Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R4312 JXC-D | ||
| By: Hall | S.B. No. 1478 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the removal of certain power facilities operated on | |
| leased property. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Chapter 301, Utilities Code, is transferred to | |
| Subtitle B, Title 5, Health and Safety Code, redesignated as | |
| Chapter 375, Health and Safety Code, and amended to read as follows: | |
| CHAPTER 375 [ |
|
| ASSURANCE | |
| Sec. 375.0001 [ |
|
| (1) "Commission" means the Texas Commission on | |
| Environmental Quality. | |
| (2) "Electric energy storage facility agreement" | |
| means a lease agreement between a grantee and a landowner that | |
| authorizes the grantee to operate an electric energy storage | |
| facility on the leased property. | |
| (3) "Grantee" means a person who[ |
|
| [ |
|
| [ |
|
| (4) "Renewable power facility" means a facility that: | |
| (A) generates electric energy using a renewable | |
| energy technology, as defined by Section 39.916, Utilities Code, | |
| other than a technology that relies exclusively on wind or solar | |
| energy; and | |
| (B) is not an electric energy storage facility. | |
| (5) "Renewable power facility agreement" means a lease | |
| agreement between a grantee and a landowner that authorizes the | |
| grantee to operate a renewable power facility on the leased | |
| property. | |
| (6) "Solar energy device" has the meaning assigned by | |
| Section 185.001, Utilities Code. | |
| (7) "Solar power facility" includes: | |
| (A) a solar energy device; and | |
| (B) a facility or equipment, other than a | |
| facility or equipment owned by an electric utility, as defined by | |
| Section 31.002, Utilities Code, used to support the operation of a | |
| solar energy device, including an underground or aboveground | |
| electrical transmission or communications line, an electric | |
| transformer, a battery storage facility, an energy storage | |
| facility, telecommunications equipment, a road, a meteorological | |
| tower, or a maintenance yard. | |
| (8) "Solar power facility agreement" means a lease | |
| agreement between a grantee and a landowner that authorizes the | |
| grantee to operate a solar power facility on the leased property. | |
| (9) [ |
|
| (A) a wind turbine generator; and | |
| (B) a facility or equipment used to support the | |
| operation of a wind turbine generator, including an underground or | |
| aboveground electrical transmission or communications line, an | |
| electric transformer, a battery storage facility, an energy storage | |
| facility, telecommunications equipment, a road, a meteorological | |
| tower with wind measurement equipment, or a maintenance yard. | |
| (10) [ |
|
| lease agreement between a grantee and a landowner that authorizes | |
| the grantee to operate a wind power facility on the leased property. | |
| Sec. 375.0002. APPLICABILITY. This chapter applies only to | |
| an electric energy storage facility, a renewable power facility, a | |
| solar power facility, or a wind power facility that is intended to | |
| provide energy or ancillary services at wholesale for a power grid. | |
| Sec. 375.0003 [ |
|
| provision of an electric energy storage facility agreement, a | |
| renewable power facility agreement, a solar power facility | |
| agreement, or a wind power facility agreement that purports to | |
| waive a right or exempt a grantee from a liability or duty | |
| established by this chapter is void. | |
| (b) A person who is harmed by a violation of this chapter is | |
| entitled to appropriate injunctive relief to prevent further | |
| violation of this chapter. | |
| (c) The provisions of this section are not exclusive. The | |
| remedies provided in this section are in addition to any other | |
| procedures or remedies provided by other law. | |
| Sec. 375.0004 [ |
|
| WIND POWER FACILITY REMOVAL. (a) A wind power facility agreement | |
| must provide that the grantee is responsible for removing the | |
| grantee's wind power facilities from the landowner's property and | |
| that the grantee shall, in accordance with any other applicable | |
| laws or regulations, safely: | |
| (1) clear, clean, and remove from the property: | |
| (A) each wind turbine generator, including | |
| towers and pad-mount transformers; | |
| (B) all liquids, greases, or similar substances | |
| contained in a wind turbine generator; | |
| (C) each substation; and | |
| (D) all liquids, greases, or similar substances | |
| contained in a substation; | |
| (2) for each tower foundation and pad-mount | |
| transformer foundation installed in the ground: | |
| (A) clear, clean, and remove the foundation from | |
| the ground to a depth of at least three feet below the surface grade | |
| of the land in which the foundation is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with topsoil of the same type or | |
| a similar type as the predominant topsoil found on the property; | |
| (3) for each buried cable, including power, | |
| fiber-optic, and communications cables, installed in the ground: | |
| (A) clear, clean, and remove the cable from the | |
| ground to a depth of at least three feet below the surface grade of | |
| the land in which the cable is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with topsoil of the same type or | |
| a similar type as the predominant topsoil found on the property; and | |
| (4) clear, clean, and remove from the property each | |
| overhead power or communications line installed by the grantee on | |
| the property. | |
| (b) The agreement must provide that, at the request of the | |
| landowner, the grantee shall: | |
| (1) clear, clean, and remove each road constructed by | |
| the grantee on the property; and | |
| (2) ensure that each hole or cavity created in the | |
| ground by the removal is filled with topsoil of the same type or a | |
| similar type as the predominant topsoil found on the property. | |
| (c) The agreement must provide that, at the request of the | |
| landowner, if reasonable, the grantee shall: | |
| (1) remove from the property all rocks over 12 inches | |
| in diameter excavated during the decommissioning or removal | |
| process; | |
| (2) return the property to a tillable state using | |
| scarification, V-rip, or disc methods, as appropriate; and | |
| (3) ensure that: | |
| (A) each hole or cavity created in the ground by | |
| the removal is filled with topsoil of the same type or a similar | |
| type as the predominant topsoil found on the property; and | |
| (B) the surface is returned as near as reasonably | |
| possible to the same condition as before the grantee dug holes or | |
| cavities, including by reseeding pastureland with native grasses | |
| prescribed by an appropriate governmental agency, if any. | |
| (d) The landowner shall make a request under Subsection (b) | |
| or (c) not later than the 180th day after the later of: | |
| (1) the date on which the wind power facility is no | |
| longer capable of generating electricity in commercial quantities; | |
| or | |
| (2) the date the landowner receives written notice of | |
| intent to decommission the wind power facility from the grantee. | |
| Sec. 375.0005. REQUIRED AGREEMENT PROVISIONS ON SOLAR POWER | |
| FACILITY REMOVAL. (a) A solar power facility agreement must | |
| provide that the grantee is responsible for removing the grantee's | |
| solar power facilities from the landowner's property and that the | |
| grantee shall, in accordance with any other applicable laws or | |
| regulations, safely: | |
| (1) clear, clean, and remove from the property each | |
| solar energy device, transformer, and substation; | |
| (2) for each foundation of a solar energy device, | |
| transformer, or substation installed in the ground: | |
| (A) clear, clean, and remove the foundation from | |
| the ground to a depth of at least three feet below the surface grade | |
| of the land in which the foundation is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property; | |
| (3) for each buried cable, including power, | |
| fiber-optic, and communications cables, installed in the ground: | |
| (A) clear, clean, and remove the cable from the | |
| ground to a depth of at least three feet below the surface grade of | |
| the land in which the cable is installed; and | |
| (B) ensure that each hole or cavity created in | |
| the ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property; and | |
| (4) clear, clean, and remove from the property each | |
| overhead power or communications line installed by the grantee on | |
| the property. | |
| (b) The agreement must provide that, at the request of the | |
| landowner, the grantee shall: | |
| (1) clear, clean, and remove each road constructed by | |
| the grantee on the property; and | |
| (2) ensure that each hole or cavity created in the | |
| ground by the removal is filled with soil of the same type or a | |
| similar type as the predominant soil found on the property. | |
| (c) The agreement must provide that, at the request of the | |
| landowner, if reasonable, the grantee shall: | |
| (1) remove from the property all rocks over 12 inches | |
| in diameter excavated during the decommissioning or removal | |
| process; | |
| (2) return the property to a tillable state using | |
| scarification, V-rip, or disc methods, as appropriate; and | |
| (3) ensure that: | |
| (A) each hole or cavity created in the ground by | |
| the removal is filled with soil of the same type or a similar type as | |
| the predominant soil found on the property; and | |
| (B) the surface is returned as near as reasonably | |
| possible to the same condition as before the grantee dug holes or | |
| cavities, including by reseeding pastureland with native grasses | |
| prescribed by an appropriate governmental agency, if any. | |
| (d) The landowner shall make a request under Subsection (b) | |
| or (c) not later than the 180th day after the later of: | |
| (1) the date on which the solar power facility is no | |
| longer capable of generating electricity in commercial quantities; | |
| or | |
| (2) the date the landowner receives written notice of | |
| intent to decommission the solar power facility from the grantee. | |
| Sec. 375.0006. REQUIRED AGREEMENT PROVISIONS ON ELECTRIC | |
| ENERGY STORAGE OR RENEWABLE POWER FACILITY REMOVAL. An electric | |
| energy storage facility agreement or renewable power facility | |
| agreement must provide that the grantee is responsible for: | |
| (1) removing the grantee's electric energy storage | |
| facilities or renewable power facilities, as applicable, from the | |
| landowner's property; and | |
| (2) restoring the property to as near as reasonably | |
| possible the condition of the property as of the date the agreement | |
| begins. | |
| Sec. 375.0007 [ |
|
| FINANCIAL ASSURANCE. (a) An electric energy storage facility | |
| agreement, a renewable power facility agreement, a solar power | |
| facility agreement, or a [ |
|
| provide that the grantee shall obtain and deliver to the commission | |
| [ |
|
| landowner that conforms to the requirements of this section to | |
| secure the performance of the grantee's obligation to remove the | |
| grantee's electric energy storage facilities, renewable power | |
| facilities, solar power facilities, or wind power facilities | |
| located on the landowner's property as required by this chapter [ |
|
| financial assurance may be [ |
|
| acceptable to the landowner. | |
| (b) The amount of the financial assurance must be at least | |
| equal to the estimated amount by which the cost of removing the | |
| [ |
|
| the property to as near as reasonably possible the condition of the | |
| property as of the date the agreement begins exceeds the salvage | |
| value of the [ |
|
| of the [ |
|
| (c) The agreement must provide that: | |
| (1) the estimated cost of removing the [ |
|
| facilities from the landowner's property and restoring the property | |
| to as near as reasonably possible the condition of the property as | |
| of the date the agreement begins and the estimated salvage value of | |
| the [ |
|
| third-party professional engineer licensed in this state; | |
| (2) the grantee must deliver to the landowner and the | |
| commission an updated estimate, prepared by an independent, | |
| third-party professional engineer licensed in this state, of the | |
| cost of removal and the salvage value at least once every five years | |
| for the remainder of the term of the agreement; and | |
| (3) the grantee is responsible for ensuring that the | |
| amount of the financial assurance remains sufficient to cover the | |
| amount required by Subsection (b), consistent with the estimates | |
| required by this subsection. | |
| (d) The grantee is responsible for the costs of obtaining | |
| financial assurance described by this section and costs of | |
| determining the estimated removal costs and salvage value. | |
| (e) The agreement must provide that the grantee shall | |
| deliver the financial assurance to the commission not later than | |
| the 30th day after [ |
|
| [ |
|
| begins [ |
|
| [ |
|
| (f) [ |
|
| [ |
|
| the date the grantee has completed the grantee's obligation to | |
| remove the grantee's [ |
|
| landowner's property as required [ |
|
| chapter, unless the grantee provides the commission [ |
|
| with replacement financial assurance at the time of or before the | |
| cancellation. In the event of a transfer of ownership of the | |
| grantee's [ |
|
| by the grantee shall remain in place until the date evidence of | |
| financial security meeting the requirements of this chapter is | |
| provided to the commission [ |
|
| Sec. 375.0008. RELEASE OF FINANCIAL ASSURANCE TO GRANTEE. | |
| (a) At any time, a grantee may file an application with the | |
| commission for the release of all or part of a bond or other | |
| financial assurance provided to the commission by the grantee for a | |
| landowner under this chapter. | |
| (b) The application must be on a form prescribed by the | |
| commission and, in addition to other information the commission may | |
| require, must include the type and the approximate date of removal | |
| and restoration work performed and a description of the results | |
| achieved. | |
| (c) The grantee shall provide a copy of the application to | |
| the landowner not later than the 30th day after the date the grantee | |
| files the application with the commission. | |
| (d) Not later than the 45th day after the date the grantee | |
| files the application, the commission shall conduct an inspection | |
| and evaluation of the removal and restoration work performed. | |
| (e) The commission may release all or part of the financial | |
| assurance if the commission determines that the grantee has | |
| completed all or part of the grantee's obligations under the | |
| agreement entered into under Section 375.0004, 375.0005, or | |
| 375.0006, as applicable. | |
| (f) If the commission disapproves the application for | |
| release of the financial assurance, the commission shall notify the | |
| grantee in writing of the reasons for disapproval and recommend | |
| corrective actions necessary to secure the release of the financial | |
| assurance. | |
| Sec. 375.0009. FORFEITURE OF FINANCIAL ASSURANCE TO | |
| LANDOWNER. (a) A landowner may file an application with the | |
| commission for the forfeiture of all or part of a bond or other | |
| financial assurance provided to the commission by a grantee for the | |
| landowner under this chapter if: | |
| (1) the grantee has not completed the grantee's | |
| obligations under the agreement entered into under Section | |
| 375.0004, 375.0005, or 375.0006, as applicable; and | |
| (2) the facility that is the subject of the agreement | |
| is no longer being used by the grantee to provide energy or | |
| ancillary services at wholesale for a power grid in the manner | |
| provided by the agreement. | |
| (b) The application must be on a form prescribed by the | |
| commission. | |
| (c) The landowner shall provide a copy of the application to | |
| the grantee not later than the 30th day after the date the landowner | |
| files the application with the commission. | |
| (d) Not later than the 45th day after the date the landowner | |
| files the application, the commission shall conduct an inspection | |
| and evaluation of the property for which the financial assurance | |
| was provided. | |
| (e) The commission may approve the forfeiture of all or part | |
| of the financial assurance if the commission determines that: | |
| (1) the facility that is the subject of the agreement | |
| is no longer being used in the manner described by Subsection | |
| (a)(2); and | |
| (2) the forfeiture is necessary to compensate the | |
| landowner for any remaining removal and restoration work the | |
| grantee was required to but did not complete under the agreement. | |
| (f) If the commission disapproves the application for | |
| forfeiture of the financial assurance, the commission shall notify | |
| the landowner in writing of the reasons for disapproval. | |
| Sec. 375.0010. COMMISSION AUTHORITY. (a) The commission | |
| shall notify the Public Utility Commission of Texas if the | |
| commission requires forfeiture of financial assurance under | |
| Section 375.0009. The commission and the Public Utility Commission | |
| of Texas may not issue to a grantee whose financial assurance was | |
| forfeited under Section 375.0009 any permit, certificate, or | |
| registration under other law that authorizes the grantee to operate | |
| a generation facility to which this chapter applies or renew any | |
| such permit, certificate, or registration. | |
| (b) In a suit for receivership, garnishment, or bankruptcy, | |
| or in any other legal action affecting the assets of a grantee that | |
| is a party to an agreement subject to this chapter, the commission | |
| may: | |
| (1) inform the appropriate court and parties of the | |
| commission's interest in obtaining notice of the proceedings; and | |
| (2) within the time prescribed by the applicable | |
| statutes, rules, and court orders, intervene and participate in any | |
| proceedings that affect a landowner not joined in the suit who is a | |
| party to the agreement with the grantee. | |
| SECTION 2. Section 5.013(a), Water Code, is amended to read | |
| as follows: | |
| (a) The commission has general jurisdiction over: | |
| (1) water and water rights including the issuance of | |
| water rights permits, water rights adjudication, cancellation of | |
| water rights, and enforcement of water rights; | |
| (2) continuing supervision over districts created | |
| under Article III, Sections 52(b)(1) and (2), and Article XVI, | |
| Section 59, of the Texas Constitution; | |
| (3) the state's water quality program including | |
| issuance of permits, enforcement of water quality rules, standards, | |
| orders, and permits, and water quality planning; | |
| (4) the determination of the feasibility of certain | |
| federal projects; | |
| (5) the adoption and enforcement of rules and | |
| performance of other acts relating to the safe construction, | |
| maintenance, and removal of dams; | |
| (6) conduct of the state's hazardous spill prevention | |
| and control program; | |
| (7) the administration of the state's program relating | |
| to inactive hazardous substance, pollutant, and contaminant | |
| disposal facilities; | |
| (8) the administration of a portion of the state's | |
| injection well program; | |
| (9) the administration of the state's programs | |
| involving underground water and water wells and drilled and mined | |
| shafts; | |
| (10) the state's responsibilities relating to regional | |
| waste disposal; | |
| (11) the responsibilities assigned to the commission | |
| by Chapters 361, 363, 375, 382, 401, 505, 506, and 507, Health and | |
| Safety Code; and | |
| (12) any other areas assigned to the commission by | |
| this code and other laws of this state. | |
| SECTION 3. (a) The heading to Title 6, Utilities Code, is | |
| repealed. | |
| (b) Chapter 302, Utilities Code, is repealed. | |
| SECTION 4. The changes in law made by this Act apply only to | |
| an electric energy storage facility agreement, a renewable power | |
| facility agreement, a solar power facility agreement, or a wind | |
| power facility agreement entered into on or after the effective | |
| date of this Act. An agreement entered into before the effective | |
| date of this Act is governed by the law applicable to the agreement | |
| on the date the agreement was entered into, and that law is | |
| continued in effect for that purpose. | |
| SECTION 5. This Act takes effect immediately if it receives | |
| a vote of two-thirds of all the members elected to each house, as | |
| provided by Section 39, Article III, Texas Constitution. If this | |
| Act does not receive the vote necessary for immediate effect, this | |
| Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.