Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R2217 JDK-F | ||
| By: Johnson | S.B. No. 729 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the operation of rock crushing facilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 382.05101, Health and Safety Code, is | |
| amended to read as follows: | |
| Sec. 382.05101. DE MINIMIS AIR CONTAMINANTS. The | |
| commission may develop by rule the criteria to establish a de | |
| minimis level of air contaminants for facilities or groups of | |
| facilities below which the following types of permits are not | |
| required: | |
| (1) a permit under Section 382.0518 or 382.0519; | |
| (2) a standard permit under Section 382.05195, | |
| 382.05198, [ |
|
| (3) a permit by rule under Section 382.05196. | |
| SECTION 2. Section 382.0511(c), Health and Safety Code, is | |
| amended to read as follows: | |
| (c) The commission may authorize changes in a federal source | |
| to proceed before the owner or operator obtains a federal operating | |
| permit or revisions to a federal operating permit if: | |
| (1) the changes are de minimis under Section | |
| 382.05101; or | |
| (2) the owner or operator: | |
| (A) has obtained a preconstruction permit or | |
| permit amendment required by Section 382.0518; or | |
| (B) is operating under: | |
| (i) a standard permit under Section | |
| 382.05195, 382.05198, [ |
|
| (ii) a permit by rule under Section | |
| 382.05196; or | |
| (iii) an exemption allowed under Section | |
| 382.057. | |
| SECTION 3. Subchapter C, Chapter 382, Health and Safety | |
| Code, is amended by adding Sections 382.0651, 382.0652, and | |
| 382.0653 to read as follows: | |
| Sec. 382.0651. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING | |
| FACILITIES. (a) The commission shall issue a standard permit for a | |
| rock crushing facility that: | |
| (1) is located at an aggregate production operation | |
| required to be registered under Section 28A.051, Water Code; | |
| (2) processes not more than 1,500 tons of rock per | |
| hour; and | |
| (3) meets the requirements of this section. | |
| (b) The standard permit issued under this section must | |
| require that an owner or operator of a facility authorized to use | |
| the permit, in addition to any other applicable requirements of | |
| this chapter: | |
| (1) install and operate for the first 12 consecutive | |
| months of operation under the standard permit equipment to monitor: | |
| (A) water quality in mining pits and | |
| sedimentation ponds at the aggregate production operation for the | |
| presence of contaminants related to aggregate extraction; | |
| (B) the seismicity of extraction activities, | |
| including blasting along active extraction areas; and | |
| (C) emissions of air contaminants, if the | |
| facility is located within 440 yards of two or more other aggregate | |
| production operations; | |
| (2) maintain records of monitoring data from the | |
| monitoring equipment required by Subdivision (1) until the second | |
| anniversary of the date on which the data was collected; | |
| (3) establish a plan for providing notice of | |
| emergencies to: | |
| (A) owners and tenants of adjacent real property | |
| and the property owners' association of each adjacent residential | |
| subdivision, as applicable; and | |
| (B) each member of the board of trustees of a | |
| school district that serves the geographic area in which the | |
| facility is located; | |
| (4) implement best management practices for: | |
| (A) conserving water; | |
| (B) minimizing visible dust from active | |
| extraction areas at the aggregate production operation, including | |
| those areas not immediately revegetated; | |
| (C) removing noncommercial material and old and | |
| unused extraction equipment from the facility site; and | |
| (D) cleaning and mowing of on-site equipment | |
| yards; and | |
| (5) submit to the commission a post-extraction land | |
| use plan that includes: | |
| (A) provisions for permanent removal of | |
| extraction equipment; | |
| (B) provisions for revegetation, including the | |
| use of appropriate local vegetation types that are adequate for | |
| post-extraction uses of land, as determined by the owner or | |
| operator; | |
| (C) slope and grading standards to allow for | |
| traversing of livestock; and | |
| (D) proposed land reuse options, such as | |
| agricultural, natural, open space, or redevelopment uses or the | |
| creation of a pond or lake. | |
| (c) The commission by rule shall adopt best management | |
| practices for the purposes of Subsection (b)(4). Before the | |
| commission proposes a rule under this subsection, the commission | |
| must use negotiated rulemaking procedures under Chapter 2008, | |
| Government Code. | |
| (d) The commission shall make each post-extraction land use | |
| plan submitted under Subsection (b)(5) available on the | |
| commission's Internet website. | |
| (e) If the land on which the facility to be permitted is | |
| located is owned by a person other than the owner or operator of the | |
| facility, the owner or operator of the facility may submit to the | |
| commission an agreement made between the landowner and the facility | |
| owner or operator for post-extraction land uses instead of the | |
| post-extraction land use plan required under Subsection (b)(5). | |
| (f) The commission shall inspect a facility for compliance | |
| with this section during regular inspections under this chapter and | |
| Chapter 28A, Water Code. | |
| Sec. 382.0652. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING | |
| FACILITIES: NOTICE AND HEARING. (a) A person may not begin | |
| construction of a new or modification of an existing rock crushing | |
| facility under a standard permit issued under Section 382.0651 | |
| unless the commission authorizes the person to use the permit as | |
| provided by this section. The notice and hearing requirements of | |
| this section apply only to an application for authorization to use a | |
| standard permit issued under Section 382.0651. An applicant for a | |
| permit for a rock crushing facility that does not meet the | |
| requirements of a standard permit issued under Section 382.0651 | |
| must comply with: | |
| (1) Section 382.058 to obtain authorization to use a | |
| standard permit issued under Section 382.05195 or a permit by rule | |
| adopted under Section 382.05196; or | |
| (2) Section 382.056 to obtain a permit issued under | |
| Section 382.0518. | |
| (b) An applicant for an authorization to use a standard | |
| permit issued under Section 382.0651 must publish notice under this | |
| section not later than the earlier of: | |
| (1) the 30th day after the date the applicant receives | |
| written notice from the executive director that the application is | |
| technically complete; or | |
| (2) the 75th day after the date the executive director | |
| receives the application. | |
| (c) The applicant must publish notice at least once in a | |
| newspaper of general circulation in the municipality in which the | |
| facility is located or proposed to be located or in the municipality | |
| nearest to the location or proposed location of the facility. If | |
| the elementary or middle school nearest to the location or proposed | |
| location of the facility provides a bilingual education program as | |
| required by Subchapter B, Chapter 29, Education Code, the applicant | |
| must also publish the notice at least once in an additional | |
| publication of general circulation in each municipality or county | |
| in which the facility is located or proposed to be located that is | |
| published in the language taught in the bilingual education | |
| program. This requirement is waived if such a publication does not | |
| exist or if the publisher refuses to publish the notice. | |
| (d) The notice must include: | |
| (1) a brief description of the location or proposed | |
| location and nature of the facility; | |
| (2) a description, including a telephone number, of | |
| the manner in which the executive director may be contacted for | |
| further information; | |
| (3) a description, including a telephone number, of | |
| the manner in which the applicant may be contacted for further | |
| information; | |
| (4) the location and hours of operation of the | |
| commission's regional office at which a copy of the application is | |
| available for review and copying; and | |
| (5) a brief description of the public comment process, | |
| including the time and location of the public hearing, and the | |
| mailing address and deadline for filing written comments. | |
| (e) The public comment period begins on the first date | |
| notice is published under Subsection (b) and extends to the close of | |
| the public hearing. | |
| (f) Not later than the 30th day before the date of the public | |
| hearing, the commission shall notify the following entities of the | |
| date, time, and place of the hearing: | |
| (1) each municipality and county in which the facility | |
| is located or proposed to be located; | |
| (2) the Texas Department of Transportation; | |
| (3) each groundwater conservation district with | |
| jurisdiction over the area in which the facility is located or | |
| proposed to be located; and | |
| (4) each state representative and state senator | |
| representing the area in which the facility is located or proposed | |
| to be located. | |
| (g) Section 382.056 of this code and Chapter 2001, | |
| Government Code, do not apply to a public hearing held under this | |
| section. A public hearing held under this section is not an | |
| evidentiary proceeding. Any person may submit an oral or written | |
| statement concerning the application at the public hearing. The | |
| applicant may set reasonable limits on the time allowed for oral | |
| statements at the public hearing. | |
| (h) The applicant, in cooperation with the executive | |
| director, must hold the public hearing not less than 30 days and not | |
| more than 45 days after the first date notice is published under | |
| Subsection (b). The public hearing must be held in the county in | |
| which the facility is located or proposed to be located. | |
| (i) Not later than the 35th day after the date the public | |
| hearing is held, the executive director shall approve or deny the | |
| application for authorization to use the standard permit. The | |
| executive director shall base the decision on whether the | |
| application meets the requirements of Section 382.0651. The | |
| executive director shall consider all comments received during the | |
| public comment period and at the public hearing in determining | |
| whether to approve the application. If the executive director | |
| denies the application, the executive director shall state the | |
| reasons for the denial and any modifications to the application | |
| that are necessary for the facility to qualify for the | |
| authorization. | |
| (j) The executive director shall issue a written response to | |
| any relevant and material public comments received related to the | |
| issuance of an authorization to use the standard permit at the same | |
| time as or as soon as practicable after the executive director | |
| grants or denies the application. Issuance of the response after | |
| the granting or denial of the application does not affect the | |
| validity of the executive director's decision to grant or deny the | |
| application. The executive director shall: | |
| (1) mail the response to each person who filed a | |
| comment; and | |
| (2) make the response available to the public. | |
| Sec. 382.0653. CITIZEN ADVISORY COMMITTEE FOR ROCK CRUSHING | |
| FACILITIES. (a) This section applies only to a permit issued under | |
| this chapter, or an authorization to use a permit issued under this | |
| chapter, to operate a rock crushing facility. | |
| (b) The commission shall establish a citizen advisory | |
| committee to act as a liaison between the commission, an applicant | |
| for a permit or an authorization to use a permit, and neighboring | |
| communities during the application process to identify community | |
| concerns. Section 2110.008, Government Code, does not apply to the | |
| citizen advisory committee. | |
| SECTION 4. This Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.