89R21090 ANG-D
By: King
H.B. No. 106
Substitute the following for H.B. No. 106:
By: Guillen
C.S.H.B. No. 106
A BILL TO BE ENTITLED
13 unchanged paragraphs
AN ACT
relating to the maintenance of overhead electrical power lines
associated with oil and gas development and production; authorizing
an administrative penalty.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. Subchapter B, Chapter 91, Natural Resources
Code, is amended by adding Section 91.0195 to read as follows:
Sec. 91.0195. MAINTENANCE OF OVERHEAD ELECTRICAL POWER
LINES. (a) An operator of a well drilled for oil or gas shall
maintain in accordance with rules adopted by the commission an
overhead electrical distribution system line that is owned or
controlled by the operator and associated with operations incident
to oil and gas development and production.
(b) If the commission determines that an operator has
violated a rule adopted under this section, theon commissionland shallincluded in an
oil and gas lease or connected to an oil and gas lease, the
commission shall assess a penalty against the operator in the manner provided by
manner provided by Sections 81.0532 through 81.0534 for assessing an administrative
an administrative penalty under Section 81.0531.
SECTION 2. This Act takes effect September 1, 2025.
(c) A penalty collected under this section shall be
deposited to the credit of the oil and gas regulation and cleanup
fund as provided by Section 81.067.
SECTION 2. Section 81.067(c), Natural Resources Code, is
amended to read as follows:
(c) The fund consists of:
(1) proceeds from bonds and other financial security
required by this chapter and benefits under well-specific plugging
insurance policies described by Section 91.104(c) that are paid to
the state as contingent beneficiary of the policies, subject to the
refund provisions of Section 91.1091, if applicable;
(2) private contributions, including contributions
made under Section 89.084;
(3) expenses collected under Section 89.083;
(4) fees imposed under Section 85.2021;
(5) costs recovered under Section 91.457 or 91.459;
(6) proceeds collected under Sections 89.085 and
91.115;
(7) interest earned on the funds deposited in the
fund;
(8) oil and gas waste hauler permit application fees
collected under Section 29.015, Water Code;
(9) costs recovered under Section 91.113(f);
(10) hazardous oil and gas waste generation fees
collected under Section 91.605;
(11) oil-field cleanup regulatory fees on oil
collected under Section 81.116;
(12) oil-field cleanup regulatory fees on gas
collected under Section 81.117;
(13) fees for a reissued certificate collected under
Section 91.707;
(14) fees collected under Section 91.1013;
(15) fees collected under Section 89.088;
(16) fees collected under Section 91.142;
(17) fees collected under Section 91.654;
(18) costs recovered under Sections 91.656 and 91.657;
(19) fees collected under Section 81.0521;
(20) fees collected under Sections 89.024 and 89.026;
(21) legislative appropriations;
(22) any surcharges collected under Section 81.070;
(23) fees collected under Section 91.0115;
(24) fees collected under Subchapter E, Chapter 121,
Utilities Code;
(25) fees collected under Section 27.0321, Water Code;
(26) fees collected under Section 81.071; [ and ]
(27) money collected under Section 81.021 ; and
(28) money collected under Section 91.0195 .
SECTION 3. This Act takes effect September 1, 2025.