Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R13843 SCR-D | ||
| By: Schwertner | S.B. No. 1824 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the removal of battery energy storage facilities. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Title 6, Utilities Code, is amended by adding | |
| Chapter 303 to read as follows: | |
| CHAPTER 303. BATTERY ENERGY STORAGE FACILITY AGREEMENTS | |
| Sec. 303.0001. DEFINITIONS. In this chapter: | |
| (1) "Battery energy storage facility" includes: | |
| (A) a battery energy storage resource; and | |
| (B) a facility or equipment, other than a | |
| facility or equipment owned by an electric utility, as defined by | |
| Section 31.002, used to support the operation of a battery energy | |
| storage resource, including an underground or aboveground | |
| electrical transmission or communications line, an electric | |
| transformer, a power conversion system, a battery management | |
| system, a heating, ventilation, and air conditioning system, | |
| telecommunications equipment, a road, or a maintenance yard. | |
| (2) "Battery energy storage facility agreement" means | |
| a lease agreement between a grantee and a landowner that authorizes | |
| the grantee to operate a battery energy storage facility on the | |
| leased property. | |
| (3) "Battery energy storage resource" means a battery | |
| energy storage system, whether connected at the transmission or | |
| distribution level, that is used to provide energy or ancillary | |
| services at wholesale and is not registered with the independent | |
| organization certified under Section 39.151 for the ERCOT power | |
| region as a self-generator. | |
| (4) "Commercial operations date" means the date on | |
| which the battery energy storage resource is approved for | |
| participation in market operations by a regional transmission | |
| organization and does not include the generation of electrical | |
| energy or other operations conducted before that date for purposes | |
| of maintenance and testing. | |
| (5) "Grantee" means a person, other than an electric | |
| utility, as defined by Section 31.002, who: | |
| (A) leases property from a landowner; and | |
| (B) operates a battery energy storage facility on | |
| the property. | |
| (6) "Recycle" means the processing, including | |
| disassembling, dismantling, and shredding of battery energy | |
| storage cells, modules or other equipment, or their components, to | |
| recover a usable product. | |
| Sec. 303.0002. APPLICABILITY. An agreement that authorizes | |
| the grantee to operate a battery energy storage facility: | |
| (1) in the same modeled generation station and | |
| interconnected at the same point of interconnection as a wind power | |
| facility is subject to Chapter 301 and this chapter; or | |
| (2) in the same modeled generation station and | |
| interconnected at the same point of interconnection as a solar | |
| power facility is subject to Chapter 302 and this chapter. | |
| Sec. 303.0003. WAIVER VOID; REMEDIES. (a) A provision of a | |
| battery energy storage facility agreement that purports to waive a | |
| right or exempt a grantee from a liability or duty established by | |
| this chapter is void. | |
| (b) A person who is harmed by a violation of this chapter is | |
| entitled to appropriate injunctive relief to prevent further | |
| violation of this chapter. | |
| (c) The provisions of this section are not exclusive. The | |
| remedies provided in this section are in addition to any other | |
| procedures or remedies provided by other law. | |
| Sec. 303.0004. REQUIRED AGREEMENT PROVISIONS ON FACILITY | |
| REMOVAL. (a) A battery energy storage facility agreement must | |
| provide that the grantee is responsible for removing the battery | |
| energy storage facility from the landowner's property and that the | |
| grantee shall, in accordance with any other applicable laws or | |
| regulations, safely: | |
| (1) clear, clean, and remove from the property each | |
| battery energy storage resource, transformer, and substation; | |
| (2) for each foundation of a battery energy storage | |
| resource, transformer, or substation installed in the ground: | |
| (A) clear, clean, and remove the foundation from | |
| the ground to a depth of at least three feet below the surface grade | |
| of the land in which the foundation is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property; | |
| (3) for each buried cable, including power, | |
| fiber-optic, and communications cables, installed in the ground: | |
| (A) clear, clean, and remove the cable from the | |
| ground to a depth of at least three feet below the surface grade of | |
| the land in which the cable is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property; and | |
| (4) clear, clean, and remove from the property each | |
| overhead power or communications line installed by the grantee on | |
| the property. | |
| (b) The agreement must provide that the grantee is | |
| responsible for: | |
| (1) collecting and reusing or recycling, or shipping | |
| for reuse or recycling, all components of the battery energy | |
| storage facility practicably capable of being reused or recycled, | |
| in accordance with any other applicable laws or regulations; and | |
| (2) properly disposing of components of the battery | |
| energy storage facility not practicably capable of being reused or | |
| recycled: | |
| (A) at a facility authorized under state and | |
| federal law to dispose of hazardous substances for a component | |
| considered hazardous under those laws; or | |
| (B) for nonhazardous components, at a municipal | |
| solid waste landfill or other appropriate waste disposal facility | |
| authorized under state and federal law to dispose of that type of | |
| component. | |
| (c) The agreement must provide that, at the request of the | |
| landowner, the grantee shall: | |
| (1) clear, clean, and remove each road constructed by | |
| the grantee on the property; and | |
| (2) ensure that each hole or cavity created in the | |
| ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property. | |
| (d) The agreement must provide that, at the request of the | |
| landowner, if reasonable, the grantee shall: | |
| (1) remove from the property all rocks over 12 inches | |
| in diameter excavated during the decommissioning or removal | |
| process; | |
| (2) return the property to a tillable state using | |
| scarification, V-rip, or disc methods, as appropriate; and | |
| (3) ensure that: | |
| (A) each hole or cavity created in the ground by | |
| the removal is filled with soil of the same type or a similar type as | |
| the predominant soil found on the property; and | |
| (B) the surface is returned as near as reasonably | |
| possible to the same condition as before the grantee dug holes or | |
| cavities, including by reseeding pastureland with native grasses | |
| prescribed by an appropriate governmental agency, if any. | |
| (e) The landowner shall make a request under Subsection (c) | |
| or (d) not later than the 180th day after the later of: | |
| (1) the date on which the battery energy storage | |
| resource is no longer capable of generating electricity in | |
| commercial quantities; or | |
| (2) the date the landowner receives written notice of | |
| intent to decommission the battery energy storage facility from the | |
| grantee. | |
| Sec. 303.0005. REQUIRED AGREEMENT PROVISIONS ON FINANCIAL | |
| ASSURANCE. (a) A battery energy storage facility agreement must | |
| provide that the grantee shall obtain and deliver to the landowner | |
| evidence of financial assurance that conforms to the requirements | |
| of this section to secure the performance of the grantee's | |
| obligations under Section 303.0004. Acceptable forms of financial | |
| assurance include a parent company guaranty with a minimum | |
| investment grade credit rating for the parent company issued by a | |
| major domestic credit rating agency, a letter of credit, a bond, or | |
| another form of financial assurance reasonably acceptable to the | |
| landowner. | |
| (b) The amount of financial assurance must be at least equal | |
| to the estimated amount by which the cost of removing the battery | |
| energy storage facilities from the landowner's property, recycling | |
| or disposing of all the components of the battery energy storage | |
| facilities, and restoring the property to as near as reasonably | |
| possible the condition of the property as of the date the agreement | |
| begins, as described by Section 303.0004, exceeds the salvage value | |
| of the battery energy storage facilities, less any portion of the | |
| value of the battery energy storage facilities pledged to secure | |
| outstanding debt. | |
| (c) The agreement must provide that: | |
| (1) the estimated cost of removing the battery energy | |
| storage facilities from the landowner's property, recycling or | |
| disposing of all the components of the battery energy storage | |
| facilities, and restoring the property to as near as reasonably | |
| possible the condition of the property as of the date the agreement | |
| begins, as described by Section 303.0004, and the estimated salvage | |
| value of the battery energy storage facilities must be determined | |
| by an independent, third-party professional engineer licensed in | |
| this state; | |
| (2) the grantee must deliver to the landowner the | |
| estimated cost of removal and recycling or disposal of the battery | |
| energy storage facilities and the salvage value on or before the | |
| 10th anniversary of the commercial operations date of the battery | |
| energy storage facilities; and | |
| (3) the grantee must deliver an updated estimate of | |
| the cost and salvage value described by Subdivision (2) at least | |
| once every five years after the initial estimate for the remainder | |
| of the term of the agreement. | |
| (d) The grantee is responsible for the costs of obtaining | |
| financial assurance described by this section and determining the | |
| estimated removal, recycling, and disposal costs and salvage value. | |
| (e) The agreement must provide that the grantee shall | |
| deliver financial assurance not later than the earlier of: | |
| (1) the date the battery energy storage facility | |
| agreement is terminated; or | |
| (2) the 15th anniversary of the commercial operations | |
| date of the battery energy storage facilities located on the | |
| landowner's leased property. | |
| (f) The grantee is responsible for ensuring that the amount | |
| of financial assurance remains sufficient to cover the amount | |
| required by Subsection (b), consistent with the estimates required | |
| by this section. | |
| (g) The grantee may not cancel financial assurance before | |
| the date the grantee has completed the grantee's obligation to | |
| remove the grantee's battery energy storage facilities located on | |
| the landowner's property in the manner provided by this chapter, | |
| unless the grantee provides the landowner with replacement | |
| financial assurance at the time of or before the cancellation. In | |
| the event of a transfer of ownership of the grantee's battery energy | |
| storage facilities, financial assurance provided by the grantee | |
| shall remain in place until the date evidence of financial | |
| assurance meeting the requirements of this chapter is provided to | |
| the landowner. | |
| SECTION 2. Chapter 303, Utilities Code, as added by this | |
| Act, applies only to a battery energy storage facility agreement | |
| entered into on or after the effective date of this Act. | |
| SECTION 3. This Act takes effect September 1, 2025. |