Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89S20241 CXP-F | ||
| By: Metcalf | H.B. No. 165 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the management and removal of vegetation and debris by | |
| certain electric utilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Chapter 38, Utilities Code, is amended by adding | |
| Subchapter G to read as follows: | |
| SUBCHAPTER G. VEGETATION MANAGEMENT AND DEBRIS REMOVAL | |
| Sec. 38.251. DEFINITIONS. In this subchapter: | |
| (1) "First tier coastal county" has the meaning | |
| assigned by Section 2210.003, Insurance Code. | |
| (2) "Vegetation management" includes the trimming, | |
| removal, relocation, or prevention of growth of trees, shrubs, or | |
| other vegetation located inside or outside of a right-of-way or an | |
| easement. | |
| Sec. 38.252. EMERGENCY OPERATIONS PLAN REQUIREMENTS. An | |
| electric utility that serves a portion of a first tier coastal | |
| county or that is determined by the commission to serve an area of | |
| this state with high flood risk shall include in the utility's | |
| emergency operations plan: | |
| (1) a vegetation management plan for the utility's | |
| transmission and distribution system; and | |
| (2) processes for the removal of debris from a | |
| right-of-way or easement used by the utility after a natural | |
| disaster. | |
| Sec. 38.253. VEGETATION MANAGEMENT PLAN. (a) A vegetation | |
| management plan required by Section 38.252(1) must: | |
| (1) explain the processes for implementing the plan; | |
| (2) detail the number of miles expected to be trimmed | |
| on the electric utility's transmission and distribution system; and | |
| (3) include the estimated costs of implementing the | |
| plan by year. | |
| (b) The commission shall review a vegetation management | |
| plan required by Section 38.252(1) and issue an order to approve, | |
| modify, or deny the plan not later than the 180th day after the date | |
| the plan is filed with the commission. The commission may approve | |
| the plan only if the commission determines that approving the plan | |
| is in the public interest. | |
| (c) A proceeding under this section is not a rate proceeding | |
| under Chapter 36. | |
| (d) An electric utility may conduct vegetation management | |
| that exceeds the amount of vegetation management authorized in the | |
| utility's approved vegetation management plan and request recovery | |
| of those excess vegetation management costs under Section | |
| 38.254(b). | |
| Sec. 38.254. VEGETATION MANAGEMENT PLAN COST RECOVERY. (a) | |
| An electric utility may recover vegetation management plan costs | |
| for the utility's distribution system through a vegetation | |
| management cost recovery factor if reviewed and approved in the | |
| plan proceeding under Section 38.253. For purposes of the | |
| vegetation management cost recovery factor, the electric utility | |
| shall: | |
| (1) establish the distribution system vegetation | |
| management plan costs the utility seeks to collect in the proposed | |
| factor; | |
| (2) ensure that distribution system vegetation | |
| management plan costs that are being recovered through the | |
| utility's approved base rates are not included in the proposed | |
| factor; | |
| (3) propose an allocation of distribution system | |
| vegetation management costs among rate classes consistent with the | |
| manner in which costs of that kind were allocated in accordance with | |
| the utility's most recent comprehensive base rate proceeding; and | |
| (4) exclude any costs for distribution system | |
| vegetation management included in a resiliency plan approved by the | |
| commission under Section 38.079. | |
| (b) An electric utility shall annually submit for the | |
| commission's approval a proposed adjustment to the utility's | |
| vegetation management cost recovery factor. The proposed | |
| adjustment must: | |
| (1) reflect any increase or decrease in projected | |
| estimated annual costs that were included in an approved vegetation | |
| management plan or previous distribution system vegetation | |
| management cost recovery factor; | |
| (2) reflect any over-collected or under-collected | |
| actual costs from the preceding year, including carrying costs at | |
| the weighted average cost of capital approved by the commission in | |
| the electric utility's most recent comprehensive base rate | |
| proceeding; | |
| (3) be accompanied by a report that summarizes the | |
| utility's actual distribution system vegetation management costs | |
| for the preceding year; and | |
| (4) exclude any costs for distribution system | |
| vegetation management included in a resiliency plan approved by the | |
| commission under Section 38.079. | |
| (c) The commission may not hold a hearing on the adjustment | |
| of a vegetation management cost recovery factor under Subsection | |
| (b). The commission shall review an electric utility's actual | |
| distribution system vegetation management costs for the preceding | |
| year to determine the appropriate adjustment. An interested party, | |
| including the office, may provide to the commission comments on | |
| whether the factor reasonably reflects the annual costs associated | |
| with the electric utility's distribution system vegetation | |
| management plan and any over-collected or under-collected amounts | |
| from the preceding year. | |
| (d) The commission shall issue an order on a proposed | |
| adjustment of a vegetation management cost recovery factor under | |
| Subsection (b) not later than the 90th day after the date the | |
| proposed adjustment is filed with the commission. | |
| (e) An electric utility may defer for future recovery as a | |
| regulatory asset all or a portion of the vegetation management plan | |
| costs for the utility's transmission system that are not being | |
| recovered through the utility's approved base rates, including | |
| carrying costs at the utility's weighted average cost of capital | |
| established in the commission's final order in the utility's most | |
| recent base rate proceeding, and use commission-authorized cost | |
| recovery alternatives or another general rate proceeding. | |
| (f) A proceeding under this section is not a rate proceeding | |
| under Chapter 36. | |
| Sec. 38.255. RECOVERY OF CERTAIN DEBRIS REMOVAL COSTS. An | |
| electric utility described by Section 38.252 that incurs costs to | |
| remove debris caused by a natural disaster may defer all or a | |
| portion of the costs that are not being recovered through the | |
| utility's approved base rates for future recovery as a regulatory | |
| asset, including carrying costs at the utility's weighted average | |
| cost of capital established in the commission's final order in the | |
| utility's most recent base rate proceeding and use | |
| commission-authorized cost recovery alternatives or another | |
| general rate proceeding. | |
| SECTION 2. This Act takes effect on the 91st day after the | |
| last day of the legislative session. |