) and (c), Chapter 410 (H.B.

1500), Acts of the 88th Legislature, Regular Session, 2023, are

repealed.

(bd) NotwithstandingThe theindependent deadlineorganization providedcertified byunder Section

39.1592(b), Utilities Code, an owner or operator of an electric

generation facility to which Section 39.1592(b), Utilities Code,

applies shall make the first demonstration required by Section

39.1592(b), Utilities Code, not later than January 1, 2027.

39.151 for the ERCOT power region may not impose penalties under

Subsection (c):

(1) for resource unavailability due to planned

maintenance outages or transmission outages;

(2) on resources that are already subject to

performance obligations during the highest reliability risk hours

under the day-ahead market rules or other ancillary or reliability

services established by the commission or the independent

organization; [ or ]

(3) on resources that demonstrate the ability to

operate when called upon for dispatch for 24 continuous hours at or

above the seasonal average generation capability through the

resource's own generation capability or through a contract with an

on-site or off-site resource, including a battery energy storage

resource; or

(4) on resources with dual but separate grid

interconnections that provide dispatchable generation to the ERCOT

power region [ during hours outside a baseline established by the

commission that includes morning and evening ramping periods ].

SECTION 2. (a) The Public Utility Commission of Texas shall

consider the use of a settlement price cap, a fixed reliability fee,

and other methods of imposing penalties under Section

39.1592(c)(1), Utilities Code. The Public Utility Commission of

Texas and the independent organization certified under Section

39.151, Utilities Code, for the ERCOT power region shall:

(1) consider rebating penalties collected under

Section 39.1592 directly to consumers or redirecting a portion of

the collected penalties toward reliability incentives; and

(2) for the purposes of Subdivision (1) of this

subsection, prioritize rebates of penalties or redirection of

penalties in a manner the commission determines will provide the

maximum financial benefit to consumers while still ensuring that

the reliability needs of the ERCOT power region are met.

(b) Notwithstanding Section 39.1592(c), Utilities Code, the

Public Utility Commission of Texas may allow the financial

penalties and incentives required by that subsection to be adopted

in a phased manner over multiple years to mitigate market

disruptions that the commission determines would result in net

increased costs to consumers.

SECTION 3. This Act takes effect September 1, 2025.

Back to the full text