Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R3501 JXC-D | ||
| By: Reynolds | H.B. No. 838 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the interconnection of the ERCOT power grid to grids | |
| outside the ERCOT power region. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subtitle B, Title 2, Utilities Code, is amended | |
| by adding Chapter 39A to read as follows: | |
| CHAPTER 39A. INTERCONNECTION OF FACILITIES IN ERCOT TO GRIDS | |
| OUTSIDE ERCOT POWER REGION | |
| Sec. 39A.0101. UTILITY AND COOPERATIVE AUTHORITY. | |
| Notwithstanding any other law, a transmission and distribution | |
| utility, municipally owned utility, or electric cooperative that | |
| transmits or distributes power purchased at wholesale in the ERCOT | |
| power region may construct, own, and operate facilities as | |
| necessary to: | |
| (1) access transmission service from outside of the | |
| ERCOT power region; and | |
| (2) purchase power at wholesale from outside of the | |
| ERCOT power region. | |
| Sec. 39A.0102. COMMISSION AUTHORITY. (a) The commission | |
| may request any federal approval necessary for the interconnection | |
| of a facility described by Section 39A.0101. | |
| (b) The commission shall require the independent | |
| organization certified for the ERCOT power region under Section | |
| 39.151 to approve the interconnection of a facility described by | |
| Section 39A.0101 unless otherwise provided by federal law or the | |
| commission or the independent organization determines that the | |
| interconnection poses a significant and imminent risk to public | |
| health and safety. | |
| (c) The commission may provide technical and administrative | |
| assistance to a transmission and distribution utility, municipally | |
| owned utility, or electric cooperative seeking to construct, own, | |
| or operate a facility described by Section 39A.0101. | |
| Sec. 39A.0103. SYNCHRONOUS AND NON-SYNCHRONOUS | |
| INTERCONNECTIONS. (a) This chapter applies to synchronous and | |
| non-synchronous interconnections. | |
| (b) Unless otherwise provided by federal law, the | |
| commission shall approve an application for a certificate of | |
| convenience and necessity submitted under Section 39A.0104 by a | |
| transmission and distribution utility, municipally owned utility, | |
| or electric cooperative for a facility that would synchronously | |
| interconnect to a facility outside the ERCOT power region if the | |
| application complies with all applicable provisions of Chapter 37 | |
| and this chapter. | |
| (c) Not later than September 1, 2027, the commission shall | |
| identify transmission facilities in ERCOT that may be synchronously | |
| interconnected with transmission facilities outside of ERCOT for | |
| the purpose of allowing federal regulation of transmission service | |
| and wholesale power sales in ERCOT. Notwithstanding any other law, | |
| the commission shall require a transmission and distribution | |
| utility, municipally owned utility, or electric cooperative that | |
| owns a transmission facility identified by the commission to make | |
| requests, obtain approvals, enter into contracts, and construct | |
| facilities as necessary to synchronously interconnect the facility | |
| with a transmission facility outside of ERCOT. This subsection | |
| expires August 31, 2031. | |
| SECTION 2. Sections 37.051(c-1), (c-2), and (c-3), | |
| Utilities Code, are redesignated as Section 39A.0104, Utilities | |
| Code, and amended to read as follows: | |
| Sec. 39A.0104. CERTIFICATES OF CONVENIENCE AND NECESSITY. | |
| (a) A transmission and distribution utility, [ |
|
| electric cooperative may not interconnect a facility described by | |
| Section 39A.0101 [ |
|
| certificate from the commission in the manner provided by Chapter | |
| 37 and this chapter stating that the interconnection does not pose a | |
| significant and imminent risk to public health and safety [ |
|
| (b) In the case of a conflict between Chapter 37 and this | |
| chapter, this chapter prevails. | |
| (c) Sections 37.056(c)(1) and (2) and (d) do not apply to an | |
| application for a certificate described by Subsection (a). | |
| (d) The commission shall approve an application for a | |
| certificate described by Subsection (a) unless otherwise provided | |
| by federal law or the commission determines that granting the | |
| application poses a significant and imminent risk to public health | |
| and safety. | |
| (e) The transmission and distribution utility, municipally | |
| owned utility, or electric cooperative [ |
|
| commission for a [ |
|
| later than the 180th day before the date the utility or cooperative | |
| [ |
|
| Commission related to the interconnection. | |
| (f) [ |
|
| [ |
|
| the date the application is filed, shall approve an application | |
| [ |
|
| constructed under an interconnection agreement appended to an offer | |
| of settlement approved in a final order of the Federal Energy | |
| Regulatory Commission that was issued in Docket No. TX11-01-001 on | |
| or before December 31, 2014, directing physical connection between | |
| the ERCOT and SERC regions under Sections 210, 211, and 212 of the | |
| Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In | |
| approving the application, the commission may prescribe reasonable | |
| conditions to protect the public interest that are consistent with | |
| the final order of the Federal Energy Regulatory Commission. | |
| (g) [ |
|
| the independent organization certified under Section 39.151 for the | |
| ERCOT power region to adopt rules or protocols of general | |
| applicability. | |
| SECTION 3. This Act takes effect September 1, 2025. |