Senate Committee Report
Underlined text would be added to current law. Struck-through text would be removed.
| By: Miles, Hancock | S.B. No. 2919 | |
| (In the Senate - Filed March 14, 2025; April 7, 2025, read | ||
| first time and referred to Committee on Health & Human Services; | ||
| May 12, 2025, reported adversely, with favorable Committee | ||
| Substitute by the following vote: Yeas 7, Nays 1; May 12, 2025, | ||
| sent to printer.) | ||
| Click here to see the committee vote | ||
| COMMITTEE SUBSTITUTE FOR S.B. No. 2919 | By: Miles |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to power duration requirements in emergency contingency | |
| plans adopted by end stage renal disease facilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 251.017, Health and Safety Code, is | |
| amended by amending Subsection (b) and adding Subsection (f) to | |
| read as follows: | |
| (b) Unless the facility adopts a plan described by | |
| Subsection (d) or (e), an end stage renal disease facility must | |
| adopt an emergency contingency plan as required by Subsection (a) | |
| under which the facility is required: | |
| (1) to have an on-site emergency generator that: | |
| (A) has a type 2 essential electrical | |
| distribution system in accordance with the National Fire Protection | |
| Association 99, Section 4.5, and the National Fire Protection | |
| Association 110; | |
| (B) is installed, tested, and maintained in | |
| accordance with the National Fire Protection Association 99, | |
| Section 4.5.4, and the National Fire Protection Association 110; | |
| and | |
| (C) is kept at all times not less than 10 feet | |
| from the electrical transformer; | |
| (2) except as provided by Subsection (c), to maintain: | |
| (A) an on-site fuel source with sufficient [ |
|
| not less than 72 [ |
|
| demand on the emergency generator for that period; or | |
| (B) an on-site battery-powered generator with | |
| sufficient electrical capacity to power the facility for not less | |
| than 72 hours; | |
| (3) to maintain a sufficient quantity of potable water | |
| on-site to operate the facility's water treatment system for not | |
| less than 24 hours; and | |
| (4) to maintain a water valve connection that allows | |
| an outside vendor to provide potable water to operate the | |
| facility's water treatment system. | |
| (f) If an end stage renal disease facility determines it is | |
| not feasible for the facility to install or maintain an on-site fuel | |
| storage tank with capacity sufficient to store the fuel required | |
| under Subsection (b)(2)(A), the facility must enter into an | |
| agreement with a third party for the party to provide during a power | |
| outage the fuel required for the facility to comply with that | |
| subsection. | |
| SECTION 2. Not later than December 1, 2025, each end stage | |
| renal disease facility shall modify the facility's emergency | |
| contingency plan as necessary to comply with Section 251.017(b), | |
| Health and Safety Code, as amended by this Act. | |
| SECTION 3. This Act takes effect September 1, 2025. | |
| * * * * * |