Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 2025S0155-1 02/28/25 | ||
| By: Parker | S.B. No. 1942 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to electricity planning for large loads. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter D, Chapter 39, Utilities Code, is | |
| amended by adding Section 39.169 to read as follows: | |
| Sec. 39.169. LARGE LOAD INTERCONNECTION; RELIABILITY | |
| PROGRAM. (a) In this section, "behind-the-meter generation" means | |
| a new generation facility on the retail customer's side of the | |
| meter. | |
| (b) The commission by rule shall require the independent | |
| organization certified under Section 39.151 for the ERCOT power | |
| region to develop and implement an interconnection program to | |
| provide an expedited interconnection process for operators of large | |
| loads who agree to cease consuming energy from the power grid | |
| through deployment of their behind-the-meter generation when | |
| directed to by the independent organization. The program must be | |
| available only to large loads that are a facility at a single site | |
| with an aggregate peak power demand that exceeds a demand threshold | |
| established by the independent organization. The threshold must be | |
| at least 75 megawatts unless the independent organization | |
| determines that a lower threshold will better ensure reliability in | |
| the ERCOT power region. | |
| (c) The program must require the independent organization | |
| certified under Section 39.151 for the ERCOT power region and the | |
| relevant electric cooperative, municipally owned utility, or | |
| transmission and distribution utility to give priority to a large | |
| load in the interconnection queue participating in the program. | |
| (d) The program must provide that: | |
| (1) an interconnection application for a | |
| participating large load with behind-the-meter generation that | |
| agrees to offer the energy generated by the behind-the-meter | |
| generation to the power grid at times directed by the independent | |
| organization or reduce its energy consumption from the power grid | |
| to a minimum level established by the independent organization will | |
| be given priority over other interconnection applications that are | |
| pending before the independent organization and the relevant | |
| electric cooperative, municipally owned utility, or transmission | |
| and distribution utility, including any applications from other | |
| participating large loads without behind-the-meter generation; | |
| (2) if applicable, the generator interconnection | |
| application for a participating large load's behind-the-meter | |
| generation will be processed in parallel with the load | |
| interconnection application; and | |
| (3) an applicant for participation in the program may | |
| choose: | |
| (A) if authorized by the independent | |
| organization and the relevant electric cooperative, municipally | |
| owned utility, or transmission and distribution utility, to | |
| contract with a vendor approved by the relevant electric | |
| cooperative, municipally owned utility, or transmission and | |
| distribution utility or by the independent organization to perform | |
| all studies required by the relevant electric cooperative, | |
| municipally owned utility, or transmission and distribution | |
| utility before the approval of the interconnection application; | |
| (B) to procure equipment required for the | |
| interconnection in accordance with technical specifications | |
| provided by the relevant electric cooperative, municipally owned | |
| utility, or transmission and distribution utility; and | |
| (C) to construct interconnection facilities in | |
| accordance with technical and other requirements of the relevant | |
| electric cooperative, municipally owned utility, or transmission | |
| and distribution utility. | |
| (e) The program shall provide that studies required by an | |
| electric cooperative, municipally owned utility, or transmission | |
| and distribution utility before the approval of an interconnection | |
| application for a participating large load may evaluate the load as | |
| non-firm. | |
| SECTION 2. This Act takes effect September 1, 2025. |